Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1,300
Closing Date
2 Jan 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC-II ALIGARH
ALIGARH
EDC2A-41/2022-23
2022_DVVNL_763023_1
EDC2A-41/2022-23
Open Tender
Electrical Works
Item Rate
45 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL AGRA WEBSITE
₹1,300
4 Jan 2023
28 Dec 2022
2 Jan 2023
28 Dec 2022
2 Jan 2023
28 Dec 2022
Amount
Cartage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
STP poles 11 Mtr.
PCC poles 8.5 Mtr.
Cartage of line material viz Cable, Conductor/ GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps, cable, Stone pad & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective end, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
STP poles 11 Mtr.
PCC poles 8.5 Mtr.
Erection of double pole on following poles including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
PCC poles 8.5 Mtr.
(a) Erection & Grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work.
(b) Providing and fixing of stay insulator.
Carriage and installation of store to site of following capacity transformer due to overloaded including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
25 KVA T/F
63 KVA T/F
100 KVA T/F
400 KVA T/F
Demounting & carriage of following capacity transformer due to damage of PCC poles including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
63 KVA T/F
250 KVA T/F
Body and neutral earthing of 400 KVA L.T. distribution Transformers installed by digging of pit up to water level depth (approx. 100’) and then inserting 1-1/4" dia G.I. pipe of "B" grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer including the cost of arrangement of all material, labourer, T&P, carrier etc. required for proper completion of work. Details given below.
Safe carriage of LT cable of size 3.5X70 Sq.mm. from store to respective site of work including loading unloading at both ends.
Laying of 4x16/3.50x70 Sq.mm. LT Cable Jumphering from L.T. Site transformer to Line.
Laying, sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
ACSR Weasal Conductor.
Cable ABC 3x95+1x70+1x16 Sq.mm
Grouting of poles as per RESPO norms including cost of grouting material (cement: sand: brick ballast) size as per RESPO norms. This qty also includes the additional work of old & existing LT line which has to be converted into HT line. Presently the supports of old line do not have grouting.
STP poles 11 Mtr.
PCC poles 8.5 Mtr.
Making the plinth of Steel poles.
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work.
Fixing of Stone Pad as per RESSPO norms.
Fixing of V-Type Steel cross arm with clamp as per RESSPO norms.
Fixing of M.S. Angle 75x75x6x2028mm (T/F Base) for Bracing Set with 4 No clamps as per RESSPO norms.
Fixing of Eye Hook with clamp for PPC Pole With N&B for L.T. Line as per RESSPO norms.
Fixing of End Clamp for L.T. Line as per RESSPO norms.
Fixing of Top Channel (125x65x2240mm) as per RESSPO norms.
Fixing of Dropper Channel as per RESSPO norms.
Fixing of Holding Clamp with Bolt nut as per RESSPO norms.
Fixing of Tee-off Channel with clamp and N&B as per RESSPO norms.
Fixing of Number Plate with clamp as per RESSPO norms.
Fixing of Danger board with Clamp for 33 KV as per RESSPO norms.
Chopping of tree branches which are touching to HT/LT lines.
Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel. as per specification of UPPCL construction manual including including loading and unloading at the both ends.
Providing & Fixing of Clamps of LT, Cross Arm Holding, F-Clamp, Stay Clamp, Danger board clamp with Nut & Bolts.
Providing/Fixing of missing Nut bolts and washer
Safe carriage of LT distribution box (three phase) with Clamps from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms.
SHARMA ELECTRIC WORKS
MS M.R.G.ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .