Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.0 LAccepted-AOC WARD NO 0 9 MAIN ROAD BUDHAR DISTRICT SHAHDOL M P | BUDHAR | SHAHDOL | MADHYA PRADESH | 484110 | L1 | Accepted-AOC After techno-commercial acceptance of L1 bidder by the committee and the
recommendation to award the contract is approved by competent authority, contract is being hereby awarded to L1 bidder | |
| 2 | L2₹74.1 L+₹3.0 L (4.16%)Rejected-Finance AT DERA COLLIERY TALCHER ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | L2 | Rejected-Finance Rejected being L2 bidder. | |
| 3 | L3₹76.8 L+₹5.6 L (7.86%)Rejected-Finance BHAGWAN NIWAS WARD NO 30 DADARKHURD DADAR NALLA KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | L3 | Rejected-Finance Rejected being L3 bidder. | |
| 4 | Rejected-Technical AT NAKULABASAPUR PO HENSAMULA TALCHER DIST ANGUL ODISHA PIN 759103 | TALCHER | ANGUL | ODISHA | 759103 | - | Rejected-Technical Technically rejected by TC | |
| 5 | Rejected-Technical AMBAMUNDA HENSMUL TALCHER DIST ANGUL PIN 759103 | TALCHER | ANGUL | ODISHA | 759103 | - | Rejected-Technical Technically rejected by TC |
Tender Value
₹1.5 Cr
EMD Value
₹1.9 L
Closing Date
10 Jan 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SO(EandM),KUSMUNDA AREA
OFFICE OF THE STAFF OFFICER (EandM),GM Office SECL KUSMUNDA
Laying and Transporting of 06 ranges ( 02 Ranges of 4 Km and 04 Ranges of 3.5 KM) of M.S delivery lines size (8 inch/10 inch) dia at Contractual sumps ( Neelkanth A/D-Patch and Neelkanth-B/C patch)of Kusmunda Mines
2024_SECL_324025_1
SECL/GM/KSM/SO(EnM/NIT/95
Open Tender
Miscellaneous Works
Item Rate
120 days
KUSMUNDA OPEN CAST PROJECT
Please refer tender documents
5 documents required · 5 mandatory
₹1.9 L
18 Feb 2025
24 Dec 2024
11 Jan 2025
24 Dec 2024
10 Jan 2025
25 Dec 2024
24 Dec 2024 - 3 Jan 2025
Amount
Description of Work
Transportation of old or new 8"/10" dia MS pipes from Workshop or quarry which includes manual loading and unloading of pipes in Departmental Truck (Eicher/Hyva) at workshop or quarry as per the instruction of Work Incharge or Engineer Incharge with proper stacking of pipes to avoid any damage to the pipe. NOTE: Departmental Truck(Eicher/Hvya) will be provided for transportaion of pipes as per the need and avaialbility.
Welding of old or new 8"/10" dia M.S Pipes as per the instruction of work incharge or Engineer Incharge which includes (A) Laying and welding of pipes in proper position with earth work as per the ground profile at the working place .(B) Welding of pipes at the safe location as per the instruction of work incharge or Engineer Incharge for laying at high wall and across the road. (C) Laying,jointing and matching of welded pipes across the road and in high wall with the existing pipline. (D) Matching of new pipelines with the existing pipelines as per the instruction of work incharge or Engineer incharge. NOTE: (1) All tool and tackles , welding electrodes of required sizes, welding cutter, welding plant (minimum 20 KVA capacity DG set along with welding machine), cutting gases (DA Cylinder, Oxygen Cylinder), fuel and lubricating oil for welding plant etc. to be provided by the Contractor.(2) Power source (01 no. Vehicle mounted DG set with Diesel) will be provided by contractor.
Welding of cleatsof size (6"*2") for strengthening of pipes at various points in the delivery lines as per the instruction of Engineer Incharge or Work Incharge
Note : Work period will be of 120 days and work will be taken on various sites by deploying 3 distinct and separate gangs to execute the work .27 manshifts per day will be rquiredwith sufficient number of DG set. The above work shall be carried out in 3 phases as mentioned below : 1st phase(1st 60 days) : 50 % (approx.) of work 2nd Phase (next 30 days) : 35% (approx.) of work) 3rd phase (last 30 days) : rest of the work.
Total impact of GST for the purpose of CTC
OMM SHANKAR TRANSPORT (BID ID -1112898)
m/s bhagwan saran and associates (BID ID -1114943)
techsummary_335879.pdf
PDF • 0.06 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_335879.pdf
PDF • 0.06 MB
LOA105.pdf
PDF • 1.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .