Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.3 L+₹2,722.78 (2.22%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.3 L+₹7,607.98 (6.22%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.4 L+₹13,252.04 (10.8%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹4,140
Closing Date
23 Jun 2026, 4:00 pmClosed
Er. Mohammad Waseem
Office of the Executive Engineer RnB Ang
Construction of Protection wall of both sides of road Arfat colony Mir Danter.
2026_PWDJK_312601_3
NIT 34 of RnB/Ang/2026-27/2766-75 Dt 16/06/26
Open Tender
Civil Works
Percentage
20 days
Anantnag
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
Executiver Engineer rnB Division Anantnag
₹4,140
27 Jun 2026
16 Jun 2026
24 Jun 2026
16 Jun 2026
23 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of labour for clearence of site, surface dressing complete job | 5 | no | - | - |
| 2 | Felling of trees of the girth measured at height of 1 m above ground level) incl cutting of tree trunk and branches , removing the roots and stacking the serivicable and disposal of unservicable amterial . Beyond the girth of 60 cms incl 120 cms girth | 6 | no | - | - |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator)Over areas ( exceeding 30 cms in depth, 1.5 mtrs in width as well as 10 sq mt on plan) including of disposal of earth lead and lift upto 1.5 m , as directed by EIC all kinds of soil | 12.45 | cum | - | - |
| 4 | P/I dry stone soling (inc. backfilling of drain blocks) duly hand packed & consolidated with hand rammers inc. all carriage complete job | 2.65 | cum | - | - |
| 5 | Providing and laying in position cement concrete of (1:4:8) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 40mm nominial size aggregate include carraige of materials complete job. | 4.15 | cum | - | - |
| 6 | Providing and laying in position cement concrete of (1:2:4) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 20mm nominial size aggregate include carraige of materials complete job | 18.68 | cum | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for foundations | 81.75 | sqm | - | - |
| 8 | Providing and laying of GSB/RBM incl spreading laying and compacting incl carriages complete job | 7.94 | cum | - | - |
stage.html
html • 0.02 MB
finance_1011855.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_1011855.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .