| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-Finance | ₹17.0 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹19.1 LAccepted-Finance | ₹19.1 L | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | MAHARASI ENTERPRISES L2 | BHAGYALAKSHMI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the spalled / distressed RCC and loose particles from the existing concrete including roughening the surface after thorough cleaning, rate including cost of all labour, lead, lift etc., complete. | 1 | M3 | 5,387 ₹6,356.66 | 4,798.96 ₹5,662.77 Lowest |
| 2.00 | Chipping and cleaning the existing damaged plastered surface from walls rate including cost of all labour, lead, lift etc., complete. | 48.25 | M2 | 506.63 ₹597.82 | 449.21 ₹530.07 Lowest |
| 3.00 | Dismantling the existing pressed tiles & weathering course including cost of all materials, labours, lead, lift, curing, etc. complete. | 777.98 | M2 | 44,344.86 ₹52,326.93 | 39,420.25 ₹46,515.9 Lowest |
| 4.00 | Providing RCC 1:1.5:3 using OP/PP cement with 12 to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 1 | M3 | 10,950 ₹12,921 | 9,754.92 ₹11,510.81 Lowest |
| 5.00 | Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete. | 7.95 | M2 | 4,770 ₹5,628.6 | 4,254.68 ₹5,020.52 Lowest |
| 6.00 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete. | 70 | Kg | 7,210 ₹8,507.8 | 6,428.1 ₹7,585.16 Lowest |
| 7.00 | Providing PCC 1:1.5:3 screed concrete using op/pp Cement with 6mm - 10mm HBG metal (machine crushed) including cost of materials, labours, T&P's leads, curing etc., complete. | 0.33 | M3 | 2,712.93 ₹3,201.26 | 2,417.03 ₹2,852.1 Lowest |
| 8.00 | Terrace flooring one course of pressed tiles 200x200x20mm over CM 1:3, 20mm thk. mixed with crude oil 10% by weight of cement and pointing with the same oiled mortar over a bed of 80mm thick concrete broken brick jelly 20mm size in pure slaked lime with required slope over RCC roof slab including cost of all materials, labours, lead, lift, curing, etc. complete. | 811.8 | M2 | 12,14,452.8 ₹14,33,054.3 | 10,82,048.22 ₹12,76,816.9 Lowest |
| 9.00 | Removing the existing damaged felt and cleaning the surface free from oil, dust, dirt, grease etc and transporting the debries with 1km lead away from the site and lowering from the surface with water till the saturation for the entire area rate including labour, lead, lift, etc., complete. | 11 | M2 | 1,595 ₹1,882.1 | 1,421.86 ₹1,677.79 Lowest |
| 10.00 | Providing water proof treatment over the existing roof slab with polymeric asphalt membrane sheet (4kg/m2) constituting 7 layers with thermo fusible HM HDFE film one at top and other of bottom layer of this polymeric mix on 1 layer of fibre glass tissue , 2 layers of polymeric mix on the top and bottom of 90 microns HM HDPE film , cracks on roof slab to be filled with cement based filter based filter,laying of PAM sheets over a coating of 90/15 hot blown bitumen with 100 mm overlap sealed by LPG flame torch further coated with oxides bitumen 90/15 and finally coated with aluminium coating and also extra attention should be given in roof /drain curve portion as per instruction of site engineer including cost of all labour, lead, lift T&P etc., complete. | 11 | M2 | 7,623 ₹8,995.14 | 6,787.11 ₹8,008.79 Lowest |
Tender Value
Refer Docs
EMD Value
₹15,300
Closing Date
23 Jul 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Repair and Maintenance Work at 19.50m level Roof Top and Power House South side Wall of Unit 2
2026_EB_686579_1
CE SE C TTPS Spec.No. 88 26 27
Open Tender
Civil Works - Others
Item Rate
60 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,300
Yes
27 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the spalled / distressed RCC and loose particles from the existing concrete including roughening the surface after thorough cleaning, rate including cost of all labour, lead, lift etc., complete. | 1 | M3 | 78.6 | ₹78.6 |
| 2 | Chipping and cleaning the existing damaged plastered surface from walls rate including cost of all labour, lead, lift etc., complete. | 48.25 | M2 | 38.5 | ₹1,857.63 |
| 3 | Dismantling the existing pressed tiles & weathering course including cost of all materials, labours, lead, lift, curing, etc. complete. | 777.98 | M2 | 5,155.5 | ₹40,10,875.89 |
| 4 | Providing RCC 1:1.5:3 using OP/PP cement with 12 to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 1 | M3 | 470.9 | ₹470.9 |
| 5 | Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete. | 7.95 | M2 | 9,007.3 | ₹71,608.03 |
| 6 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete. | 70 | Kg | 90.5 | ₹6,335 |
| 7 | Providing PCC 1:1.5:3 screed concrete using op/pp Cement with 6mm - 10mm HBG metal (machine crushed) including cost of materials, labours, T&P's leads, curing etc., complete. | 0.33 | M3 | 5,533.1 | ₹1,825.92 |
| 8 | Terrace flooring one course of pressed tiles 200x200x20mm over CM 1:3, 20mm thk. mixed with crude oil 10% by weight of cement and pointing with the same oiled mortar over a bed of 80mm thick concrete broken brick jelly 20mm size in pure slaked lime with required slope over RCC roof slab including cost of all materials, labours, lead, lift, curing, etc. complete. | 811.8 | M2 | 284.1 | ₹2,30,632.38 |
| 9 | Removing the existing damaged felt and cleaning the surface free from oil, dust, dirt, grease etc and transporting the debries with 1km lead away from the site and lowering from the surface with water till the saturation for the entire area rate including labour, lead, lift, etc., complete. | 11 | M2 | 277 | ₹3,047 |
| 10 | Providing water proof treatment over the existing roof slab with polymeric asphalt membrane sheet (4kg/m2) constituting 7 layers with thermo fusible HM HDFE film one at top and other of bottom layer of this polymeric mix on 1 layer of fibre glass tissue , 2 layers of polymeric mix on the top and bottom of 90 microns HM HDPE film , cracks on roof slab to be filled with cement based filter based filter,laying of PAM sheets over a coating of 90/15 hot blown bitumen with 100 mm overlap sealed by LPG flame torch further coated with oxides bitumen 90/15 and finally coated with aluminium coating and also extra attention should be given in roof /drain curve portion as per instruction of site engineer including cost of all labour, lead, lift T&P etc., complete. | 11 | M2 | 87.7 | ₹964.7 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_825310.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].