Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28.8 LAccepted-Finance | ₹28.8 L | 1 | Accepted-Finance Being L1 |
| 2 | 2₹30.4 L+₹1.6 L (5.49%)Accepted-Finance | ₹30.4 L+₹1.6 L (5.49%) | 2 | Accepted-Finance Being L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹27.8 L
EMD Value
₹55,530
Closing Date
10 Jul 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer, CD-I, APWD, Rangat
Restoration of toe wall cum drain at various stretches in between Ch. 2262.3100 for protection of rural road Adazig, Flatbay, Baratang.
2026_APWD_23472_1
13/DB/CD-I/RGT/2025-26
Open Tender
Civil Works - Others
Percentage
60 days
Adazig
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹55,530
15 Jul 2026
23 Jun 2026
10 Jul 2026
23 Jun 2026
10 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.1 | All kinds of soil. | 135.04 | cum | 334.7 | ₹45,197.89 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. | 47.44 | cum | 179.1 | ₹8,496.5 |
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 3.1 | 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 26.47 | cum | 10,793.85 | ₹2,85,713.21 |
| 3.2 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 120.75 | cum | 13,228.7 | ₹15,97,365.53 |
| 4Centering and shuttering including strutting, propping etc. and removal of form for | |||||
| 4.1 | Foundations, footings, bases of columns, etc. for mass concrete | 166.2 | sqm | 405.1 | ₹67,327.62 |
| 4.2 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 474.4 | sqm | 826.5 | ₹3,92,091.6 |
| 512 mm cement plaster of mix: | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
TenderDocument.pdf
Tender Documents • 16.27 MB
BOQ_24880.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .