| 1 | L1₹19.4 LAccepted-Finance | ₹19.4 L | L1 | Accepted-Finance Admitted |
| 2 | L2₹19.6 L+₹23,521.42 (1.21%)Accepted-Finance | ₹19.6 L+₹23,521.42 (1.21%) | L2 | Accepted-Finance Admitted |
Tender Value
₹19.8 L
EMD Value
₹20,000
Closing Date
12 Dec 2022, 3:00 pmClosed
The Block Development Officer V.P Kelamangalam
BDO Office Kelamangalam
Krishnagiri District Kelamangalam Block under AGAMT 2022_2023 Desilting of MI Tank bund Strengthening 1No Pond and Construction of weir 1No and Construction of Drain 1No in Udedurgam Panchayat Package No TN-KLM-001
2022_RDTN_266263_1
1083/2022/E1
Open Tender
Civil Works - Others
Item Rate
180 days
BDO Office Kelamangalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20,000
Yes
BDO Office Kelamangalam
20 Dec 2022
22 Nov 2022
12 Dec 2022
22 Nov 2022
12 Dec 2022
22 Nov 2022
29 Nov 2022
Amount
1.Desilting of MI Tank,Bund Strengthening and Construction of Surplus Weir at Chenrayan Eri H/O Udedurgam -Rs.8.65/- Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Volume of Earth Work in Existing Bund (including Consolidation using Power Roller)
Volume of Earth in New Bund (No Consolidation)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., all complete.
Provision For Name Board Arrangements
Provision For Boundary Stones
Construction of Surplus Weir (Sub Estimate)
Earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock inclusive of shoring and requiring the sides of foundation SS20A
For Foundation 0.00m - 0.30m depth
For Foundation 0.30m - 0.60m depth
For Foundation above 0.60m depth
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
2. Desilting of Pond and Construction of Weir at Kavipuram Kuttai H/O Udedurgam -Rs:-6.216/- Lakhs
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth up to 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Volume of Earth Work in Existing Bund (including Consolidation using Power Roller)
Volume of Earth in New Bund (No Consolidation)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., all complete.
Provision For Name Board Arrangements
Construction of Surplus Weir (Sub Estimate)
Earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock inclusive of shoring and requiring the sides of foundation SS20A
For Foundation 0.00m - 0.30m depth
For Foundation 0.30m - 0.60m depth
For Foundation above 0.60m depth
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
3. Construction of Drain (78m) with Vertical Filter (1 Nos) at Vaniyapuram SC Colony H/O Udedurgam -Rs:-4.956/-Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all cost
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Provisin For Writing Name Board Charges
Construction of Vertical Filter (Sub Estimate)
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
For Foundation 0.00m - 0.30m depth
For Foundation 0.30m - 0.60m depth
For Foundation above 0.60m depth
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Supply and Filling of Rough stone from Approved Qurry including all labour charge
Supply and Filling of 40 mm Metal from Approved Qurry including Cost and Conveyance
Supply and Fixing of RCC 1.00 Dia Ring thickness of 0.05m Including cost and conveyance
RCC Ring 1.00
Cover Slab 1.00
Supply and Fixing of 0.60x0.60m Vertical Filter steel Fabrication including cost and Conveyance
Towards Supply and Filling of 20mm HBG Metal including cost and conveyance of men and materials etc..all complete
Supply and Filling of Char Coal including all labour charges
Supply and filling of 20 mm Brick jelly from approved qurry including all labour charges
supplying and fixing of 110mm dia 6ksc pvc pipe including all cost and conveyance etc., all complete
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and levelling to required profile
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PAPPANAN CONTARCTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .