Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC 182 SRINIVASAGAM NAGAR A COLONY VM CHATRAM TIRUNELVELI 627 011 | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627011 | ₹4.1 L | L1 | Accepted-AOC Accepted |
| Sl No | Description | Qty | Unit | P VIJAYA L1 |
|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with an initial lead and lift in sand silt or other loose soil wet sand or silt not under water light block cotton soil sand nordinary soil including excavated earth including all cost and conveyance etc complete With as per the standard specification. | 26 | m3 | 195 ₹5,070 |
| 2.00 | Plain cement concrete of mix 1:4:8 using 40mm ISS metal from the apporoved quarry including cost and convence of the materials to site and all the labour charges etc, complete as per the standard specification | 7 | m3 | 4,941 ₹34,587 |
| 3.00Providing steel centering for sides and soffits of cement concrete works including necessary arrangements with strutting for plain surfaces with props, With all cost and conveyance of materials and labour at site etc ., Complete as per standard specfication. | ||||
| 4.00 | For Drain Wall | 45 | m2 | 309 ₹13,905 |
| 5.00 | For Culvert Slab | 18 | m2 | 650 ₹11,700 |
| 6.00 | Supplying , fabricating and placing in position of MS or RTS rods for cutting, bending, straightening of rods and tying the grills for reinforcementwith necessary binding wire including all cost and conveyance of materials to site with all labour cost ect.,complete as per standard specification. | 1,600 | Kg | 90 ₹1.4 L |
| 7.00 | plain cement concrete 1:1.5:3 (one part of cement, one and half part of Crushed sand (M-Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 5 | m3 | 6,940 ₹34,700 |
| 8.00 | Providing and laying in position standardized concrete Mix M-20 Grade (design mix) in accordance with IS 456-2000 using 20mm and below graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without impairing strength and durability with about (5.0cum), 7730kg of 20mm machine crushed stone jelly and with about (3.3cum), 5156kg of 10 – 12mm machine crushed stone jelly and with about (4.79cum) 7670kg of Q.dust, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers – The Coarse and Fine aggregates to be used should comply with the requirements of IS Standards. | 13 | m3 | 7,860 ₹1.0 L |
Tender Value
₹4.2 L
EMD Value
₹4,150
Closing Date
9 Sept 2025, 3:00 pmClosed
COMMISSIONER
1 Sn High Road Tirunelveli Municipal Corporation
Construction of R.C.C Culvert at Tuckarammalpuram Reddiyarpatti road Entrance in ward no.51
2025_MAWS_596654_40
24/2025-26
Open Tender
Civil Works
90 days
1 Sn High Road Tirunelveli Municipal Corporation
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹4,150
1 Sn High Road Tirunelveli Municipal Corporation
5 Jun 2026
26 Aug 2025
9 Sept 2025
26 Aug 2025
9 Sept 2025
26 Aug 2025
2 Sept 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_714435.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid