| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | ₹9.5 L | L1 | Accepted-AOC L1 Awarded |
| 2 | L2₹9.6 L+₹10,828.35 (1.14%)Rejected-Finance | ₹9.6 L+₹10,828.35 (1.14%) | L2 | Rejected-Finance L2 Rejected |
Tender Value
₹9.2 L
EMD Value
₹18,353
Closing Date
9 May 2026, 4:00 pmClosed
Assistant Director of Agriculture (Hort)
Assistant Director of Agriculture (Hort)
Construction of Bandhara No.2 in Tiloi Village of QuepemTaluka in Survey No.35/5
2026_DAG_29068_1
33HotCSSPMKSYWDC62627DAgre53
Open Tender
Civil Works
Percentage
Assistant Director of Agriculture (Hort), Director
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹18,353
23 Jul 2026
4 May 2026
11 May 2026
5 May 2026
9 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 68 | sq.m | 4.98 | ₹338.64 |
| 2 | Earthwork in excavation in foundation pipeline trenches, drain in saturated soil upto a depth of 0.60 m lift upto 1.50 m including shoring, strutting and pumping/bailing out water stacking the excavated
soil not more than 5 m. clear from the edge the excavation and returning the stacked soil in 0.15 m layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming,watering and disposing of all surplus excavated soil within a lead upto 20m. | 182.79 | Cu.m | 822 | ₹1,50,253.38 |
| 3 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | - | Cu.m | 2,211 | - |
| 4 | Providing & laying cement concrete 1:2:4 (1
cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:All works upto plinth level | 7.45 | Cu.m | 6,810 | ₹50,734.5 |
| 5 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement
(1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) a).All works upto plinth level | 11.81 | Cu.m | 7,178 | ₹84,772.18 |
| 5.01 | In walls( any thickness),including attached pilasters,buttresses,plinth and string courses, fillets, columns, pillars ,piers,abutments, post and structs etc. upto floor five level | 16.33 | Cu.m | 8,034 | ₹1,31,195.22 |
| 6 | Providing High yield strength steel reinforcement bar (HYSD)/TMT steel reinforcement bar from secondary producers (Confirming to IS 1786 of
1986) for RCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 2,250.94 | kg | 87 | ₹1,95,831.78 |
| 7 | Centering and shuttering including struttings, propping etc. and removal of formwork for : a).Foundation,footing,bases for columns and mass concrete. | 101.43 | sq.m | 407 | ₹41,282.01 |
| 8 | M.S.Plates (SAIL, TATA. VIZAG,JSW Steel Ltd. ) | 0.6 | Tonne | 72,000 | ₹43,200 |
| 9 | M.S Hooks | 6 | Each | 17 | ₹102 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.61 MB
BOQ_29499.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .