Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Finance | +4.50% | ₹5.5 L | L1 | Admitted-Finance |
| 2 | L2₹5.6 LAdmitted-Finance | +6.00% | ₹5.6 L | L2 | Admitted-Finance |
Tender Value
₹5.2 L
EMD Value
₹10,500
Closing Date
21 May 2026, 3:00 pmClosed
Natalino Francisco Vissoscar
Paroda
Re-Construction of drainage from Luis Olivera house to the house of Eddy Olivera at Coraid in Ward No. III of V.P. Paroda
2026_VP_29200_1
VP/P/2026-27/279 Line4
Open Tender
Civil Works
120 days
Paroda
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹10,500
6 Jun 2026
12 May 2026
23 May 2026
12 May 2026
21 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 1.01 | a) All kinds of soil | 81.6 | M3 | 291 | ₹23,745.6 |
| 1.02 | b) All types of Ordinary rock including all types of laterite rock, blasting prohibited | 20.4 | M3 | 672 | ₹13,708.8 |
| 2 | Rubble packing with hard Laterite stone under floors including watering ramming and consolidating etc in pipeline trenches & other foundation complete | 18.36 | M3 | 2,211 | ₹40,593.96 |
| 3Providing and laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate 20 mm nominal size) excluding the cost of centering, shuttering and finishing etc | |||||
| 3.01 | a) All works upto plinth level | 9.18 | M3 | 6,810 | ₹62,515.8 |
| 3.02 | a) All works upto plinth level | 24.48 | M3 | 6,810 | ₹1,66,708.8 |
| 4Centering & shuttering including Strutting, Propping & removal of forms for | |||||
| 4.01 | a) Foundations, footings, bases for columns and mass concrete. | 122.4 | M2 | 407 | ₹49,816.8 |
| 5Supplying and fixing of Precast RCC slabs(factory made,the factory should be ISO certified and registered under Dirctorate of Industries, Govt. of India) at site in concrete Grade of M-25 with 20 mm nominal size Granitic or basaltic aggregate, consolidated by means of mechanical platform, vibration etc. with lifting hooks of M.s. 10mm bars and PVC cups including cost of reincforcement, Certificate from manufacturer shall be produced indicating grade of concret and minimum content of steel in the product along with 5 year free replacement warranty in case of breakage complete and as directed by Engineer -in -charge. | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_29633.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid