| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Finance | -5.66% | ₹3.9 L | L1 | Admitted-Finance |
| 2 | L2₹4.2 L+₹33,561.26 (8.65%)Admitted-Finance 1 57 BAGHAJATIN COLONY KOLKATA 92 | KOLKATA | WEST BENGAL | +2.50% | ₹4.2 L+₹33,561.26 (8.65%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Shortfall documents as asked for not submitted |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Credential as per NIT not technically complied |
| 5 | Rejected-Technical 18 SANKAR BOSE ROAD KOLKATA | - | - | - | Rejected-Technical Shortfall documents as asked for not submitted |
Tender Value
₹4.1 L
EMD Value
₹8,230
Closing Date
29 Jul 2026, 12:00 pmClosed
EE, DIV-IV, Housing (BSUP), Housing Sector, KMDA
OFFICE OF THE EXECUTIVE ENGINEER DIVISION-IV, HOUSING SECTOR (BSUP), KMDA. UNNAYAN BHAWAN, BLOCK A (6TH FLOOR), SALT LAKE CITY, KOL-91
Repair and renovation of existing boundary wall, jungle cutting and other allied works of KIT property at 34, Muzaffar Ahmed Street (Ripon Street) under Housing Sector, KMDA (2nd Call)
2026_KMDA_1033455_1
13/EE/DIV-IV/Housing (BSUP)/KMDA of 2026-2027
Open Tender
CIVIL WORKS
Percentage
90 days
34, Muzaffar Ahmed Street (Ripon Street)
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹8,230
13 Aug 2026
22 Jul 2026
31 Jul 2026
22 Jul 2026
29 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling R.C. floor, roof, beams etc.including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. a) In Ground floor including roof. | 4 | Cum | 1,956 | ₹7,824 |
| 2 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
a) In Ground floor. | 20 | Cum | 447 | ₹8,940 |
| 3 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof) a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
i) In Grond floor | 30 | Sqm | 335 | ₹10,050 |
| 4 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, bindees etc.including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m a) Tor steel/Mild Steel i) SAIL / TATA / RINL. i) In Ground floor | 0.45 | M.T. | 54,940.3 | ₹24,723.14 |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mmbnominal size) excluding shuttering and reinforcement if any, in ground floorbas per relevant IS codes. i) In Ground floor | 3.3 | Cum | 5,774.26 | ₹19,055.06 |
| 6 | Brick work with 1st class bricks in cement mortar (1:4) b) In superstructure, In Ground floor | 1.65 | Cum | 5,835.15 | ₹9,628 |
| 7 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) i) In Ground floor | 55 | Sqm | 728.37 | ₹40,060.35 |
| 8 | Labour for Chipping of concrete surface before taking up Plastering work. | 30 | Sqm | 21 | ₹630 |
| 9 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed | 290 | Sqm | 19 | ₹5,510 |
| 10 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (1st floor).[Excluding cost of chipping over concrete surface] i) With 1:4 cement mortar b) 20 mm thick plaster | 315 | Sqm | 192.72 | ₹60,706.8 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.69 MB
Tendernotice_2.pdf
PDF • 0.16 MB
Tendernotice_3.pdf
PDF • 0.07 MB
BOQ_2538117.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .