Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC 52 GOVINDARAJAPATTINAM THAMARAINAGAR KANNANKURICHI SALEM 636030 | SALEM | SALEM | TAMIL NADU | 636030 | ₹8.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹8.4 L+₹9,918.77 (1.19%)Rejected-AOC | ₹8.4 L+₹9,918.77 (1.19%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | ZAHID TRADING COMPANY L2 | S VIJAYAKUMAR L1 |
|---|---|---|---|---|---|
| 1.00 | Providing pile foundation using 300mm dia aguar etc as per officers etc completed | 40 | m | 290 ₹11,600 | 280 ₹11,200 Lowest |
| 2.00 | Earth work Excavation in all soils with initial lead and lift etc., complete | 5 | m3 | 200 ₹1,000.8 | 197.5 ₹988.29 Lowest |
| 3.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 2 | m3 | 5,340 ₹10,658.64 | 5,338 ₹10,654.65 Lowest |
| 4.00 | Supply and fabrication of RTS rods of various dia including cutting and bending etc complete | 5.04 | Qtl | 9,160 ₹46,166.22 | 9,152 ₹46,125.9 Lowest |
| 5.00 | Supply and erecting shuttering including necessary supports for plane surfaces such as RCC column, footing, plinth beam, stair case etc., in all floors using mild steel sheets of 90cm X 60cm and 10 gauge stiffened with welded mild steel angle for boarding supported by casurina props at suitable intervals etc., completed complying with standard specification and as directed. Sl.No.122 | 73 | m2 | 1,055 ₹77,019.85 | 1,045.5 ₹76,326.31 Lowest |
| 6.00 | Reinforced Cement concrete 1:1.5:3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete | 8 | m3 | 9,185 ₹73,455.57 | 9,181.5 ₹73,427.58 Lowest |
| 7.00 | Brick work in cement mortar 1:5 mix (one cement five sand) using II class table molded bricks chamber burnt bricks of size 9" X 4 1/2" X 3" for the following including curing etc., completed. | 15 | m3 | 7,008 ₹1,05,101.57 | 7,006.5 ₹1,05,079.07 Lowest |
| 8.00 | Plastering in Cement Mortar 1:5 mix 12mm thick | 166 | m2 | 300 ₹49,798.5 | 290.5 ₹48,221.55 Lowest |
| 9.00Supplying and fixing of design grill main gate including cost and conveyance of all labour and material charges ..etc. complete | |||||
| 9.01 | Vicket gate | 150 | kg | 110 ₹16,500 | 105 ₹15,750 Lowest |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
19 Mar 2025, 3:00 pmClosed
Assistant commissioner, westzone
westzone, coimbatore corporation
Construction of GYM Building at Thimmaya nagar in ward no 40 of westzone.
2025_MAWS_531810_44
E7/WESTZONE/2025
Open Tender
Civil Works
Works
90 days
westzone, coimbatore corporation
As per the tender document attached
4 documents required · 4 mandatory
₹0
₹10,000
11 May 2026
14 Mar 2025
20 Mar 2025
14 Mar 2025
19 Mar 2025
14 Mar 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.94 MB
Building.pdf
Tender Documents • 0.68 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_633715.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .