Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | ₹4.5 L | L1 | Accepted-AOC Because for L1 |
| 2 | L2₹5 LRejected-Finance | ₹5 L | L2 | Rejected-Finance HIGHER RATE |
| 3 | L3₹5.8 LRejected-Finance GRAM PADLYA POST GAGORNI TEHSIL JIYAPUR DISTRICT RAJGARH MADHYA PRADESH | ₹5.8 L | L3 | Rejected-Finance HIGHER RATE |
| 4 | L4₹6.6 LRejected-Finance | ₹6.6 L | L4 | Rejected-Finance HIGHER RATE |
| 5 | L5₹6.8 LRejected-Finance | ₹6.8 L | L5 | Rejected-Finance HIGHER RATE |
| Sl No | Description | Qty | Unit | NAVNEET RAM PATEL CONTRACTOR L1 | PACHORI ELECTRICAL L2 | M/s chandar singh parihar L3 | Blue Ladder Infratech Pvt. Ltd. L4 | SHYAMAL CONSTRUCTION LLP L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Electrical Items : | ||||||||
| 1.01 | Back filling of poles with boulders.1 | 84 | Number | - | - | - | - | - |
| 1.02 | 11 KV Arial Bunch Cable 3x95+1x80 sq mm | 0.1 | Kilometer | - | - | - | - | - |
| 1.03 | STAY WIRE 7/3.15 MM.(7/10 SWG) | 372 | Kilogram | - | - | - | - | - |
| 1.04 | Earthing for PCC Pole 4.00 mm-8 SWG G.I wire- 0.8 Kg, per pole | 10.4 | Kilogram | - | - | - | - | - |
| 1.05 | Outdoor heat shrinkable cable jointing kit with lug for 11KV XLPE 3core 120sqmm | 2 | Set | - | - | - | - | - |
| 1.06 | Cable Straight through joint kits suitable for 11 KV XLPE cable 3 core 95 sqmm | 2 | Set | - | - | - | - | - |
| 1.07 | 11 KV Suspension clamps with attachment for AB Cable | 10 | Number | - | - | - | - | - |
| 1.08 | 11 KV Tension clamps (Dead End) with attachment for AB Cable | 10 | Number | - | - | - | - | - |
| 1.09 | 11 KV Strain hardware (T&C type) fittings | 42 | Number | - | - | - | - | - |
Tender Value
₹9.1 L
EMD Value
₹15,000
Closing Date
15 Jul 2019, 2:30 pmClosed
B.S. GINNARE
STC DIVISION RAISEN
Estimate for 11 KV bifurcation interconnection between padariya agr chingwada agr to shift 60 amp load of chingwada agr padariya
2019_MKVVC_37148_1
DGM/STC/WORK/03/01 Dated 05/07/19
Open Tender
Electrical Works
60 days
Estimate for 11 KV bifurcation interconnection bet
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
RAO MPMKVVCL
₹15,000
31 Dec 2025
8 Jul 2019
16 Jul 2019
8 Jul 2019
15 Jul 2019
8 Jul 2019
Electrical Items :
Back filling of poles with boulders.1
11 KV Arial Bunch Cable 3x95+1x80 sq mm
STAY WIRE 7/3.15 MM.(7/10 SWG)
Earthing for PCC Pole 4.00 mm-8 SWG G.I wire- 0.8 Kg, per pole
Outdoor heat shrinkable cable jointing kit with lug for 11KV XLPE 3core 120sqmm
Cable Straight through joint kits suitable for 11 KV XLPE cable 3 core 95 sqmm
11 KV Suspension clamps with attachment for AB Cable
11 KV Tension clamps (Dead End) with attachment for AB Cable
11 KV Strain hardware (T&C type) fittings
Aluminium binding wire and tape
11 KV V cross arm 65X65X6 mm. angle type
11 KV Top clamp 65X65X6 mm. angle type
Stay set complete without Stay wire 16 mm. (Painted)
11 KV Single pole cut point fitting 100x50x6 mm channel
Stay Insulators 90X65mm
Red oxide paint
Aluminium paint
Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay
Concreting of PCC poles @ 0.45 cmt. (Cubic Metric Ton) per pole
Stone Block/Pre cast block for base pedding(450X450X75MM)
GST Charges
L&T Charges
PACHORI ELECTRICAL
M/s chandar singh parihar
Blue Ladder Infratech Pvt. Ltd.
SHYAMAL CONSTRUCTION LLP
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid