Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.0 L+₹3,008.46 (1.51%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.1 L+₹8,936.01 (4.48%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L3₹2.1 L+₹8,936.01 (4.48%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L4₹2.1 L+₹13,582.73 (6.81%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹8,934
Closing Date
8 Jul 2026, 6:00 pmClosed
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
C/O LINK ROAD FROM GOVT. MIDDLE SCHOOL TANTRAYPORA TO THE HOUSE OF HAJI ISHFAQ AHMAD TANTRAY ,ARIF HUSSAIN TANTRAY AND OTHERS BLOCK SAGAM
2026_RDPR_314183_5
ENIT41of2026-27
Open Tender
Civil Works
Percentage
30 days
ANANTNAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
₹8,934
10 Jul 2026
1 Jul 2026
9 Jul 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site Clearence including removing tree trunks, tree stumps, tree roots, vegetation, and slightly widening the lane by engagement of labours etc ( Subject to actual) | - | no. | - | - |
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : | - | Cum | - | - |
| 0.0 | Supply and laying proper grade of GSB/Nallah muck incld carraige. | - | Cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. 1:3:6 Mix (with out plums) | - | Cum | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work | 0.8 | sqm | - | - |
| 0.0 | Carriage of sand/Agg by MT for avg. 20 Km | - | Cum | 1 | - |
| 0.0 | Supply and laying 225mm dia spun pipes incld carraige | - | NO. | - | - |
| 0.0 | Add cost of Signboard,documentation, photographs | - | NO. | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1017250.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .