Superintending Engineer, EDC, Hapur
Superintending Engineer, EDC, Hapur
Replacement of jarjar 33KV XLPE cable and other associated work in area of EDD-II Hapur and Garh Business Plan 2024-25
2024_PVVNL_927797_1
10(W)/EDCH/2024-25
Open Tender
Electrical Works
Lump-sum
Hapur
enclosed
3 documents required · 3 mandatory
₹3,540
SE, EDC, Hapur
₹57,000
20 Jun 2024
12 Jun 2024
19 Jun 2024
12 Jun 2024
19 Jun 2024
12 Jun 2024
Amount
FOR REPLACEMENT OF JARJAR 33KV XLPE CABLE AND LAYING NEW 33KV XLPE CABLE AT VARIOUS PLACES AND OTHER ASSOCIATED WORKS (12 Nos. Works.), IN BUSINESS PLAN (2024-25), IN THE AREA OF EDD-II HAPUR AND GARHMUKTESHWER, UNDER EDC., HAPUR (Third party inspection of the quality of all works will be conducted by the department.)
Carriage of all petty material of estimate, from Electricity store center, Hapur to 33/11KV Sub-Station/site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Carriage of all cable/conductor of estimate from JE Store/CTR/ESC, Hapur to site of work, including loading & unloading at both ends, as per direction of site incharge.
Carriage of ST Pole 13 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
Erection of double pole structure with all accessories on ST Pole 13 mtr. long, fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Drawing/Norms by providing all clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts, and jumpering etc work, and as per direction of site incharge.
Erection & Fixing of STP Pole 13 mtr. long in 33 KV line after digging of suitable pits including fixing of requisite all accessories as per RESPO Drawing/Norms by providing F-Bracket and holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts., and as per direction of site incharge.
Laying , Stringing and final sagging of ACSR Dog Conductor, as per RESPO/Drawing Norms and as per direction of site incharge.
Laying of 160mm O/D PN-4PE-80 PN-4 grade UV stabilized HDPE pipe as per IS of 6meter, for laying of underground Cable as per RESPO/Norms, including cost of above HDPE pipe, as per direction of site incharge
Laying of 33KV XLPE Cable 3x300Sqmm, undergound trenchless (310x2=620 Double Circuit) into HDPE Pipe, spare cable shall be left in the loop shape at both ends as per RESPO/Norms and as per direction of site incharge
Laying of 33KV XLPE Cable 3x300Sqmm, undergound trenchless (2105x1=2105 Single Circuit) into HDPE Pipe, spare cable shall be left in the loop shape at both ends as per RESPO/Norms and as per direction of site incharge
Grouting & fixing of stay rods (16x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops., as per direction of site incharge.
Earthing of supports with MS earth Rod of (20x2540)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts., and as per direction of site incharge.
Grouting of ST/PCC supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials., and as per direction of site incharge.
Making and filling of 33KV Cable Jointing Kit 3x300Sqmm, outdoor type, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms, and as per direction of site incharge.
Providing & Fixing of G.I. pipe 6"dia Class-B over XLPE cable before mounting the cable at double pole. The work includes fitting of clamps, sealing of top and bottom of pipe and one end of pipe is to be burried under earth about 500mm earch including mounting and clamping the cable on double pole structure and making connection with overhead line at both ends.
Dismantling work and carriage of old and jarjar scrap 33KV XLPE Cable 3x300Sqmm as per Estimate from site of work to Electricity store center, Hapur with loading and unloading at both ends on Kachha Packka road.
Jumpering and line energisation work properly as per RESPO/Norms and as per direction of site incharge.
M/S GOVIND ENTERPRISES
Yash Contractor
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .