| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC | ₹2.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.1 Cr+₹24.0 L (8.51%)Rejected-Finance | ₹3.1 Cr+₹24.0 L (8.51%) | L2 | Rejected-Finance L2 |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
8 Dec 2020, 3:00 pmClosed
Project Director
DRDA,Collectorate,Erode
Erode District Improvements of road in Package No. TN 12-158 Anthiyur Block -Forest road- under PMGSY III Batch I 2020-21
2020_RDTN_101493_1
TN12158
Open Tender
Civil Works - Roads
Item Rate
270 days
Anthiyur Block
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹5.8 L
DRDA,Collectorate,Erode
18 Feb 2021
23 Oct 2020
8 Dec 2020
23 Oct 2020
8 Dec 2020
12 Nov 2020
12 Nov 2020
Amount
Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. In Area of Thorny Jungle Km. 0/000 - 3/000
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Carted earth)
Providing and Laying Gravel Shoulders to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Construction of subgrade for 300mm depth by using picked material obtained from the existing surface by mechanical means and then adding 50% of defict materials by using stone dust obtained from quarry with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.(subgrade using stone dust to improve CBR 5-7)
Control Section
For New Technology (Zydex)
Granular subbase - Gr III (Table 400.1) Construction of granular subbase by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 KN static roller capacity to achieve the desired density complete as per Technical Specification clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
Zydex waterproofing - Waterproofing of the shoulder surface by spraying 1kg of Terrasil or Equivalent and 1 kg of Zycobond or Equivalent in the ratio of 1:1:200 with portable water and spraying on the surface @ 3 ltrs/sqm and compacting with a static roller. Complete job Over Sub-Grade
Improving Subgrade using Terrasil and Zycobond
Laying and spreading available soil ( including existing worn out WBM layer metal) in the subgrade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with Terrasil @ 0.6 kg/Cum and Zycobond @0.6 Kg/Cum at Optimum Moisture Content; grading with motor grader and compacting with the smooth two wheeled road roller to the desired density to form a layer of improved Sub-grade as per Technical Specification Clause 403 (refer MORD specifications 402, Page no.4-8)
Grit Layer of 20mm Thick with 13.2mm down size Aggregate Construction of 20mm compacted Grit Layer by way of using blended material comprising of Aggregates of 13.2mm @20%; 11.2mm nominal size @ 20%; Crushed Stone Chipping 6.7 mm size 100% passing 9.5 mm sieve and retained on 2.36 mm sieve @20% & Crushed Sand or Grit Passing 2.36 mm sieve and retained on 180 micron sieve @40% duly mixed with potable water ; duly compacted with Vibratory Roller including maintaining the Camber as per specifications. Complete job , finished work to be measured
High porosity Providing and applying primer coat with cationic bitumen emulsion(water based) modified with Nanotechnology based Penetrative Reactive Water-soluble Organosilane material (forming water clear solution) qualifying as per the test, on prepared surface of granular base including cleaning of road surface and prime coat-mix made using 100 part Cationic Bitumen Emulsion (Grade CSS-Water based) and 200 parts of Nanotechnology Solution (1 kg Terraprime :200 liter water (≤1000ppm TDS) and spraying at the rate of 1.35 Kg/sqm using mechanical means as per Technical Specification.
For New Technology (Zydex) Over Base
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying Tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509( Mix Seal Surfacing )
Control Section
Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen with Zycotherm to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509( Mix Seal Surfacing )
For New Technology
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeding vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron
Logo Board
Sign board
Citizen board
Name Board
Maintenance Board
Provision for KM stones
Provision for HM Stones
Construction of 1.50m span Slab Culvert @ Ch.75, 260,1110, 1927 & 2730
Earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard roack requiring blasting but inclusive of shoring strutting andd requiring the sides of foundation
2 Cluvert @ Ch.KM: 0/0 -1/0 (2x90.090)
2 Culvert @ Ch. Km 1/0 - 2/0 (2x90.090)
1Culvert @ Ch. Km 2/0 - 3/0 (1x90.090)
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specification
2 Cluvert @ Ch.KM: 0/0 -1/0 (2x10.29)
2 Culvert @ Ch. Km 1/0 - 2/0 (2x10.29)
1 Culvert @ Ch. Km 2/0 - 3/0 (1x10.29)
Cement concrete 1:2.5:5 mix using M15 HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
2 Cluvert @ Ch.KM: 0/0 -1/0 (2x10.29)
2 Culvert @ Ch. Km 1/0 - 2/0 (2x10.29)
1 Culvert @ Ch. Km 2/0 - 3/0 (1x10.29)
Cement concrete 1:2:4 mix using M20 HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
2 Cluvert @ Ch.KM: 0/0 -1/0 (2x53.78)
2 Culvert @ Ch. Km 1/0 - 2/0 (2x53.78)
1 Culvert @ Ch. Km 2/0 - 3/0 (1x53.78)
Cement concrete 1:2:4 mix using M20 HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
2 Cluvert @ Ch.KM: 0/0 -1/0 (2x32.06)
2 Culvert @ Ch. Km 1/0 - 2/0 (2x32.06)
1 Culvert @ Ch. Km 2/0 - 3/0 (1x32.06)
Cement concrete 1:2:4 mix using M20 HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
2 Cluvert @ Ch.KM: 0/0 -1/0 (2X3.36)
2 Culvert @ Ch. Km 1/0 - 2/0 (2x3.36)
1 Culvert @ Ch. Km 2/0 - 3/0 (1x3.36)
Cement concrete 1:1.5:3 using M25 ISS HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
2 Cluvert @ Ch.KM: 0/0 -1/0 (2X3.31)
2 Culvert @ Ch. Km 1/0 - 2/0 (2x3.31)
1 Culvert @ Ch. Km 2/0 - 3/0 (1x3.31)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced cement concrete works as per the design given including cost steel and binding wire in all floors etc, Complete complying with standard specification. (MS rod or RTS bar will be supplied departmentally at section stores an cost will be recovered at issue rate). The binding wire shall supplied by the contractor.
2 Cluvert @ Ch.KM: 0/0 -1/0 (2X0.35)
2 Culvert @ Ch. Km 1/0 - 2/0 (2x0.35)
1 Culvert @ Ch. Km 2/0 - 3/0 (1x0.35)
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per drawing andd technical specifications
2 Cluvert @ Ch.KM: 0/0 -1/0 (2X15)
2 Culvert @ Ch. Km 1/0 - 2/0 (2x15)
1 Culvert @ Ch. Km 2/0 - 3/0 (1x15)
Providing and fixing tar paper for bearing between Bed Block & Deck slab
2 Cluvert @ Ch.KM: 0/0 -1/0 (2X15)
2 Culvert @ Ch. Km 1/0 - 2/0 (2x15)
1 Culvert @ Ch. Km 2/0 - 3/0 (1x15)
Providing weelpholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towars drawing face complete as per drawing face complete as per drawing andd technical specification clauses 614, 709, 1204.3.7
2 Cluvert @ Ch.KM: 0/0 -1/0 (2X15)
2 Culvert @ Ch. Km 1/0 - 2/0 (2x15)
1 Culvert @ Ch. Km 2/0 - 3/0 (1x15)
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compcting etc complete complying with standard specifications and as directed by departmental officer
2 Cluvert @ Ch.KM: 0/0 -1/0 (2X8.78)
2 Culvert @ Ch. Km 1/0 - 2/0 (2x8.78)
1 Culvert @ Ch. Km 2/0 - 3/0 (1x8.78)
Construction of 3.00m span Slab Culvert @ Ch.2572m of Bargur road to Sundappur road
Earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard roack requiring blasting but inclusive of shoring strutting andd requiring the sides of foundation
1 Culvert @ Ch.2/0-3/0
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specification
1 Culvert @ Ch.2/0-3/0
Cement concrete 1:2.5:5 mix using M15 HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
1 Culvert @ Ch.2/0-3/0
Cement concrete 1:2:4 mix using 40MM HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
1 Culvert @ Ch.2/0-3/0
Cement concrete 1:2:4 mix using 20MM HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
1 Culvert @ Ch.2/0-3/0
Cement concrete 1:2:4 mix using 20MM HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
1 Culvert @ Ch.2/0-3/0
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
1 Culvert @ Ch.2/0-3/0
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced cement concrete works as per the design given including cost steel and binding wire in all floors etc, Complete complying with standard specification. (MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate). The binding wire shall supplied by the contractor.
1 Culvert @ Ch.2/0-3/0
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per drawing andd technical specifications.
1 Culvert @ Ch.2/0-3/0
Providing and fixing tar paper for bearing between Bed Block & Deck slab
1 Culvert @ Ch.2/0-3/0
Providing weelpholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towars drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
1 Culvert @ Ch.2/0-3/0
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compcting etc complete complying with standard specifications and as directed by departmental officer
1 Culvert @ Ch.2/0-3/0
Construction of 6.00m span Slab Culvert @ Ch.615 of Bargur road to Sundappur road
Earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard roack requiring blasting but inclusive of shoring strutting andd requiring the sides of foundation
1 Culvert @ Ch. 615
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specification
1 Culvert @ Ch. 615
Cement concrete 1:2.5:5 mix using 40MM HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
1 Culvert @ Ch. 615
Cement concrete 1:2:4 mix using 40MM HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
1 Culvert @ Ch. 615
Cement concrete 1:2:4 mix using 40MM HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
1 Culvert @ Ch. 615
Cement concrete 1:2:4 mix using 20MM HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
1 Culvert @ Ch. 615
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Reinforcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
1 Culvert @ Ch. 615
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced cement concrete works as per the design given including cost steel and binding wire in all floors etc, Complete complying with standard specification. (MS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate). The binding wire shall supplied by the contractor.
1 Culvert @ Ch. 615
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per drawing andd technical specifications.
1 Culvert @ Ch. 615
Providing and fixing tar paper for bearing between Bed Block & Deck slab
1 Culvert @ Ch. 615
Providing weelpholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towars drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
1 Culvert @ Ch. 615
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compcting etc complete complying with standard specifications and as directed by departmental officer
1 Culvert @ Ch. 615
Construction of Pipe Culvert @ Ch 435, 785, 1460 &2355
Earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard roack requiring blasting but inclusive of shoring strutting andd requiring the sides of foundation
2 Cluvert @ Ch. 435 & 785 (2x 14.23)
1 Culvert @ Ch. 1460m (1x14.23)
1Culvert @ Ch. 2355 (1x14.23)
Cement concrete 1:2.5:5 mix using40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
2 Cluvert @ Ch. 435 & 785 (2x 5.20)
1 Culvert @ Ch. 1460m (1x5.20)
1Culvert @ Ch. 2355 (1x5.20)
Cement concrete 1:2.5:5 mix using20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
2 Cluvert @ Ch. 435 & 785 (2x 6.72)
1 Culvert @ Ch. 1460m (1x6.72)
1Culvert @ Ch. 2355 (1x6.72)
Cement concrete 1:2:4 mix using M20 HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed
2 Cluvert @ Ch. 435 & 785 (2x 7.79)
1 Culvert @ Ch. 1460m (1x7.79)
1Culvert @ Ch. 2355 (1x7.79)
Supply of 900mm dia RCC NP3 Class pipe of specification IS 458 - 1988 and suitable Collars of work site (excluding Hositing and fixing of 900mm dia pipes and Collars to proper gradient) including all labour charges all incidential charges, all taxes etc., complete.
2 Cluvert @ Ch. 435 & 785 (2x 7.50)
1 Culvert @ Ch. 1460m (1x7.50)
1Culvert @ Ch. 2355 (1x7.50)
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compcting etc complete complying with standard specifications and as directed by departmental officer
2 Cluvert @ Ch. 435 & 785 (2x 5.93)
1 Culvert @ Ch. 1460m (1x5.93)
1Culvert @ Ch. 2355 (1x5.93)
Construction of Protective work at KM 0/6, 1/4, 1/6, 1/10, 2/6 & 2/8 of Bargur road to Sundappur road
Earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard roack requiring blasting but inclusive of shoring strutting andd requiring the sides of foundation
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specification
Cement concrete 1:2.5:5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed
Cement concrete 1:2:4 mix using M20 HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed (Below sill )
Cement concrete 1:2:4 mix using M20 HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed (Above sill )
Providing weelpholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towars drawing face complete as per drawing
Providing and fixing 20mm thick compressible fiber board in expansion joint complete as per drawing and MORD technical specification
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
RAJU AND CO
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .