Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | -17.50% | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 LAdmitted-Finance | -13.79% | ₹2.0 L | L2 | Admitted-Finance |
| 3 | L3₹2.1 LAdmitted-Finance | -11.00% | ₹2.1 L | L3 | Admitted-Finance |
| 4 | L4₹2.1 LAdmitted-Finance | -10.60% | ₹2.1 L | L4 | Admitted-Finance |
| 5 | L5₹2.3 LAdmitted-Finance | -4.00% | ₹2.3 L | L5 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,740
Closing Date
2 Apr 2026, 4:00 pmClosed
Executive Engineer
PWD RnB Division Bhaderwah
Construction of Boys Toilet at Middle School Bhanan (Under SAMAGRA)
2026_PWDJK_306826_1
FRESH SHORT e-NIT No. 99 of 2025-26 Dt. 27-03-2026
Open Tender
Civil Works
30 days
Bhaderwah
These documents are to be submitted as non-sensitive document from my document area of bidder
3 documents required · 3 mandatory
₹600
Executive Engineer
₹4,740
13 Apr 2026
27 Mar 2026
4 Apr 2026
27 Mar 2026
2 Apr 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge All kinds of soil | 1 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | Cum | 1 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | - | Cum | 1 | - |
| 4Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | |||||
| 5Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | |||||
| 6Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in Cement mortar 1:4 ( 1 cement : 4 coarse sand) | |||||
| 7Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
| 8Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more | |||||
| 9Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | |||||
| 10 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded | - | Kg | 1 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_995986.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid