Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L1₹3.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 3 | L2₹3.7 L+₹74,450.67 (25.0%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹5.0 L
EMD Value
₹9,960
Closing Date
8 Jun 2026, 4:00 pmClosed
Executive Engineer PWD RandB Division R S Pura
Executive Engineer PWD RandB Division R S Pura
BOQ
2026_PWDJK_311280_1
Short e-NIT No. DRSP/23 of 2026-27 Dated 01-06-2026
Open Tender
Civil Works
Percentage
60 days
Arnia
eNIT/SBD
3 documents required · 3 mandatory
₹600
Executive Engineer PWD RandB Division R S Pura
₹9,960
R S Pura
13 Jun 2026
1 Jun 2026
9 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge, 1:3:6 or richer mix (i/c equivalent design mix) | 10.75 | cum | 1,725.2 | ₹18,545.9 |
| 2 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 2.2 | cum | 2,516.85 | ₹5,537.07 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches, drains, pipes and cables etc. (not exceeding 1.5mtr in width or 10sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5mtr including getting out excavated soil and disposal of surplus soil as directed, within a lead of 50 mtr.(All Kinds) | 13.88 | CUM | 256.85 | ₹3,565.08 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:5:10 (1 cement: 5 coarse sand: 10 graded stone aggregate 40mm nominal size). | 7.78 | CUM | 4,826.5 | ₹37,550.17 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size). | 25.49 | CUM | 5,733.6 | ₹1,46,149.46 |
| 6 | Providingand and laying in position specified grade of reinforced cement concrete (1:1.5:3) excluding the cost of centering. shuttering, finishing and reinforcement-All work upto plinth level. | 8.23 | cum | 7,788.4 | ₹64,098.53 |
| 7 | Reinforcement for RCC works including straightening, cutting, bending, placing in position and binding all complete | 822.9 | kg | 123.2 | ₹1,01,381.28 |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 9.71 | cum | 218.4 | ₹2,120.66 |
| 9 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 16.5 | sqm | 416.5 | ₹6,872.25 |
| 10Centring and shuttering including strutting, propping etc and removal of form work for.- | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_1008022.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .