Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance COAL INDIA LIMITED CIL | +15.00% | ₹2.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.0 L+₹12,601.46 (4.35%)Admitted-Fee/PreQual/Technical/Finance TALHANJA HOUSING COLONY TALHANJA CHIRKUNDA DHANBAD JHARKHAND 828202 | DHANBAD | DHANBAD | JHARKHAND | 828202 | +20.00% | ₹3.0 L+₹12,601.46 (4.35%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.2 L+₹25,202.92 (8.70%)Admitted-Fee/PreQual/Technical/Finance | +25.00% | ₹3.2 L+₹25,202.92 (8.70%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹3,800
Closing Date
26 Jun 2026, 5:00 pmClosed
GM CV AREA
OFFICE OF THE GENERAL MANAGER CV AREA XII
Repair and Maintenance of Drain and Other Miscellaneous Civil Works at Railway Siding under C.V. Area.
2026_BCCL_361073_1
BCCL/XII/ACE/ e-Tender-12/2026-27/12 Date-13.06.2026
Open Tender
Civil Works - Others
Percentage
24 days
CV AREA
Please refer to the tender document.
3 documents required · 3 mandatory
₹3,800
29 Jun 2026
15 Jun 2026
27 Jun 2026
15 Jun 2026
26 Jun 2026
16 Jun 2026
15 Jun 2026 - 19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EARTH WORK Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. + EARTH WORK Extra rates for quantities of works, executed: In or under water and/or liquid mud, including pumping out water as required | 258.53 | CUM | 256.98 | ₹66,435.75 |
| 2 | CONCRETE WORK Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.87 | CUM | 5,592.8 | ₹16,045.74 |
| 3 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in Foundation and upto plinth level | 11.39 | CUM | 5,107.76 | ₹58,151.85 |
| 4 | FINISHING 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand) | 82.5 | SQM | 288.25 | ₹23,780.63 |
| 5 | FLOORING Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate | 24.75 | SQM | 442.65 | ₹10,955.59 |
| 6 | Clearing jungle excluding uprooting of rank vegetation ,grass ,brush wood, tree and saplings of girth up to 30 cm measured at a height of 1m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 3,300 | SQM | 7.54 | ₹24,882 |
| 7 | Providing labour on the site for cleaning purposes | 80 | EACH | 647.22 | ₹51,777.6 |
| 8 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.23 MB
BOQ_373948.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .