| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | L1 | Accepted-AOC M/s. Neom Builders has quoted lowest rate of below from the estimate rate and his rate has been approved and placed for council sanction. | |
| 2 | L2₹3.7 L+₹4,925 (1.35%)Rejected-Finance | L2 | Rejected-Finance Thiru. Hisham Ali has quoted lowest rate of above from the estimate rate. |
| Sl No | Description | Qty | Unit | NEOM BUILDERS L1 | HISHAM ALI L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for Open excavation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 3 | m3 | 468 ₹468 Lowest | 540 ₹540 |
| 2.00 | Earthwork excavation for foundation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 7 | m3 | 2,191 ₹2,191 Lowest | 2,240 ₹2,240 |
| 3.00 | P.C.C.1:4:8 mix using 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 4 | m3 | 28,916 ₹28,916 Lowest | 29,200 ₹29,200 |
| 4.00 | Supplying and erection of Steel Centering with strutting and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 42 | M2 | 16,464 ₹16,464 Lowest | 16,800 ₹16,800 |
| 5.00 | P.C.C.1:3:6 mix using 20 mm & 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 12 | M3 | 94,200 ₹94,200 Lowest | 94,800 ₹94,800 |
| 6.00 | Brick work in cm 1:5 mix using best country bricks and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 3 | m3 | 24,711 ₹24,711 Lowest | 24,900 ₹24,900 |
| 7.00 | Supplying and fabrication of steel and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 500 | Kg | 50,500 ₹50,500 Lowest | 52,500 ₹52,500 |
| 8.00 | RCC 1:1.5:3 mix using 20mm ISS metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 5 | m3 | 57,245 ₹57,245 Lowest | 57,500 ₹57,500 |
| 9.00 | P.C.C.1:2:4 mix using 20mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 2 | m3 | 17,168 ₹17,168 Lowest | 17,200 ₹17,200 |
| 10.00 | Plastering in cm 1:3 to 12mm thick and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 64 | m2 | 23,040 ₹23,040 Lowest | 23,360 ₹23,360 |
Tender Value
₹4.5 L
EMD Value
₹4,500
Closing Date
12 Mar 2024, 3:00 pmClosed
Executive Officer
Sholur Town Panchayat Sholur Post The Nilgirs
15th FC 2nd Install Tied 23-24-Maintenance of GLR at Kottatty Ward No.4
2024_DTP_446852_1
278/2023-6
Open Tender
Civil Works
Works
120 days
Sholur Town Panchayat
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹4,500
Yes
27 Aug 2025
11 Mar 2024
12 Mar 2024
11 Mar 2024
12 Mar 2024
11 Mar 2024
11 Mar 2024 - 12 Mar 2024
Earthwork excavation for Open excavation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification.
Earthwork excavation for foundation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification.
P.C.C.1:4:8 mix using 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Supplying and erection of Steel Centering with strutting and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
P.C.C.1:3:6 mix using 20 mm & 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Brick work in cm 1:5 mix using best country bricks and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Supplying and fabrication of steel and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
RCC 1:1.5:3 mix using 20mm ISS metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
P.C.C.1:2:4 mix using 20mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Plastering in cm 1:3 to 12mm thick and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Plastering in cm 1:5 to 12mm thick and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
Supplying and fixing in position of M.S. Ladder and MS Cover the rate including cost and conveyance of all materials and labour charges etc., complete complying with standard specifications.
Painting two coats using best Emulsion and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification
HISHAM ALI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_532127.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .