| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 CrAccepted-AOC | ₹6.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.8 Cr+₹20.2 L (3.08%)Rejected-AOC | ₹6.8 Cr+₹20.2 L (3.08%) | L2 | Rejected-AOC L2 |
Tender Value
₹7.3 Cr
EMD Value
₹14.6 L
Closing Date
26 Nov 2022, 4:00 pmClosed
S. E. Irrigation Construction Circle, Varanasi
S. E. Irrigation Construction Circle, Varanasi
C.C lining of birno Dy between k.m. 36.540 to k.m. 42.420 by pawer machine.
2022_UPIDC_751552_5
02/SE/2022-23
Open Tender
Civil Works
Item Rate
90 days
Lathudih
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹14.6 L
30 Jan 2023
21 Nov 2022
26 Nov 2022
21 Nov 2022
26 Nov 2022
21 Nov 2022
Amount
Constructing T.B.M pillar at every 100 m. interval including cost of all materials labour and T&P
Dewatering from bed of canal for workable condition assuming 1 pump in per 50 mtrs for 8 hours.
Earth Work in strenthening of banks for making canal section for c.c lining with all lead lift in all types of soil with proper dressing and manual compaction as per direction of engineer in-charge
Earth work in Excavation in foundation for laying sleeper with proper dressing and manual compaction in all types of soil including all lead, lift, T&P etc complete as per directed by engineer in-charge
supplying and filling Local Sand including cost of all materials, labour, T&P with all lead & lift etc complete.
Preparation of Subgrade for lining works including all lead, lift, T&P etc complete.
Providing & Layaing C.C. M20 grade for sleeper(200x200mm.) including cost of all materials, labour, T&P with all lead & lift etc complete.
centering and shuttering for c.c work including cost of all material labour and T&P etc.
Supplying and laying L.D.P.E film 100 micron thick in bed and slope including cost of all material labour and T&P etc. required for proper completion of work
Laying 75 mm thick c.c in M20 grade in lining in bed and side slope including cost of all materials labour and T&P etc.
Making construction joint painting with sealing primer and filling with sealing compound including cost of all materials labour T&P etc.
MSA CONSTRUCTION PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .