| 1 | Admitted-Finance POST KAIRANA VILLAGE AIRTY TEHSIL KAIRANA SHAMLI MUZAFFARNAGAR UTTAR PRADESH 247774 | SHAMLI | UTTAR PRADESH | 247774 | Admitted-Finance |
| 2 | Admitted-Finance 23 B NEW MANDI NEW MANDI MUZAFFARNAGAR MUZAFFARNAGAR UTTAR PRADESH 251001 INDIA | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | Admitted-Finance |
| 3 | Admitted-Finance 350 KAMBAL WALA BAGH NEW MANDI MUZAFFARNAGAR UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
16 Dec 2020, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC MUZAFFARNAGAR
NEAR 132 KV SUB STATION BHOPA ROAD MUZAFFARNAGAR
work tender
2020_UPTCL_531568_1
ETC MU T 89 2020 21
Open Tender
Electrical Works
Item Rate
365 days
sa
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD MUZAFFARNAGAR
₹2,000
16 Dec 2020
19 Nov 2020
16 Dec 2020
19 Nov 2020
16 Dec 2020
19 Nov 2020
90 days
Amount
Opening/cutting of nut & bolt of remaining cut pieces of tower members stolen by miscreants to be opened/cut safely with the help of gas cutter/hacksaw blade. Fabrication & fixing of tower members including cartage of steel angles from Sub-Station store, punching holes for proper placement tightening of nuts & bolts punching & chamfering at different tower location of above Transmission line and associated work to complete the job satisfactorily .
Attending breakdown of broken Panther conductor by jointing it with Mid span/Dead end compression joints including sagging down of conductor and compressing of Mid span/Dead End joints and restring of the same.
Manually checking of polymer disc insulator string from cross arm to tower top of all tower locations, checking of its healthiness of insulator string.
Complete replacement of 120 & 70 KN damaged polymer string with new polymer string by using special T&P. Work involves carriage of all material from the store to site & scrap if any return back to the concern substation store .
Replacement of 70 KN Suspention Polymer/Porcalin disc string.
Replacement of 120 KN Tension Polymer/Porcalin disc string.
Repairing of damaged ACSR Panther conductor by repairing sleeves whel conductor down to earth during attending breakdown of conductor as maintion in above SL. No. 2 Repairing sleeve will be provided by depratment .
Attending breakdown of earthwire/tightening of loose earthwire per span alongwith associated work to complete the job satisfactorily as per technical specification.
Tightening of jumpers at tension towers on both side & replacing nut, bolt & washer if required per .
Fixing of missing/displaced arcing horn.
Fixing of missing/displaced vibration dampers.
Removing of bird’s nest from different towers in respect of above lines.
Strengthening/replacement of damaged jumpers at tension towers.
Chitra Contractor and Suppliers
RAHUL ELECTRIC ENGGINEERING WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .