| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.0 LAdmitted-Finance | ₹22.0 L | L1 | Admitted-Finance |
| 2 | L2₹23.9 LAdmitted-Finance | ₹23.9 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ENVISION 5R WASTE MANAGEMENT & EQUIPMENT PRIVATE LIMITED L1 | HUNAR TRIBE L2 |
|---|---|---|---|---|---|
| 1.01 | Hocky Player:Fabrication, supply, transport, installation and finishing of an 8-feet height Scrap-Metal Hockey Player Sculpture including complete civil foundation works, comprising procurement of scrap metal and ball bearings with cutting, sorting and preparation; fabrication, shaping, welding and assembly by skilled welders and helpers; artist concept, design detailing and on-site supervision; all finishing works including surface preparation, epoxy/zinc anti-rust primer and matte polyurethane topcoat; consumables, workshop overheads and small tools. Civil works shall include earthwork excavation in normal soil up to 1.5 m depth, RCC M-20 footing (1.35 cum), centering and shuttering (5.85 sqm), reinforcement steel Fe-500 including cutting, bending, tying and placing (108 kg), anchor plate/base plate/anchor bolts with required fabrication, grouting, PCC bedding, minor finishing around base, curing, and all associated labour. Installation works include site erection, alignment, positioning using chain pulley, winches and scaffolding (no crane included), along with local transport, loading–unloading, site consumables and contingency. The item is inclusive of all labour, materials, T&P, consumables, supervision, safety measures, taxes, finishing and complete installation of the sculpture on RCC foundation as directed by the Engineer-in-Charge, ensuring structural stability, proper alignment, aesthetic finishing and long-term durability. Complete job including all components as per specification. | 1 | Each | 7,00,000 ₹7 L | 7,54,840 ₹7.5 L |
| 2.01 | Footbal Player :Fabrication, supply, transport, installation and finishing of an 8-feet height Scrap-Metal Football Player Sculpture including complete civil foundation works, comprising procurement of scrap metal and ball bearings with cutting, sorting and preparation; fabrication, shaping, welding and assembly by skilled welders and helpers; artist concept, design detailing and on-site supervision; all finishing works including surface preparation, epoxy/zinc anti-rust primer and matte polyurethane topcoat; consumables, workshop overheads and small tools. Civil works shall include earthwork excavation in normal soil up to 1.5 m depth, RCC M-20 footing (1.35 cum), centering and shuttering (5.85 sqm), reinforcement steel Fe-500 including cutting, bending, tying and placing (108 kg), anchor plate/base plate/anchor bolts with required fabrication, grouting, PCC bedding, minor finishing around base, curing, and all associated labour. Installation works include site erection, alignment, positioning using chain pulley, winches and scaffolding (no crane included), along with local transport, loading–unloading, site consumables and contingency. The item is inclusive of all labour, materials, T&P, consumables, supervision, safety measures, taxes, finishing and complete installation of the sculpture on RCC foundation as directed by the Engineer-in-Charge, ensuring structural stability, proper alignment, aesthetic finishing and long-term durability. Complete job including all components as per specification. | 1 | Each | 7,00,000 ₹7 L | 7,15,890 ₹7.2 L |
| 3.01 | Map of India:Fabrication, supply, transport, installation and finishing of an 8-feet height Scrap-Metal Map of India Sculpture including complete civil foundation works, comprising procurement of scrap metal and ball bearings with cutting, sorting and preparation; fabrication, shaping, welding and assembly of the India map outline, internal structural support frame and artistic detailing by skilled welders and helpers; artist concept, design refinement and on-site supervision for accurate geographical representation; all finishing works including surface preparation, epoxy/zinc anti-rust primer and matte polyurethane topcoat suitable for outdoor installation; consumables, workshop overheads and small tools. Civil works shall include earthwork excavation in normal soil up to 1.5 m depth, RCC M-20 footing (1.35 cum), centering and shuttering (5.85 sqm), reinforcement steel Fe-500 including cutting, bending, tying and placing (108 kg), anchor plate/base plate/anchor bolts with required fabrication, grouting, PCC bedding, minor finishing around base, curing and all associated labour. Installation works include site erection, alignment and fixing using chain pulley, winches and scaffolding (no crane included), along with local transport, loading–unloading, site consumables and contingency. The item is inclusive of all labour, materials, T&P, consumables, supervision, safety measures, taxes, finishing and complete installation of the 8-feet Map of India Sculpture on RCC foundation as directed by the Engineer-in-Charge, ensuring structural stability, precise alignment, aesthetic finishing and long-term durability. Complete job including all components as per specification. | 1 | Each | 3,10,000 ₹3.1 L | 3,48,395 ₹3.5 L |
| 4.01 | Sofa and Table Set Item Description:
Fabrication, supply, transport, installation and finishing of a Sofa Set made using waste tyres consisting of seating units of 2–2.5 feet height with width based on three stacked tyres, and matching side units of 2–2.5 feet height with 1–1.5 feet width formed by three tyres arranged in a sandwich configuration, including procurement and transport of 6–10 good-condition waste tyres; complete cleaning, de-greasing, cutting, trimming and preparation of tyres; fabrication of internal MS steel frame including table legs and reinforcement, with shop welding and structural fixing; supply and fixing of plywood seating base, internal support panels and backing for table top; providing and fixing foam cushioning and upholstery fabric including foam seat pads, back cushions, fabric or synthetic leather; upholstery labour including cutting, stitching, padding and finishing; welding and assembly at site including alignment, fastening and final structural joining; surface treatment including rust-arrest primer for steel frames, paint for tyre outer surfaces and decorative finishing; supply of all hardware and fasteners including bolts, nuts, anchor plates, metal straps and adhesives; artist/design finishing fee including aesthetic detailing and minor customisation; packaging and transport of finished sofa and table modules to the installation site; and all consumables such as welding rods, grinding discs, adhesives, epoxies and cleaning chemicals. The item also includes contingency for minor variations and contractor profit margin. The complete rate shall include all labour, materials, tools and plants, consumables, equipment, transport, finishing, taxes (pre-GST), and installation of the tyre-based sofa set as directed by the Engineer-in-Charge. Complete job including all components as per specification. | 1 | Each | 32,000 ₹32,000 | 45,240 ₹45,240 |
| 5.01 | Colour Palette Artwork - Item Description
Fabrication, supply, transport, installation and finishing of a Colour Palette Artwork of 2 feet height and 7–8 feet width, including excavation, dressing and disposal for a shallow pit as per SOR 2023 methodology; construction of an RCC M-20 pedestal with complete formwork, centering and reinforcement (approx. 0.35 m³); fabrication of the structural MS skeleton with complete shop welding for the 7.5-foot wide framework; procurement, sorting and cleaning of scrap metal; fabrication of a 2.5-foot paint-brush element using MS sections and scrap components; full surface preparation including cleaning, rust removal, primer and two-coat exterior finishing paint; on-site erection, alignment, anchoring and final welding with all necessary tools and handling equipment; supply and installation of anchor plates, bolts and embedded fixings; artist/design finishing including concept detailing, colour selection and aesthetic refinements; and all consumables including welding rods, grinding discs, cutting wheels, adhesives and cleaning chemicals. The item also includes contingency for minor site adjustments and contractor profit margin. The rate shall be inclusive of all labour, materials, tools and plants, consumables, transport, loading–unloading, finishing, safety measures and all applicable taxes including GST (18%), ensuring complete installation of the Colour Palette Artwork on its RCC pedestal as directed by the Engineer-in-Charge. Complete job including all components as per specification. | 1 | Each | 70,000 ₹70,000 | 72,595 ₹72,595 |
| 6.01 | Bouquet-Shaped Light Artwork
Item Description:
Fabrication, supply, transport, installation and finishing of a bouquet-shaped Light Artwork of 9–10 feet height with proportionate width, including excavation, dressing and disposal for a 1.5 m × 1.5 m × 0.8 m foundation pit as per SOR 2023 methodology; construction of an RCC M-20 pedestal with PCC bedding, complete formwork, centering and reinforcement (approx. 1.0 m³); fabrication of a heavy structural MS frame (~250 kg) shaped into a curved bouquet form with complete shop welding, bending and forming; procurement, sorting and cleaning of approx. 400 kg scrap metal for decorative elements; detailed assembly, shaping and finishing of bouquet petals, stems and ornamental components with cold forming and secondary welding; full surface preparation including grinding, rust removal, metal primer and two-coat PU enamel exterior finishing; supply and installation of anchor plates, anchor bolts and complete grouting for securing the structure; on-site erection, cranage/manual lifting, alignment and final stitch welding; supply and installation of a complete outdoor IP-65 rated lighting system including LED fixtures, wiring, cables, drivers, conduits and junction box; complete electrical installation, testing and commissioning; artist/designer finishing, aesthetic detailing and colour composition; and all consumables such as welding rods, grinding discs, cutting wheels, fasteners, sealants and cleaning materials. The item also includes contingency for site adjustments and contractor’s margin. The rate shall be inclusive of all labour, materials, tools and plants, consumables, transport, loading–unloading, finishing, safety measures and all applicable taxes including GST (18%), ensuring complete installation and illumination of the bouquet-shaped Light Artwork as directed by the Engineer-in-Charge. Complete job including all components as per specification | 1 | Each | 3,30,000 ₹3.3 L | 3,25,000 ₹3.3 L |
| 7.01 | Scrap Metal Cube Artwork
Item Description:
Fabrication, supply, transport, installation and finishing of a Scrap-Metal Cube Artwork of 5 feet height × 5 feet width, including excavation, dressing and disposal for a shallow 1.0 m × 1.0 m × 0.5 m pit as per SOR 2023 methodology; construction of an RCC M-20 pedestal of approx. 0.25 m³ with complete formwork, centering, reinforcement and anchor cage; procurement, sorting and cleaning of approx. 250 kg scrap metal bolts and nuts; fabrication and shop welding of the structural cube frame (5 ft × 5 ft) including assembly of bolts and nuts into a uniform cube grid; surface preparation including grinding, rust removal, primer application and two-coat PU/enamel exterior finishing; on-site erection, alignment, anchoring and final stitch welding with complete grouting; artist/designer supervision including aesthetic detailing and finishing touches; and all consumables such as welding rods, grinding discs, fasteners and cleaning materials. The item also includes contingency for minor adjustments and contractor’s margin. The rate shall be inclusive of all labour, materials, tools and plants, consumables, transport, loading–unloading, finishing, safety measures and all applicable taxes including GST (18%), ensuring complete installation of the Scrap-Metal Cube Artwork on its RCC pedestal as directed by the Engineer-in-Charge. Complete job including all components as per specification. | 1 | Each | 35,000 ₹35,000 | 41,390 ₹41,390 |
| 8.01 | Waste-Tyre Artistic Sculpture
Item Description:
Fabrication, supply, transport, installation and finishing of a Waste-Tyre Artistic Sculpture of 2–2.5 feet height and approx. 2 feet width, made using five waste tyres arranged and shaped as per design, including procurement of used tyres; primary structure cutting, shaping and profiling of tyre components such as mouth, hands, feet and body segments; supply and fixing of an internal MS support structure using light MS rods (8–10 kg) including bending, cutting and welding; fabrication and assembly involving joining of tyres, welding/bolting of metal supports and structural fixing; complete surface preparation including cleaning, grinding, sanding, dust removal and priming; provision of rubber-compatible primer and two-coat enamel painting with detailing as required; supply and fixing of decorative accessories including eyes, eyelashes, lips, hand/feet cutouts and eco-friendly coloured elements; on-site installation including fixing to the ground with anchor rods, alignment and minor grouting; artist/designer input including concept development, colour selection and aesthetic finishing; supply of all required consumables such as welding rods, brushes, adhesives, thinner and cleaning materials; transportation of tyres and fabricated elements to site; and contingency for minor variations. The rate shall be inclusive of all labour, materials, tools and plants, consumables, transport, loading–unloading, finishing, safety measures, and all applicable taxes including GST (18%), ensuring complete installation of the Waste-Tyre Artistic Sculpture as directed by the Engineer-in-Charge. Complete job including all components as per specification. | 5 | Each | 5,000 ₹25,000 | 16,500 ₹82,500 |
Tender Value
₹26.5 L
EMD Value
₹53,000
Closing Date
23 Feb 2026, 6:00 pmClosed
COMMISSIONER
MUNICIPAL COUNCIL SALUMBER
Waste to wealth Park Development Municipal Council Salumber
2026_DLB_538280_9
ENIT 07
Open Tender
Civil Works
90 days
SALUMBER
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
MUNICIPAL COUNCIL SALUMBER
₹53,000
Yes
11 Mar 2026
13 Feb 2026
24 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
Hocky Player:Fabrication, supply, transport, installation and finishing of an 8-feet height Scrap-Metal Hockey Player Sculpture including complete civil foundation works, comprising procurement of scrap metal and ball bearings with cutting, sorting and preparation; fabrication, shaping, welding and assembly by skilled welders and helpers; artist concept, design detailing and on-site supervision; all finishing works including surface preparation, epoxy/zinc anti-rust primer and matte polyurethane topcoat; consumables, workshop overheads and small tools. Civil works shall include earthwork excavation in normal soil up to 1.5 m depth, RCC M-20 footing (1.35 cum), centering and shuttering (5.85 sqm), reinforcement steel Fe-500 including cutting, bending, tying and placing (108 kg), anchor plate/base plate/anchor bolts with required fabrication, grouting, PCC bedding, minor finishing around base, curing, and all associated labour. Installation works include site erection, alignment, positioning using chain pulley, winches and scaffolding (no crane included), along with local transport, loading–unloading, site consumables and contingency. The item is inclusive of all labour, materials, T&P, consumables, supervision, safety measures, taxes, finishing and complete installation of the sculpture on RCC foundation as directed by the Engineer-in-Charge, ensuring structural stability, proper alignment, aesthetic finishing and long-term durability. Complete job including all components as per specification.
Footbal Player :Fabrication, supply, transport, installation and finishing of an 8-feet height Scrap-Metal Football Player Sculpture including complete civil foundation works, comprising procurement of scrap metal and ball bearings with cutting, sorting and preparation; fabrication, shaping, welding and assembly by skilled welders and helpers; artist concept, design detailing and on-site supervision; all finishing works including surface preparation, epoxy/zinc anti-rust primer and matte polyurethane topcoat; consumables, workshop overheads and small tools. Civil works shall include earthwork excavation in normal soil up to 1.5 m depth, RCC M-20 footing (1.35 cum), centering and shuttering (5.85 sqm), reinforcement steel Fe-500 including cutting, bending, tying and placing (108 kg), anchor plate/base plate/anchor bolts with required fabrication, grouting, PCC bedding, minor finishing around base, curing, and all associated labour. Installation works include site erection, alignment, positioning using chain pulley, winches and scaffolding (no crane included), along with local transport, loading–unloading, site consumables and contingency. The item is inclusive of all labour, materials, T&P, consumables, supervision, safety measures, taxes, finishing and complete installation of the sculpture on RCC foundation as directed by the Engineer-in-Charge, ensuring structural stability, proper alignment, aesthetic finishing and long-term durability. Complete job including all components as per specification.
Map of India:Fabrication, supply, transport, installation and finishing of an 8-feet height Scrap-Metal Map of India Sculpture including complete civil foundation works, comprising procurement of scrap metal and ball bearings with cutting, sorting and preparation; fabrication, shaping, welding and assembly of the India map outline, internal structural support frame and artistic detailing by skilled welders and helpers; artist concept, design refinement and on-site supervision for accurate geographical representation; all finishing works including surface preparation, epoxy/zinc anti-rust primer and matte polyurethane topcoat suitable for outdoor installation; consumables, workshop overheads and small tools. Civil works shall include earthwork excavation in normal soil up to 1.5 m depth, RCC M-20 footing (1.35 cum), centering and shuttering (5.85 sqm), reinforcement steel Fe-500 including cutting, bending, tying and placing (108 kg), anchor plate/base plate/anchor bolts with required fabrication, grouting, PCC bedding, minor finishing around base, curing and all associated labour. Installation works include site erection, alignment and fixing using chain pulley, winches and scaffolding (no crane included), along with local transport, loading–unloading, site consumables and contingency. The item is inclusive of all labour, materials, T&P, consumables, supervision, safety measures, taxes, finishing and complete installation of the 8-feet Map of India Sculpture on RCC foundation as directed by the Engineer-in-Charge, ensuring structural stability, precise alignment, aesthetic finishing and long-term durability. Complete job including all components as per specification.
Sofa and Table Set Item Description: Fabrication, supply, transport, installation and finishing of a Sofa Set made using waste tyres consisting of seating units of 2–2.5 feet height with width based on three stacked tyres, and matching side units of 2–2.5 feet height with 1–1.5 feet width formed by three tyres arranged in a sandwich configuration, including procurement and transport of 6–10 good-condition waste tyres; complete cleaning, de-greasing, cutting, trimming and preparation of tyres; fabrication of internal MS steel frame including table legs and reinforcement, with shop welding and structural fixing; supply and fixing of plywood seating base, internal support panels and backing for table top; providing and fixing foam cushioning and upholstery fabric including foam seat pads, back cushions, fabric or synthetic leather; upholstery labour including cutting, stitching, padding and finishing; welding and assembly at site including alignment, fastening and final structural joining; surface treatment including rust-arrest primer for steel frames, paint for tyre outer surfaces and decorative finishing; supply of all hardware and fasteners including bolts, nuts, anchor plates, metal straps and adhesives; artist/design finishing fee including aesthetic detailing and minor customisation; packaging and transport of finished sofa and table modules to the installation site; and all consumables such as welding rods, grinding discs, adhesives, epoxies and cleaning chemicals. The item also includes contingency for minor variations and contractor profit margin. The complete rate shall include all labour, materials, tools and plants, consumables, equipment, transport, finishing, taxes (pre-GST), and installation of the tyre-based sofa set as directed by the Engineer-in-Charge. Complete job including all components as per specification.
Bouquet-Shaped Light Artwork Item Description: Fabrication, supply, transport, installation and finishing of a bouquet-shaped Light Artwork of 9–10 feet height with proportionate width, including excavation, dressing and disposal for a 1.5 m × 1.5 m × 0.8 m foundation pit as per SOR 2023 methodology; construction of an RCC M-20 pedestal with PCC bedding, complete formwork, centering and reinforcement (approx. 1.0 m³); fabrication of a heavy structural MS frame (~250 kg) shaped into a curved bouquet form with complete shop welding, bending and forming; procurement, sorting and cleaning of approx. 400 kg scrap metal for decorative elements; detailed assembly, shaping and finishing of bouquet petals, stems and ornamental components with cold forming and secondary welding; full surface preparation including grinding, rust removal, metal primer and two-coat PU enamel exterior finishing; supply and installation of anchor plates, anchor bolts and complete grouting for securing the structure; on-site erection, cranage/manual lifting, alignment and final stitch welding; supply and installation of a complete outdoor IP-65 rated lighting system including LED fixtures, wiring, cables, drivers, conduits and junction box; complete electrical installation, testing and commissioning; artist/designer finishing, aesthetic detailing and colour composition; and all consumables such as welding rods, grinding discs, cutting wheels, fasteners, sealants and cleaning materials. The item also includes contingency for site adjustments and contractor’s margin. The rate shall be inclusive of all labour, materials, tools and plants, consumables, transport, loading–unloading, finishing, safety measures and all applicable taxes including GST (18%), ensuring complete installation and illumination of the bouquet-shaped Light Artwork as directed by the Engineer-in-Charge. Complete job including all components as per specification
Scrap Metal Cube Artwork Item Description: Fabrication, supply, transport, installation and finishing of a Scrap-Metal Cube Artwork of 5 feet height × 5 feet width, including excavation, dressing and disposal for a shallow 1.0 m × 1.0 m × 0.5 m pit as per SOR 2023 methodology; construction of an RCC M-20 pedestal of approx. 0.25 m³ with complete formwork, centering, reinforcement and anchor cage; procurement, sorting and cleaning of approx. 250 kg scrap metal bolts and nuts; fabrication and shop welding of the structural cube frame (5 ft × 5 ft) including assembly of bolts and nuts into a uniform cube grid; surface preparation including grinding, rust removal, primer application and two-coat PU/enamel exterior finishing; on-site erection, alignment, anchoring and final stitch welding with complete grouting; artist/designer supervision including aesthetic detailing and finishing touches; and all consumables such as welding rods, grinding discs, fasteners and cleaning materials. The item also includes contingency for minor adjustments and contractor’s margin. The rate shall be inclusive of all labour, materials, tools and plants, consumables, transport, loading–unloading, finishing, safety measures and all applicable taxes including GST (18%), ensuring complete installation of the Scrap-Metal Cube Artwork on its RCC pedestal as directed by the Engineer-in-Charge. Complete job including all components as per specification.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
ANNEXURE.pdf
Tender Documents • 2.06 MB
BOQ_959575.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid