| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹1.7 L (1.44%)Rejected-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹1.2 Cr+₹1.7 L (1.44%) | L2 | Rejected-AOC L2 |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
25 Jun 2025, 3:00 pmClosed
The Additional Collector
DRDA, Viluppuram
TNVPM/NAB/25-26/09
2025_RDTN_567634_9
TNVPM/NAB/25-26
Open Tender
Civil Works
Works
180 days
Viluppuram
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.2 L
Yes
24 Jul 2025
13 Jun 2025
25 Jun 2025
13 Jun 2025
25 Jun 2025
17 Jun 2025
Amount
Strengthening the road from Pennagar to Karunguzhi road km 0/0- 2/200 in Vallam Block
Clearing the scrub jungles including all labour charges for all labour charges etc complete.
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br
Picking the existing damaged BT surface to 3 - 5cm deep including all labour charges
Laying US GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision of 15 nos. Rumble strips covered with premix bituminous carpet, 15-20 mm high at centre,250mm wide placed at 1m c/c at approval locations to control speed, marked with white strips of road marking paint.
Construction of 1.50m Span RCC slab culvert @ Ch 5m
Dismantling of Existing Structures like culverts,bridges,retaining wall and other structure comprising of masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m as per Technical Specification Clause 202
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Construction and supply of well gravel from appd quarry including cost and conveyance of all materials to site and all etc.,
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Below sill level
Above sill level
Cement Concrete : 1:3:6 with broken stone using 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Supplying and fabrication of steel including cost and conveyence of steel to site including cost and conveyance and all labour charges etc.complete.
Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Provision for Bitumen pads
Provision and Fixing Tar paper for bearing between bed block & deck slab
Provision for the wheep holes
Construction of 1.50m Span RCC slab culvert @ Ch 820m
Dismantling of Existing Structures like culverts,bridges,retaining wall and other structure comprising of masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m as per Technical Specification Clause 202
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Construction and supply of well gravel from appd quarry including cost and conveyance of all materials to site and all etc.,
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Below sill level
Above sill level
Cement Concrete : 1:3:6 with broken stone using 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Supplying and fabrication of steel including cost and conveyence of steel to site including cost and conveyance and all labour charges etc.complete.
Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Provision for Bitumen pads
Provision and Fixing Tar paper for bearing between bed block & deck slab
Provision for the wheep holes
Construction of 3.00m Span RCC slab culvert @ Ch1908m
Dismantling of Existing Structures like culverts,bridges,retaining wall and other structure comprising of masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m as per Technical Specification Clause 202
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Construction and supply of well gravel from appd quarry including cost and conveyance of all materials to site and all etc.,
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Below sill level
Above sill level
Cement Concrete : 1:3:6 with broken stone using 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Supplying and fabrication of steel including cost and conveyence of steel to site including cost and conveyance and all labour charges etc.complete.
Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Provision for Bitumen pads
Provision and Fixing Tar paper for bearing between bed block & deck slab
Provision for the wheep holes
Construction of 3.00m Span RCC slab culvert @ Ch1957m
Dismantling of Existing Structures like culverts,bridges,retaining wall and other structure comprising of masonry,cement concrete,wood work,steel work,including T&P and scaffolding wherever necessary,sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m as per Technical Specification Clause 202
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Construction and supply of well gravel from appd quarry including cost and conveyance of all materials to site and all etc.,
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Below sill level
Above sill level
Cement Concrete : 1:3:6 with broken stone using 40mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Supplying and fabrication of steel including cost and conveyence of steel to site including cost and conveyance and all labour charges etc.complete.
Reinforced Cement Concrete : 1:1 1/2:3 with broken stone using 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Provision for Bitumen pads
Provision and Fixing Tar paper for bearing between bed block & deck slab
Provision for the wheep holes
Provision for KM Stone
Provision for HM stone
Provision forSign board
Provision for Nameboard Cum Citizen board charges
Provision for photographic charges
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Gopi S (BID ID -1378865)
Bidder Name
Gopi S
Malaiarasan.V
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .