Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-Finance | ₹2.7 L | L1 | Accepted-Finance 1ST LOWEST |
| 2 | L2₹2.8 LRejected-Finance | ₹2.8 L | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹2.8 LRejected-Finance | ₹2.8 L | L3 | Rejected-Finance 3RD LOWEST |
Tender Value
₹2.7 L
EMD Value
₹6,000
Closing Date
13 Jul 2026, 2:00 pmClosed
EXECUTIVE ENGINEER (W/S) , GRWW
KOLKATA MUNICIPAL CORPORATION OFFICE OF THE EXECUTIVE ENGINEER (WATER SUPPLY) GARDEN REACH WATER WORKS, BIDHANGARH, KOL-66
STRENGTHENING OF FOUR NOS 1600 MM DIA LEAKY PSC SOCKET JOINT AT DIFFERENT LOCATIONS, TWO NOS NEAR VEELINE MEDIA LTD ,ONE NOS OPPOSITE DEEP BHABAN AND ONE NOS CENTURY HOUSE ON TARATALA ROAD
2026_KMC_1030606_1
EEWS/KMC/GRWW/26-27/05
Open Tender
MECHANICAL
Percentage
12 days
GARDEN REACH WATER WORKS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
27 Aug 2026
2 Jul 2026
15 Jul 2026
2 Jul 2026
13 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and
ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm | - | CUBIC METER PERCENT | 119.27 | - |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring | 0.6 | CUBIC METER PERCENT | 192.38 | ₹115.43 |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and
ramming the bottom, bailing out water as required complete (c)Depth of excavation for additional depth
beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary. | 1 | CUBIC METER PERCENT | 234.7 | ₹234.68 |
| 4 | Hire and labour charges for shoring
work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with
supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in
charge).(a) Depth upto 1.5 m. | 93.6 | SQUARE METER | 386 | ₹36,129.6 |
| 5 | Hire and labour charges for shoring
work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with
supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in
charge)(b) For additional depth
beyond 1.5 m. and upto 3.00 m | 0.28 | SQUARE METER | 439 | ₹122.92 |
| 6 | Hire and labour charges for shoring
work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with
supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in
charge)(c) For additional depth beyond 3.00 m. | 56.16 | SQUARE METER | 498 | ₹27,967.68 |
| 7 | Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in- Charge. (Note: This work should not be executed without specific permission of Superintending Engineer). (100 mm. dia bamboo railing & 150mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.80m apart). (ii) Railing 3 row on each leg and 1 at pivot point. | 72 | METER | 178 | ₹12,816 |
| 8 | Sealing of uneven gap in PSC Socket/spigot joint by insertion of 19 mm thick asbestos graphite packing
(AMP-32) including supplying. Fitting and fixing all complete.. | - | METER | 870 | - |
| 9 | Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and
making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall
be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in
absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor] | - | HORSE POWER HOUR | 33 | - |
| 10 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 0.56 | CUBIC METER PERCENT | 77.54 | ₹43.41 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
Tendernotice_2.pdf
PDF • 0.64 MB
BOQ_2530708.xls
BOQ • 0.35 MB
TBID05.pdf
Tender Documents • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].