Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-AOC RC 62 STREET NO 31 BENGAL AMBUJA CITY CENTRE DURGAPUR RC 62 STREET NO 31 BENGAL AMBUJA 713216 WEST BENGAL INDIA | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713216 | ₹3.1 L | 1 | Accepted-AOC AS PER TCM |
| 2 | 2₹3.1 L+₹121.66 (0.04%)Rejected-Finance AT KHAS KAJORA COLLIERY P O KAJORA GRAM DIST PASCHIM BARDHAMAN WEST BENGAL 713338 | PASCHIM BARDHAMAN | WEST BENGAL | 713338 | ₹3.1 L+₹121.66 (0.04%) | 2 | Rejected-Finance AS PER TCM |
| 3 | 3₹3.1 L+₹1,304.66 (0.42%)Rejected-Finance | ₹3.1 L+₹1,304.66 (0.42%) | 3 | Rejected-Finance AS PER TCM |
| Sl No | Description | Qty | Unit | Santosh Kumar L3 | M/S CHOUDHARY CONSTRUCTIONS L1 | M/S MANOJ KUMAR SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 2.00 | Collection of 04 nos trolleys & welding of two trolleys to make one for loading of main body | 1 | Nos | 4,991.52 ₹4,991.52 Lowest | 5,491 ₹5,491 | 4,991.52 ₹4,991.52 Lowest |
| 3.00 | Dismantling whole SDL after taking out hyd oil, gear oil from tank and gear box respectively and loading manually all parts on trolleys | 1 | Nos | 79,785 ₹79,785 | 61,209.1 ₹61,209.1 Lowest | 78,785 ₹78,785 |
| 4.00 | Lowering all parts after dismantling one side cage & guide rope slackening and again refitting cage after lowering | 1 | Nos | 54,242 ₹54,242 Lowest | 58,567.17 ₹58,567.17 | 54,242 ₹54,242 Lowest |
| 5.00 | Fitting of all parts after making necessary arrangements | 1 | Nos | 99,830.4 ₹99,830.4 Lowest | 1,09,813.44 ₹1,09,813.44 | 99,830.4 ₹99,830.4 Lowest |
| 6.00 | Lowering, placing and fitting of GEB, trailing cable etc | 1 | Nos | 13,310.72 ₹13,310.72 Lowest | 14,642 ₹14,642 | 13,310.72 ₹13,310.72 Lowest |
| 7.00 | Shifting SDL to face | 1 | Nos | 13,310.72 ₹13,310.72 Lowest | 14,642 ₹14,642 | 13,310.72 ₹13,310.72 Lowest |
| 8.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 47,784.66 ₹47,784.66 | 47,585.65 ₹47,585.65 Lowest | 47,604.66 ₹47,604.66 |
Tender Value
₹3.1 L
EMD Value
₹3,900
Closing Date
10 Aug 2026, 5:00 pmClosed
Area Engineer (EnM)
Office of the General Manager, Kajora Area
Dismantling, lowering, transporting and fitting of Eimco make SDL at Central Kajora Colliery
2026_ECL_362697_1
GM/Kaj/AEEnM/etender/26-27/17
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Kajora Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,900
18 Sept 2026
29 Jul 2026
11 Aug 2026
29 Jul 2026
10 Aug 2026
29 Jul 2026
29 Jul 2026 - 6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item Description/ Heading | - | - | - | - |
| 2 | Collection of 04 nos trolleys & welding of two trolleys to make one for loading of main body | 1 | Nos | - | - |
| 3 | Dismantling whole SDL after taking out hyd oil, gear oil from tank and gear box respectively and loading manually all parts on trolleys | 1 | Nos | - | - |
| 4 | Lowering all parts after dismantling one side cage & guide rope slackening and again refitting cage after lowering | 1 | Nos | - | - |
| 5 | Fitting of all parts after making necessary arrangements | 1 | Nos | - | - |
| 6 | Lowering, placing and fitting of GEB, trailing cable etc | 1 | Nos | - | - |
| 7 | Shifting SDL to face | 1 | Nos | - | - |
| 8 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 1.03 MB
ScopeofWork.pdf
Tender Documents • 0.27 MB
BOQ_375599.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .