Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹5.6 Cr+₹31.0 L (5.82%)Rejected-Finance 190 B BILANDPUR NEW COLONY NEAR PRATAP COACHING GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.8 Cr+₹51.6 L (9.69%)Rejected-Finance KH NO 17 B H U NO 74A KAUSHALPURI COLONY KHARGAPUR GOMTINAGAR LUCKNOW U P | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical As per uploaded |
| Sl No | Description | Qty | Unit | M/S USHA SHAHI CONSTRUCTION L1 | M/S ABHAY ASSOCIATES L2 | M/s Narayan Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00 | E/W in filling in all types of soil including all leads, lifts and proper disposal and back filling as per direction of E/I including cost of T&P & labour etc required for proper completion of work. | 9,404.76 | M³ | 150 ₹14,10,714 Lowest | 160 ₹15,04,761.6 | 180 ₹16,92,856.8 |
| 2.00 | E/W in excavation of foundation in all type of soil including initial lead up to 30m & lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge required for proper completion of work including cost of all T&P,Labour etc. | 3,680.1 | M³ | 70 ₹2,57,607 Lowest | 75 ₹2,76,007.5 | 80 ₹2,94,408 |
| 3.00 | Laying P.C.C, A-20, M-15 in foundation with cement (PPC),coarse sand of F.M not less then 2.00 and crushed hard stone ballast (10-20mm size) including lead up 60m lift up to 3m mechanical mixing & mechanical vibration but excluding of centering and shuttering required for proper completion of work includind cost of all material, T&P,Labour etc. | 1,000.81 | M³ | 10,500 ₹1,05,08,505 Lowest | 11,000 ₹1,10,08,910 | 11,090 ₹1,10,98,982.9 |
| 4.00 | Laying R.C.C, A-20, M-25 with cement (PPC)coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 10 to 20mm, including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc. | 1,091.52 | M³ | 11,600 ₹1,26,61,632 Lowest | 12,200 ₹1,33,16,544 | 13,000 ₹1,41,89,760 |
| 5.00 | Centering & Shuttering for C.C & R.C.C work with all lead & lift reqired for proper completion of work including cost of all material and scafolding labour, T&P etc | 6,655.88 | M² | 835 ₹55,57,659.8 Lowest | 900 ₹59,90,292 | 950 ₹63,23,086 |
| 6.00 | Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wirw with required for proper completion of work including cost of all material, labour, T&P etc | 98.84 | MT | 74,000 ₹73,14,160 Lowest | 78,000 ₹77,09,520 | 78,500 ₹77,58,940 |
| 7.00 | Supply and laying filter material coarse sand. | 39.5 | M3 | 6,150 ₹2,42,925 Lowest | 6,300 ₹2,48,850 | 6,500 ₹2,56,750 |
| 8.00 | Supply and laying filter material (4.75 to 10.00 mm )stone grit. | 39.5 | M3 | 6,200 ₹2,44,900 Lowest | 6,300 ₹2,48,850 | 6,500 ₹2,56,750 |
| 9.00 | Supply and laying filter material (10.00 to 20.00 mm) stone grit. | 39.5 | M3 | 7,000 ₹2,76,500 Lowest | 7,100 ₹2,80,450 | 7,500 ₹2,96,250 |
| 10.00 | S/L local sand for making subgrade with proper compaction and dressing including all material, labour, T&P etc. required for proper completion of work. | 237.01 | M3 | 1,750 ₹4,14,767.5 Lowest | 1,900 ₹4,50,319 | 1,950 ₹4,62,169.5 |
Tender Value
Refer Docs
EMD Value
₹12.1 L
Closing Date
21 Aug 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer, Rapti Nahar Nirman Mandal-2, Basti (U.P.)
Protection Work of escape at Km. 86.950 of Rapti Main Canal in district Balrampur.
2026_UPIDC_1175833_2
Tender Notic 02/SE/2026-27
Open Tender
Civil Works
Item Wise
180 days
Balrampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,614
₹12.1 L
27 Oct 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in filling in all types of soil including all leads, lifts and proper disposal and back filling as per direction of E/I including cost of T&P & labour etc required for proper completion of work. | 9,404.76 | M³ | - | - |
| 2 | E/W in excavation of foundation in all type of soil including initial lead up to 30m & lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge required for proper completion of work including cost of all T&P,Labour etc. | 3,680.1 | M³ | - | - |
| 3 | Laying P.C.C, A-20, M-15 in foundation with cement (PPC),coarse sand of F.M not less then 2.00 and crushed hard stone ballast (10-20mm size) including lead up 60m lift up to 3m mechanical mixing & mechanical vibration but excluding of centering and shuttering required for proper completion of work includind cost of all material, T&P,Labour etc. | 1,000.81 | M³ | - | - |
| 4 | Laying R.C.C, A-20, M-25 with cement (PPC)coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 10 to 20mm, including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc. | 1,091.52 | M³ | - | - |
| 5 | Centering & Shuttering for C.C & R.C.C work with all lead & lift reqired for proper completion of work including cost of all material and scafolding labour, T&P etc | 6,655.88 | M² | - | - |
| 6 | Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wirw with required for proper completion of work including cost of all material, labour, T&P etc | 98.84 | MT | - | - |
| 7 | Supply and laying filter material coarse sand. | 39.5 | M3 | - | - |
| 8 | Supply and laying filter material (4.75 to 10.00 mm )stone grit. | 39.5 | M3 | - | - |
| 9 | Supply and laying filter material (10.00 to 20.00 mm) stone grit. | 39.5 | M3 | - | - |
| 10 | S/L local sand for making subgrade with proper compaction and dressing including all material, labour, T&P etc. required for proper completion of work. | 237.01 | M3 | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
ScapeBidLot-2.pdf
Tender Documents • 1.02 MB
BOQ_2209701.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .