Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.7 LAccepted-Finance CHANDAULI | ₹49.7 L | L1 | Accepted-Finance Not Admitted |
| 2 | L2₹51.1 LRejected-Finance UTTAR PRADESH UP | AGRA | UTTAR PRADESH | 283110 | ₹51.1 L | L2 | Rejected-Finance Not Admitted |
| 3 | L3₹53.4 LRejected-Finance | ₹53.4 L | L3 | Rejected-Finance Admitted |
| 4 | Not Admitted-Fee/PreQual/Technical UTTAR PRADESH UP | HATHRAS | UTTAR PRADESH | 203001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Updated dates
Tender Value
₹62 L
EMD Value
₹5.1 L
Closing Date
5 May 2026, 12:00 pmClosed
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
C/o Gram Gangaura and Chaudhi Nale ke tire nahar par sakari puliya ke asthan par 4x4x4 Mtr RCC Box Culvert in Distt. Jaunpur
2026_CEUVZ_1134842_2
1993/SETender/jnp-gzp circle/25 Date-30-03-2026
Open Tender
Civil Works
180 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹5.1 L
Yes
21 May 2026
9 Apr 2026
5 May 2026
9 Apr 2026
5 May 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Cum | - | - |
| 2 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. As per MORTH Sr.No. 13.10 and 710.1.4.of IRC:78 and 2504.2 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Cum | - | - |
| 3 | Plain cement concrete in open foundation complete and as per drawing technical specifications. (M- 15) As per MORTH Sr.No. 12.8 and Specification No. 1500, 1700 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Cum | - | - |
| 4 | RCC Grade M25 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Cum | - | - |
| 5 | Supplying, fitting and placing HYSD reinforcement complete in sub-structure drawing as per and Technical Specification As per MORTH Sr.No. 12.40 and Specification No. 1600 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Qtl | - | - |
| 6 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing clause 2706 & 2200 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | RM | - | - |
| 7 | Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead : Thickness above 40 mm up to 75 mm As Per DSR No 15.40.2 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Cum | - | - |
| 8 | Providing and laying Pitching on slopes laid including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. As per MORTH Sr.No. 15.4 and Specification No. 2504 Including All material T&P, Labour cess etc But Excluding cost of GST (Part-A Box Culvert) | - | Cum | - | - |
| 9 | Construction of Embankment with Material Obtained from R.O.W. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 & Diversion Including All material T&P, Labour cess etc But Excluding cost of GST (Part B Approach) | - | Cum | - | - |
| 10 | Construction of granular sub-base by providing close graded Material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rovator at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 ller to achieve the desired density, complete as per clause 401 Including All material T&P, Labour cess etc But Excluding cost of GST (Part B Approach) | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
Tendernotice_2.pdf
PDF • 1.30 MB
BOQ_2118635.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid