Loading…
Loading…
Tender Value
₹6.3 Cr
EMD Value
₹12.6 L
Closing Date
31 Aug 2026, 11:00 am3d left
Chief Engineer
Office of the Chief Engineer Water Resources Zone Banswara
Construction of Babra ka naka Anicut Tehsil-Dovda Dist.-Dungarpur
2026_WRDAS_582839_1
NIT CE 02/2026-27
Open Tender
Civil Works
Percentage
547 days
Dovda Dungarpur
As per NIT, Tender Documents Technical and Financial Bid
4 documents required · 4 mandatory
₹10,000
E Grass Challan
₹12.6 L
Yes
Banswara
6 Aug 2026
6 Aug 2026
1 Sept 2026
6 Aug 2026
31 Aug 2026
6 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer - in - charge. Cost of wood has been deducted from rate sand thus will be roperty of contractor after cutting. (a) Ordinary | 22,500 | Sqm | 1.45 | ₹32,625 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavatedearthwithin initial leadof 50mand lift up to1.5mincluding dressing of excavated area and dewatering wherever requiredcomplete in all respect (b) Hard / dense soil | 1,803 | Cum | 79 | ₹1,42,437 |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to1.5m including dressing of excavated area and dewatering wherever requiredcomplete in all respect (c) Hard soil mixed with Kankar / boulders, Morrum | 3,606 | Cum | 99 | ₹3,56,994 |
| 4 | Excavation in cluding loading unloading disposal and dressing of excavated rock with in initial lead of 50 m and lift up to 1.5 min dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. (a) Soft / Disintegrated rock | 3,238 | Cum | 134 | ₹4,33,892 |
| 5 | Excavation in cluding loading unloading disposal and dressing of excavated rock with in initial lead of 50 m and lift up to 1.5 min dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. (b) Hard rock not requiring blasting | 2,434 | Cum | 201 | ₹4,89,234 |
| 6 | Excavation in cluding loading unloading disposal and dressing of excavated rock with in initial lead of 50 m and lift up to 1.5 min dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. (c) Phylite & other hard rock requiring nominal blasting | 3,245 | Cum | 291 | ₹9,44,295 |
| 7 | Excavation including loading unloading disposal and dressing of excavated rockwith ininitial lead of 50m and lift upto1.5m in dry or moist including dressing of excavated area,de-watering wherever required complete in all respect. (d) Hard rock (dry or moist ) requiring blasting ( where hardness of rock is more than 2 ) in cluding disposal of excavated material in the designated spoil bank/embankment, dressing of excavated material and dewatering with all leads & lifts of excavation and disposal. The contractor is free touse the usable excavated stone else where for which any transition expenditure & royalties, axetcif required to be paid the nit will be liability of contractor as the cost of usable stone has already been deducted from the rate. | 1,893 | Cum | 362 | ₹6,85,266 |
| 8 | Add extra over item No. 4 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. (a) Soft / Disintegrated rock | 368 | Cum | 167.5 | ₹61,640 |
| 9 | Add extra over item No. 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. (b)Hard rock not requiring blasting | 270 | Cum | 251.25 | ₹67,837.5 |
| 10 | Add extra over item No. 6 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to beconsidered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.(c)Phylite & other hard rock requiring nominal blasting | 361 | Cum | 363.75 | ₹1,31,313.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
Technical_bid.pdf
Tender Documents • 1.28 MB
Financial_Bid.pdf
Other Document • 1.69 MB
BOQ_1035442.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].