| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC KOHRAUL PO YOGICHIOURA DISTT SONEBHADRA UP | L1 | Accepted-AOC AWARD OF WORK TO L1 BIDDER AND REJECT L2 AND L3 BIDDER DUE TO NOT L1 BIDDER | |
| 2 | Rejected-Technical DAKRA RANCHI PIN 829201 | CHATRA | JHARKHAND | 829201 | - | Rejected-Technical NOT L1 BIDDER | |
| 3 | Rejected-Technical 56 HARSHNAGAR VEER ENGINEERING WORKS ROBERTSGANJ RAILWAY STATION ROAD SONBHADRA UTTAR PRADESH 231216 | SONBHADRA | UTTAR PRADESH | 231216 | - | Rejected-Technical NOT L1 BIDDER |
| Sl No | Description | Qty | Unit | SHASHI ENGINEERING WORKS L1 | Veer Engineering Works L3 | New Diamond Engineering Services L2 |
|---|---|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc.- 1. Complete cleaning of fairlead gate assembly, Horizontal pulley, Drag rope tray and Pin housing and nearby area. 2. Fabrication of desired platforms/stands for jacking to remove pin of Gate assembly. 3. Removal of 04 nos. Gate assembly and its repairing. 4. Rebuilding of worn out housing Rope path. 5. Repairing of structural cracks and assembling of vertical pulley in fairlead gate assembly (LHS & RHS). 6. Repairing of worn out area near horizontal pulley (04 nos.) by means of welding. 7. Co-axial boring of built-up housing to its original size. 8. Fitment of Gate assembly and 04 nos. Horizontal pulley in machine. 9. Repair of drag tray including fitment of Conveyor belt/rubbing block on tray. | ||||||
| 2.00Complete cleaning of fairlead gate assly., horizontal pulley, drag rope tray and pin housing. | ||||||
| 2.10 | Labour charges for complete cleaning of fairlead gate assly., horizontal pulley, drag rope tray and pin housing including contractor's profit.
Note : It includes a group of 04 nos. Semi-Skilled Fitter and 01 no. Supervisor, in 02 shifts per day for 02 days for 01 no. job. | 1 | Job | 10,000 ₹10,000 Lowest | 12,000 ₹12,000 | 10,000 ₹10,000 Lowest |
| 3.00Making of 04 nos. platforms/ stands for jacking to remove pins of gate assy. (parallel activity with cleaning). | ||||||
| 3.10 | Labour charges for making of platforms/ stands for jacking to remove pins of gate assy. (04 nos.)(parallel activity with cleaning) including contractor's profit.
Note : It includes a group of 02 nos. Skilled Fitter, 02 nos. Skilled Welder, 04 nos. Semi-Skilled Fitter and 01 no. Supervisor in 02 shifts per day for 02 days for 01 no. job. | 1 | Job | 10,000 ₹10,000 Lowest | 18,000 ₹18,000 | 40,000 ₹40,000 |
| 4.00Removal of 04 nos. gate assly by means of jacking. | ||||||
| 4.10 | Labour charges for removal of 04 nos. gate assly by means of jacking including contractor's profit.
Note : It includes a group of 02 nos. Skilled Fitter, 02 nos. Skilled Welder, 06 nos. Semi-Skilled Fitter and 01 no. Supervisor in 02 shifts per day for 02 days for 01 no. job. | 1 | Nos. | 12,000 ₹12,000 | 23,000 ₹23,000 | 5,000 ₹5,000 Lowest |
| 5.00Rebuilding of worn out housing Rope path (parallel activity with line boring). | ||||||
| 5.10 | Labour charges for rebuilding of worn out housing Rope path including contractor's profit.
Note : It includes a group of 02 nos. Skilled Fitter, 02 nos. Skilled Welder, 02 nos. Semi-Skilled Fitter and 01 no. Supervisor in 02 shifts per day for 04 days for 01 no. job. | 1 | Job | 15,000 ₹15,000 Lowest | 28,000 ₹28,000 | 50,000 ₹50,000 |
| 6.00Repairing of structural cracks and assembling of vertical pulleys in fairlead gate assy (LHS& RHS). | ||||||
Tender Value
₹8.6 L
EMD Value
₹10,800
Closing Date
4 Aug 2025, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, UP-231222
Repairing of Gate assembly, Horizontal Pulley housing and line boring of housing of Hinge pins of 33/72 Somnath Dragline of Khadia Project.
2025_NCL_339954_1
KHD/G.M. (Excv)/E-Tender/25-26/ 458
Open Tender
Excavation Department Work
Item Rate
20 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,800
20 Dec 2025
21 Jul 2025
5 Aug 2025
21 Jul 2025
4 Aug 2025
22 Jul 2025
21 Jul 2025 - 28 Jul 2025
Amount
Scope of Work/Technical Specifications etc.- 1. Complete cleaning of fairlead gate assembly, Horizontal pulley, Drag rope tray and Pin housing and nearby area. 2. Fabrication of desired platforms/stands for jacking to remove pin of Gate assembly. 3. Removal of 04 nos. Gate assembly and its repairing. 4. Rebuilding of worn out housing Rope path. 5. Repairing of structural cracks and assembling of vertical pulley in fairlead gate assembly (LHS & RHS). 6. Repairing of worn out area near horizontal pulley (04 nos.) by means of welding. 7. Co-axial boring of built-up housing to its original size. 8. Fitment of Gate assembly and 04 nos. Horizontal pulley in machine. 9. Repair of drag tray including fitment of Conveyor belt/rubbing block on tray.
Complete cleaning of fairlead gate assly., horizontal pulley, drag rope tray and pin housing.
Labour charges for complete cleaning of fairlead gate assly., horizontal pulley, drag rope tray and pin housing including contractor's profit. Note : It includes a group of 04 nos. Semi-Skilled Fitter and 01 no. Supervisor, in 02 shifts per day for 02 days for 01 no. job.
Making of 04 nos. platforms/ stands for jacking to remove pins of gate assy. (parallel activity with cleaning).
Labour charges for making of platforms/ stands for jacking to remove pins of gate assy. (04 nos.)(parallel activity with cleaning) including contractor's profit. Note : It includes a group of 02 nos. Skilled Fitter, 02 nos. Skilled Welder, 04 nos. Semi-Skilled Fitter and 01 no. Supervisor in 02 shifts per day for 02 days for 01 no. job.
Removal of 04 nos. gate assly by means of jacking.
Labour charges for removal of 04 nos. gate assly by means of jacking including contractor's profit. Note : It includes a group of 02 nos. Skilled Fitter, 02 nos. Skilled Welder, 06 nos. Semi-Skilled Fitter and 01 no. Supervisor in 02 shifts per day for 02 days for 01 no. job.
Rebuilding of worn out housing Rope path (parallel activity with line boring).
Labour charges for rebuilding of worn out housing Rope path including contractor's profit. Note : It includes a group of 02 nos. Skilled Fitter, 02 nos. Skilled Welder, 02 nos. Semi-Skilled Fitter and 01 no. Supervisor in 02 shifts per day for 04 days for 01 no. job.
Repairing of structural cracks and assembling of vertical pulleys in fairlead gate assy (LHS& RHS).
Labour charges for repairing of structural cracks and assembling of vertical pulleys in fairlead gate assy (LHS& RHS) including contractor's profit. Note : It includes a group of 02 nos. Skilled Fitter, 02 nos. Skilled Welder, 04 nos. Semi-Skilled Fitter and 01 no. Supervisor in 02 shifts per day for 06 days for 01 no. job.
Repairing of worn out area near horizontal pulley (4 nos.) by means of welding(parallel activity with line boring).
Labour charges for repairing of worn out area near horizontal pulley (4 nos.) by means of welding (parallel activity with line boring) including contractor's profit. Note : It includes a group of 02 nos. Skilled Fitter, 02 nos. Skilled Welder, 02 nos. Semi-Skilled Fitter and 01 no. Supervisor in 02 shifts per day for 05 days for 01 no. job.
Fitment of gate assy. and 04 nos. Horizontal pulleys in machine.
Labour charges for fitment of gate assy. and 04 nos. Horizontal pulleys in machine including contractor's profit. Note : It includes a group of 02 nos. Skilled Fitter, 02 nos. Skilled Welder, 06 nos. Semi-Skilled Fitter and 01 no. Supervisor in 02 shifts per day for 02 days for 01 no. job.
Repair of drag tray including fitment of conveyor belt/rubbing block on tray(parallel activity).
Labour charges for repairing of drag tray including fitment of conveyor belt/rubbing block on tray(parallel activity) including contractor's profit. Note : It includes a group of 02 nos. Skilled Fitter, 02 nos. Skilled Welder and 02 nos. Semi-Skilled Fitter in 02 shifts per day for 04 days for 01 no. job.
Co-axial boring of built- up housing to its original size.
Charges for co-axial boring of built- up housing to its original size. Note : 1.Size of housing: ID = 200mm, L = 480mm (for 4 nos.). 2.Volume to be machined= 22/7 x 1/4 (21+20) x(21-20) x 48 x 4 Cu Cm = 6179.52 Cu Cm.
Charges for bush pressing/ fitting in housing.
Hiring chargess for repairing of gate assembly, horizontal pulley housing and line boring of housing of pulley pins.
Hiring Charges of welding machine with accessories - 03 nos. for a period of 12 days.
Hiring Charges of gas cutting set with accessories- 02 nos. for a period of 12 days.
Hiring Charges of grinders- 02 nos. for a period of 12 days.
Hiring Charges of hydraulic jacks (200 T)- 02 nos. for max period of 12 days.
Hiring Charges of misc. tools (Chipping hammers, tie rods, wedges, hammers, crowbars etc.).
Transportation charges.
Total impact of GST for the purpose of CTC
New Diamond Engineering Services (BID ID -1172701)
Veer Engineering Works (BID ID -1172628)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .