Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -21.13% | ₹1.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -21.07% | ₹1.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -21.00% | ₹1.9 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.2 LAdmitted-Fee/PreQual/Technical/Finance | -11.11% | ₹2.2 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.4 L
EMD Value
₹4,880
Closing Date
8 Aug 2026, 2:00 pmClosed
XEN HANDWARA
xen handwara
Providing, Fixing and Upgradation of Distribution Network at Nandpora, Malikpora and Shiltara under distt capex incl. testing and commissioning for the year 2026-27
2026_PHE_318686_7
NIT No. 02 of 2026-27
Open Tender
Civil Works
Percentage
WORKS
Please refer Tender documents.
2 documents required · 2 mandatory
₹400
XEN HANDWARA
₹4,880
11 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
8 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil | 164.98 | Cum | 479.3 | ₹79,074.91 |
| 2 | Ordinary Rock | 18.33 | Cum | 924.8 | ₹16,951.58 |
| 3 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.
40 mm dia. | 1,080 | Mtr | 44.85 | ₹48,438 |
| 4 | 25 mm dia. | 186 | Mtr | 33.7 | ₹6,268.2 |
| 5 | 20 mm dia. | 540 | Mtr | 22.25 | ₹12,015 |
| 6 | 15 mm dia. | 570 | Mtr | 22.25 | ₹12,682.5 |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 164.98 | Cum | 218.4 | ₹36,031.63 |
| 8 | CARRIAGE OF MATERIALS of pipes upto By Mechanical Transport including loading, unloading and stacking. Avg lead 40 kms | 4.91 | MT | 560.53 | ₹2,752.2 |
| 9 | Payment for pipe specials shall be made on actual quantities executed at site, duly measured, recorded, and certified by the Engineer-in-Charge, as per approved specifications and site requirements. | 1 | LS | 30,690.61 | ₹30,690.61 |
stage.html
html • 0.02 MB
finance_1051923.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_1051923.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].