| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAccepted-AOC | ₹5.3 Cr Quoted ₹5.7 Cr | L1 | Accepted-AOC Financial bid accepted Rs. 53153108.56 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 3 | Rejected-Technical | - | - | Rejected-Technical Reject |
Tender Value
Refer Docs
EMD Value
₹16.4 L
Closing Date
7 Mar 2024, 12:00 pmClosed
S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Renewal work with ordinary repair of Devgarh Lalitpur Tikamgarh road (SH-132) in (Length 31.450 Km.)
2024_CEJNS_909580_1
1549/ 44 C- Jhansi Circle/2023 Date 29.02.2024
Open Tender
Civil Works - Roads
Item Rate
120 days
Lalitpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,250
₹16.4 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
21 Mar 2024
2 Mar 2024
7 Mar 2024
2 Mar 2024
7 Mar 2024
2 Mar 2024
5 Mar 2024
Amount
Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor @ 0.25 kg per sqm on the prepared bituminous surface cleaning with air compressor as per MORTH specification clause No. 503
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
P/L Edge line road marking with hot applied thermoplastic compound 2.5 mm thick including reflectonsing glass beads @ 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35 the finished surface to be level,uniform and free from streaks and holes.(S.I. no.1)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
The routine maintenance of above road work including embankment,patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0%)
The routine maintenance of above road work including embankment,patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (2% Construction Cost)
The routine maintenance of above road work including embankment,patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (3% Construction Cost)
The routine maintenance of above road work including embankment,patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (4% Construction Cost)
The routine maintenance of above road work including embankment,patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (6% Construction Cost)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .