| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹51.9 LAccepted-AOC VILLAGE JALALPUR PO BAHADURGARH DISTRICT PATIALA | ₹51.9 L Quoted ₹57.4 L | 1 | Accepted-AOC L1 bidder |
| 2 | 2₹81.8 LRejected-AOC HOUSE NO 40 E PARTAP NAGAR PATIALA PUNJAB | PATIALA | PUNJAB | 140401 | ₹81.8 L | 2 | Rejected-AOC L2 bidder |
| Sl No | Description | Qty | Unit | NARESH KUMAR DUGGAL L1 | R K ENGINEERS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 mtr. | 1 | Cum | 105 ₹105 | 100 ₹100 |
| 1.10 | Depth upto 1.5 to 2.25mtr. | 1 | Cum | 108 ₹108 | 102 ₹102 |
| 1.20 | Depth upto 2.25 to 3.00 mtr. | 1 | Cum | 105 ₹105 | 104 ₹104 |
| 1.40 | Depth upto 3.00 to 4.5 mtr. | 1 | Cum | 107 ₹107 | 108 ₹108 |
| 2.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | 215 ₹215 | 209 ₹209 |
| 3.00 | First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement . | 1 | Cum | 6,700 ₹6,700 | 6,500 ₹6,500 |
| 4.00 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. | 1 | Sqm | 190 ₹190 | 184 ₹184 |
| 5.00 | 10mm thick cement plaster 1:4 on bed and top. | 1 | Sqm | 150 ₹150 | 142 ₹142 |
| 6.00 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | 1 | Cum | 9,700 ₹9,700 | 9,600 ₹9,600 |
| 7.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 1 | Cum | 6,000 ₹6,000 | 5,900 ₹5,900 |
Tender Value
₹70 L
EMD Value
₹1.4 L
Closing Date
25 Jul 2025, 3:00 pmClosed
XEN BML DIV PTA
XEN, BML DIVISION, JAIL ROAD PATIALA
Laying underground pipeline for outlet RD 76790/TR of Gobindgarh Disty excluding supply of pipe
2025_WR_137741_1
62/24-25
Open Tender
Civil Works - Canal
75 days
PATIALA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹1.4 L
Yes
22 Apr 2026
29 Mar 2025
26 Jul 2025
29 Mar 2025
25 Jul 2025
29 Mar 2025
Amount
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 mtr.
Depth upto 1.5 to 2.25mtr.
Depth upto 2.25 to 3.00 mtr.
Depth upto 3.00 to 4.5 mtr.
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement .
10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding.
10mm thick cement plaster 1:4 on bed and top.
Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement
Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle
Cement concrete 1:4:8 with brick ballast 40mm gauge
Lowering, jointing of RCC NP-2 plain end pipes upto 200 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
Lowering, jointing of RCC NP-2 plain end pipes upto 250 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
Lowering, jointing of RCC NP-2 plain end pipes upto 300 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
Lowering, jointing of RCC NP-2 plain end pipes 350 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
Lowering, jointing of RCC NP-2 plain end pipes 400 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
Lowering, jointing of RCC NP-2 plain end pipes 450 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
Lowering, jointing of RCC NP-2 plain end pipes 500 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
Lowering, jointing of RCC NP-2 plain end pipes 600 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
Jointing and cutting of RCC NP-2 plain end pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 ( @2.50 metre / No)
Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank
Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in Haudis complete with cement concrete 1:2:4
Providing and fixing of Alfa Valve fitted on riser pipe to act as Nakka (D regulators) Dia 200 mm
Dia 250 mm
Dia 300 mm
Dia 350 mm
Dia 400 mm
Dia 450 mm
Dia 500 mm
Dia 600 mm
Centreing &shuttering for Concerte faces
Providing & Fixing of Steel Shutter Gate Assembly in Main Pipeline complete in all respect
Reinforced cement concrete M-15 grade 200 meter stone of standard design as per IRC 26-1967 fixing in position including painting and printing etc. complete as per technical clause 804 of MORT&H specifications
Advance Direction sign board 1200x1800 mm rectangular as per IRC 67- 2012 with high intensity Microprismatic grade retro reflective Sheeting as per ASTM D 4956 – 09 and as per IRC 67 – 2012.
Dismantling of Brick work in Cement
Dismantling of Flexible Pavements (By Mechanical Means) Dismantling of flexible pavements thickness above 50mm by mechanical means and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately as per technical clause 202 of MORT&H specifications
(Loading and unloading) Cast iron/RCC pipes:- upto 300mm dia bore
Exceeding 300 mm but up to 450 mm dia bore
Exceeding 450 mm but up to 600 mm dia bore
(Carriage) RCC pipes above 450 mm i/d (truck load 5.0 tonnes) 0.50 km to 1.0 km
(Carriage) RCC pipes 350mm to 450 mm i/d (truck load 5.0 tonnes) 0.50 km to 1.0 km
Excavation by mechanical means (JCB or Hydraulic excavator) in trenches for pipelines with straight or open cutting in streets or open area including dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, including the cost of diversion for traffic crossing over trenches for access to the houses, watching, fencing etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect.
R K ENGINEERS (BID ID -662936)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_278360.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid