| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-Finance | ₹15.8 L | L1 | Accepted-Finance Admitted |
| 2 | L2₹15.9 LAccepted-Finance | ₹15.9 L | L2 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | Sanjay Contractor L2 | DEEPA CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.001. Construction of Plastic Waste Management Unit at Veppanapalli H/o. Veppanapalli. Estimate Amount: Rs. 16.00 lakhs | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 17.48 | Cum | 247.26 ₹4,322.1 | 246.27 ₹4,304.8 Lowest |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 11.29 | Cum | 5,170.1 ₹58,370.43 | 5,149.49 ₹58,137.74 Lowest |
| 4.00 | Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush | 14.54 | Cum | 5,602.11 ₹81,454.68 | 5,579.76 ₹81,129.71 Lowest |
| 5.00 | Supplying and filling in foundation and basement with filling sand including water consolidating etc., | 3.01 | Cum | 1,578.88 ₹4,752.43 | 1,572.59 ₹4,733.5 Lowest |
| 6.00 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick | 13.52 | Cum | 42.98 ₹581.09 | 42.81 ₹578.79 Lowest |
| 7.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 15.93 | Cum | 5,934.45 ₹94,535.79 | 5,910.78 ₹94,158.73 Lowest |
| 8.00 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., | 14.75 | Sqm | 518.05 ₹7,641.24 | 515.98 ₹7,610.71 Lowest |
| 9.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.25 | Mt | 90,153.15 ₹22,538.29 | 89,793.62 ₹22,448.41 Lowest |
| 10.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 1.87 | Cum | 8,964.11 ₹16,762.89 | 8,928.36 ₹16,696.03 Lowest |
Tender Value
₹16 L
EMD Value
₹16,000
Closing Date
22 Aug 2025, 3:00 pmClosed
The Block Development Officer, Veppanapalli
The Block Development Officer, Veppanapalli
Krishnagiri District, Veppanapalli Block, SBM (G) Phase II 2025-2026, Construction of Plastic Waste Management Unit at Veppanapalli H/o. Veppanapalli. Package No. 2025-2026-VNPI-21
2025_RDTN_592300_1
ROC_NO_56_2025_R5_17_05_2025
Open Tender
Civil Works
Item Rate
Veppanapalli
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹16,000
The Block Development Office, Veppanapalli
25 Aug 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
18 Aug 2025
Amount
1. Construction of Plastic Waste Management Unit at Veppanapalli H/o. Veppanapalli. Estimate Amount: Rs. 16.00 lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush
Supplying and filling in foundation and basement with filling sand including water consolidating etc.,
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Supply and Cost of Steel door , Window, including all charges etc.. Complete
Door (1.80m x 2.05m)
Window (1.80m x 1.30m)
Labour Charges for Fixing of Steel doors, windows
Window
Supply and Fixing of Steel Truss with standard specification including all charges etc complete.
75mmx50mm Rectangular Section
Vertical 50x50mm Square Section
Supply and Fixing of Roofing with best quality Tuflon sheet including cost and conveyace of all materials to work site complete. Roof Top
Provision for Electrification Arrangements
Light Point SD no. 20
Street Light fitting SD no: 94
Tube Light SD 88
Plug Point SD No: 36
Shredder Machine Dimension LxWxH (mm) : 1150*1100*1700 Grinder Model 24" Length working Area 610*350mm Motor Power 20 HP Moving Blade : 18 Nos, Fixed Baldes : 4 Nos Blade Material HcHcr including GST 18 %
Dust Removal Machine Dimension - 12500*2550*1350 (mm) Drum Dia - 915 mm Perforated Casting Drum Length - 2100mm Motor power - 15HP Heavy frame structure Eletric Control panel Including GST 18 %
Name Board Charges
Photographic Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sanjay Contractor (BID ID -1436641)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].