Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | -31.65% | ₹1.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | -25.99% | ₹1.2 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | -25.91% | ₹1.2 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.3 LAdmitted-Fee/PreQual/Technical/Finance 11 ANUPAM VIHAR ENGINEERS ENCLAVE GMS ROAD DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | -25.00% | ₹1.3 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.3 LAdmitted-Fee/PreQual/Technical/Finance | -20.00% | ₹1.3 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.7 L
EMD Value
₹3,340
Closing Date
25 Aug 2026, 6:00 pmClosed
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_319296_3
e-NIT No. 92 REW UDHAMPUR of 2026-27 Dated 03-08-2026
Open Tender
Civil Works
Percentage
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹3,340
28 Aug 2026
5 Aug 2026
26 Aug 2026
5 Aug 2026
25 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add cost of sign board | 1 | No. | 1,500 | ₹1,500 |
| 2 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 6 | cum | 479.3 | ₹2,875.8 |
| 3 | P/Laying position Cement Concrete specigied grade including curing but excluding the cost of centering and shuttering all work upto plinth level with 1:5:10 | 0.97 | Cum | 4,826.5 | ₹4,681.71 |
| 4 | P/Laying position Cement Concrete specigied grade including curing but excluding the cost of centering and shuttering all work upto plinth level with 1:3:6 using 20mm aggregate size | 10.5 | Cum | 5,733 | ₹60,196.5 |
| 5 | Centering shuttering including struting propping and removal of form work for foundation footing base of column at wall | 92 | sqm | 286.35 | ₹26,344.2 |
| 6 | P/fixing pole for horizental and vertical fixing of GI sheet | 260 | kg | 123 | ₹31,980 |
| 7 | P/fixing of GI sheet 50 mm | 37 | sqm | 720 | ₹26,640 |
| 8 | Carriage of sand | 5.48 | cum | 1,095 | ₹6,000.6 |
| 9 | Carriage of aggregate | 10.97 | Cum | 409.94 | ₹4,497.04 |
| 10 | Carriage of stone | 2.4 | No. | 1,007.08 | ₹2,416.99 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_1056932.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].