Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.7 L+₹25,436.06 (3.00%)Admitted-Fee/PreQual/Technical/Finance | +3.00% | ₹8.7 L+₹25,436.06 (3.00%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹8,479
Closing Date
23 Jul 2026, 5:00 pmClosed
Commissioner, Brahmapur Municipal Corporation
BRAHMAPUR, ODISHA, 760002
Development of samashan at ankuli in ward no. 39 and 40 under CMSA of BeMC
2026_ORULB_134208_46
BeMC(BAM)/328/2026-27
Open Tender
Civil Works - Others
Percentage
75 days
BRAHMAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹8,479
Yes
27 Jul 2026
9 Jul 2026
24 Jul 2026
9 Jul 2026
23 Jul 2026
9 Jul 2026
9 Jul 2026 - 18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalling brick or stone masonery in
lime or cement mortar under 3m height
including stacking the useful materials for
reuse and removing the debries away from
work site | - | Cum | 1,401.51 | - |
| 2 | Dismentalling RCC slab beams lintel stair
case etc & stacking the same for reuse and
removing the debries away frim work site | - | Cum | 1,475.61 | - |
| 3 | Earthwork in excavation for foundation in
hard soil with 50mtr initial lead & 1.5mt of
Initial lift including leveling the ground and
filling the earth in the trenches with leveling
the bed etc. complete as per the direction of
EIC | - | Cum | 235.56 | - |
| 4 | Carriage of excavated earth from the
work site to other place by mechanical
means & disposing away from site with in
5 K.M | - | Cum | 160.68 | - |
| 5 | Providing, supplying, filling in foundation
and plinth with sand including watering
and ramming etc. complete. . | - | Cum | 1,535.69 | - |
| 6 | Cement Concrete 1:4:8 using 40mm size
BHG metal of approved quality in
foundation concrete including watering
curing with cost of all material, labour, T&P,
taxes, royalty etc. complete. | - | Cum | 5,509.09 | - |
| 7R.C.C M20 grade with 20mm down graded CBHG chips including hoisting laying & all cost, conveyance royalty and cost towards curing compaction etc. complete to work site as per the specification approve by the deptt. and direction of EIC | |||||
| 7.01 | Column Footing | - | Cum | 5,953.21 | - |
| 7.02 | Plinth Beam | - | Cum | 6,721.17 | - |
| 7.03 | Column & Floor Beam | - | Cum | 16,027.3 | - |
stage.html
html • 0.02 MB
finance_600144.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
DTCN1.pdf
Tender Documents • 1.60 MB
BOQ_600144.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .