Tender Value
₹2.0 L
EMD Value
₹1,990
Closing Date
4 Jun 2020, 2:00 pmClosed
SE/SEDC/SVGA
O/oSE/SEDC/SVGA
Providing new water supply pipe line arrangements to the existing control room and section office from municipal main line at 110 KV SS Illayangudi
2020_EB_164387_1
W001/20-21
Open Tender
Civil Works
Works
180 days
illayangudi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,990
Yes
12 Jun 2020
21 May 2020
5 Jun 2020
21 May 2020
4 Jun 2020
21 May 2020
Amount
Civil Works
Earth work excavating and depositing on bank with initial lead of 10 m and initial lift of 2m in hard Stiff clay, Stiff black cotton , for pipe line trenches & sump including cost of all materials labour, lead, lift, etc,complete.
Supplying and filling with river sand for sump foundation including cost of sand, all labour, lead,lift, consolidation etc. complete.
Providing and laying PVC high density pipe including cost of all materials, labour, etc., complete. 50 mm dia PVC pipe
Providing and laying PVC high density pipe including cost of all materials, labour, etc., complete. 40 mm dia PVC pipe
Providing and laying PVC high density pipe including cost of all materials, labour, etc., complete. 32 mm dia PVC pipe
Providing and laying PVC high density pipe including cost of all materials, labour, etc., complete. 25 mm dia PVC pipe
PCC 1:4:8, using 40mm HBG metal foundation including cost of cement, all materials, labour, lead, lift, etc. complete.
PCC 1:2:4, using 20mm HBG metal foundation including cost of cement, all materials, labour, lead, lift, etc. complete.
Brickwork in CM 1:3 mix using II class chamber brick of size 9"x 4 3/8" x 2 3/4" including cost of labour materials, curing, lead, lift, etc., complete.
Plastering with CM. 1:3 mix 12mm thick with water proofing compound including cost of materials, labour, lead, lift, watering, curing, etc., complete.
RCC 1:2:4 using 12-20mm graded hard machine broken granite stone with steel mould, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For precast cover slab concrete.
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete.
Supplying and erection of single phase 1 HP self priming motor of approved make / ISI make including handling charges, lead, lift, cost of pump motor clamp foot value and accessories etc. complete including plat form.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .