Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAdmitted-Finance DOOR NO 57 28 10 4 2 BHAVANI GARDENS INDUSTRIAL ESTATE POST VISAKHAPATNAM 530 007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | L1 | Admitted-Finance | |
| 2 | L2₹32.2 L+₹6.1 L (23.4%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹39.3 L+₹13.2 L (50.6%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹45.2 L+₹19.1 L (73.2%)Admitted-Finance NO 98 1 1C YOJANANAGAR LOHEGAON WAGOLI ROAD NEAR SIVBHA DARBAR HOTEL LOHEGAON PUNE 411047 | PUNE | PUNE | MAHARASHTRA | 411047 | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S.R.M.K Enterprises L4 | harshraj and co L3 | Krithi constructions L2 | B SRINIVAS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Taking down Plastering of Cement Mortar on Brick or Stone Wall / Concrete Surface / Ceilings etc including racking out joints hacking for key scrubbing down with water etc.complete all as specified | 2,300 | SQM | 50 ₹1,15,000 | 20 ₹46,000 | 10.75 ₹24,725 Lowest | 15 ₹34,500 |
| 2.00 | M&L Rendering 10 mm thick in CM (1:4) incl finishing even and smooth without using extra cement on Internal Faces.complete all as specified | 800 | SQM | 280 ₹2,24,000 | 180 ₹1,44,000 | 39 ₹31,200 Lowest | 200 ₹1,60,000 |
| 3.00 | M&L for Rendering 5mm thick in CM 1:3 finishing even and smooth without using extra cement on Ceilingcomplete all as specified | 300 | SQM | 200 ₹60,000 | 180 ₹54,000 | 63 ₹18,900 Lowest | 200 ₹60,000 |
| 4.00 | M&L for Rendering 15mm thick cement plaster 1:6, incl finishing even and smooth without using extra cement on External Faces with WPC @ 3.0 kg by weight of cement. (Note : The Quoted Rate shal be included for Work to be carried out from Ground Floor to Fourth Floor of Bldg Height with all nessary Scaffolding and WPC Compound).complete all as specified | 1,200 | SQM | 300 ₹3,60,000 | 200 ₹2,40,000 | 65 ₹78,000 Lowest | 200 ₹2,40,000 |
| 5.00 | M&L for preparation of Newly plastered surfaces of Walls / Ceiling and applying cement based putty of 3 mm thickness over plastered surface and applying Two Coat of Oil Emulsion Distemper over a coat of primer complete all as specified and directed by Engr-in-Charge.(Note : Quoted rate shall be included for Work to be carried out from Ground Floor to Fourth Floor of Bldg Height with all nessary Scaffolding and The Paint Strains on Wall / Floor / Joinery / Glass / Wire Mesh / Furnituers shall be cleaned to the satisfaction of Engineer-in-Charge)(MAKE - Asian, Berger, JSW Paint) | 1,100 | SQM | 80 ₹88,000 | 100 ₹1,10,000 | 45 ₹49,500 Lowest | 80 ₹88,000 |
| 6.00 | M&L for preparation of Newly plastered surfaces of Walls and applying Two Coat of Cement Base Paint over a coat of primer, complete all as specified and directed by Engr-in-Charge.(Note : Quoted rate shall be included for Work to be carried out from Ground Floor to Fourth Floor of Bldg Height with all nessary Scaffolding and The Paint Strains on Wall / Floor / Joinery / Glass / Wire Mesh / Furnituers shall be cleaned to the satisfaction of Engineer-in-Charge)(MAKE - Asian, Berger, JSW Paint) | 480 | SQM | 60 ₹28,800 | 100 ₹48,000 | 28 ₹13,440 Lowest | 50 ₹24,000 |
| 7.00 | M&L for preparation of Newly plastered surfaces of Walls / Ceiling incl pillar etc.and applying Two or More Coats of 100% Premium Acrylic Emulsion (weather proof) paint having VOC less than 100 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over wall surfaces including cutting opening all cracks & filling the cracks with crack filler material complete all as specified and directed.(Note : Quoted rate shall be included for Work to be carried out from Ground Floor to Fourth Floor of Bldg Height with all nessary Scaffolding and The Paint Strains on Wall / Floor / Joinery / Glass / Wire Mesh / Furnituers shall be cleaned to the satisfaction of Engineer-in-Charge)(MAKE - Asian, Berger, JSW Paint) | 720 | SQM | 150 ₹1,08,000 | 135 ₹97,200 | 95 ₹68,400 | 90 ₹64,800 Lowest |
| 8.00 | M&L for Up Rooting of Vegetation Growth, Shurbs, Small Plants and Small Trees of any Size / Girth from Walls, Roof, Chajja, Shaft etc Building Height up to Four Storey at any location and position of bldg, completely including roots and making good the disturbed surfaces, cleaning the surfaces and filling the disturbed surace with type B0 PCC 1:2:4 (12.5mm Aggregate) and Rendered 15mm thick in CM (1:3) with WPC @ 3.0 kg by weight of cement, Area of Each disturbed surfaces n exc 0.50 Sqm and finishing the surface to match the existing finishes of building complete all as specified and directed by Engr-in-Charge. (Note : The Quoted Rate shal be included for Work to be carried out from Ground Floor to Fourth Floor of Bldg Height with all nessary Scaffolding, Form Work and WPC Compound). | 200 | EACH | 50 ₹10,000 Lowest | 250 ₹50,000 | 60 ₹12,000 | 50 ₹10,000 Lowest |
| 9.00 | M&L for preparation of old painted surfaces of Brick Wall, Stone Wall, Concrete Wall and any surfaces of any description not otherwise described, over 10cm width or girth and applying Two Coat of Smartcare Anti- Dampness and Efflorescence Paint , complete all as specified and directed by Engr-in-Charge. (Note : Quoted rate shall be included for Work to be carried out from Ground Floor to Fourth Floor of Bldg Height with all nessary Scaffolding and The Paint Strains on Wall / Floor / Joinery / Glass / Wire Mesh / Furnituers shall be cleaned to the satisfaction of Engineer-in-Charge)(MAKE - Asian, Berger, JSW Paint) | 500 | SQM | 350 ₹1,75,000 | 130 ₹65,000 | 40 ₹20,000 Lowest | 70 ₹35,000 |
| 10.00 | M&L for preparation of old decorated surfaces of Walls and cornices, spoiled by smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots by scraping including filling Holes / Gap / Cracks with cement base putty and applying One Coat of Oil Emulsion Distemper, complete all as specified and directed by Engr-in-Charge. (Note : Quoted rate shall be included for Work to be carried out from Ground Floor to Fourth Floor of Bldg Height with all nessary Scaffolding and The Paint Strains on Wall / Floor / Joinery / Glass / Wire Mesh / Furnituers shall be cleaned to the satisfaction of Engineer-in-Charge)(MAKE - Asian, Berger, JSW Paint) | 8,000 | SQM | 40 ₹3,20,000 | 30 ₹2,40,000 | 35 ₹2,80,000 | 25 ₹2,00,000 Lowest |
Tender Value
₹42.6 L
EMD Value
₹85,200
Closing Date
2 Jun 2026, 6:00 pmClosed
GE MCEME SECUNDERABAD
GARRISON ENGINEER MCEME, MCEME CAMPUS, TRIMULGHERRY (POST) SECUNDERABAD - 500015
REPAIRS OF PLASTER CRACK FILLING PERIODICALS AND UPKEEPING OF BLDGS UNDER ZONE II AREA OF MCEME UNDER GE MCEME SECUNDERABAD
2026_MES_763686_1
8757/E8
Open Tender
Civil Works
Item Rate
180 days
SECUNDERABAD
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE MCEME SECUNDERABAD
₹85,200
Yes
9 Jun 2026
6 May 2026
4 Jun 2026
6 May 2026
2 Jun 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down Plastering of Cement Mortar on Brick or Stone Wall / Concrete Surface / Ceilings etc including racking out joints hacking for key scrubbing down with water etc.complete all as specified | 2,300 | SQM | - | - |
| - | M&L Rendering 10 mm thick in CM (1:4) incl finishing even and smooth without using extra cement on Internal Faces.complete all as specified | 800 | SQM | - | - |
| - | M&L for Rendering 5mm thick in CM 1:3 finishing even and smooth without using extra cement on Ceilingcomplete all as specified | 300 | SQM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tender8757.pdf
Tender Documents • 0.89 MB
BOQ_855412.xls
BOQ • 2.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .