| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC | L1 | Accepted-AOC Lowest rate codded | |
| 2 | L2₹16.6 L+₹3,339.94 (0.20%)Rejected-Finance | L2 | Rejected-Finance SECOND LOWEST RATE CODED |
Tender Value
₹16.8 L
EMD Value
₹16,800
Closing Date
21 Dec 2023, 3:00 pmClosed
Block Development Offfice (V.P) Kalasapakkam
Block Development Officer(V.Pts.) Kalasapakkam 606751
Construction of New 30,000 Lts. OHT in Kalur ADC Habitation of Kalur Panchayat Under JJM MVS State Savings Fund - 2020-21
2023_RDTN_398608_1
Roc. No.A5/1605/2023Dt. 14.11.2023 TVMKLSP/0317
Open Tender
Civil Works - Water Works
Lump-sum
180 days
KALASAPAKKAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹16,800
28 Dec 2023
12 Dec 2023
21 Dec 2023
12 Dec 2023
21 Dec 2023
12 Dec 2023
Amount
Construction of New 30000 Lts. OHT in Kalur ADC Habitation of Kalur Panchayat in Kalasapakkam Block, Tiruvannamalai District under JJM MVS State Savings Fund - 2020-21
Earth work excavation & depositing on bank with an initial lead of 10 meter & initial lift of 2 meter in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravell soil (SS 20B) for foundation including shoring, stutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges ect., complete and as directed by TWAD board officers
First depth of 2m From 0 to 2 m below GL
In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S.20B
Second depth of 2m From 2m to 4 m below GLFor Column Footing
PCC 1:4:8 (one cement four sand and eight hard granite broken stone of 40 mm size ISS gauge) for fountation and footing including mixing placing ramming finishing curing etc., complete accordance with standard specification and as directed by TWAD Bord officers
RCC mix in M30 grade using 10mm& 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering strutting shuttering but including cost of all materials mixing laying vibrating the concrete with mechanical vibrators, ramming, consolidating finishing etc.complete
Below 1.5m from GL Column footing
0m to 1.50m below GL
0m to 4.50m above GL
4.50 m to 7.32 m above GL
7.32 m to 10.98 m above GL
10.98 m to 14.64 m above GL
14.64 m to 18.30 m above GL
Supply and erection of Steel Centering, Shuttering for soffitsand sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 Stiffened with MS angle of size 25X25X3 mm for boarding laid over I type MS Truss of Size 25X25X3mm about 90cm c/c and supported by 40 mm GI
Column Footing (Plain Surface) Below GL
From GL to 3.30m
From 5.30m to 6.30m above GL
From 8.30m to 9.30m above GL
From 11.30m to 12.30m
Square Column:
Square Column Below GL and upto 3.30m above GL
3.31m to 4.30m ht
4.31m to 5.30m ht
5.31m to6.30m ht
6.31m to 7.30m ht
7.31m to 8.30m ht
8.31m to 9.30m ht
9.31m to 10.30m ht
10.31m to 11.30m ht
11.31m to 12.30m ht
Curved Surface - upto 3.30m ht.
11.30m to 12.30m ht
12.30m to 13.30m ht
13.30m to 14.30m ht
14.30m to 15.30m ht
Supply, fabrication, placing in position of steel rods cutting tying etc. complete including cost of reinforcement RTS rods.
Painting two coatsto the exposed surface of SR using cement paint
Providing M.S Ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30 cm centre to centre etc as per approved design
Providing and fixing of RCC inner access ladder in RCC 1:11/2:3 (One cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc complete
Providing 110mm PVC vent cowl arrangements mosquito proof nylon net and as directed by TWAD Board officers
Providing cut stone slab in CM 1:3 of size 0.3 m x 0.3 m x 0.15 m and as directed by TWAD Board officers
Providing manhole cover of size 0.60 x 0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges and as directed by TWAD Board officers
Provision for pipe connection arrangements for inlet, outlet scour and overflow etc. including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enam
65mm GI pipes for inlet connection
65mm GI pipes for over flow & rain water harvesting pipe
50mm GI pipes for scour pipe
65mm GI pipe for delivery pipe
90mm PVC Threaded coupler
63mm PVC Threaded coupler
65mm dia GI Tee
65mm dia GI bend 90
65mm GI Bend (Short)
65mm GI coupler
65mm GI union
65mm GI Elbow
50mm GI union
50mm GI Elbow
65mm GI Tee
65x50mm GI reducer
75mmx63mm PVC reducer
65mm GM gate valve
50mm GM gate valve
63 mm PVC 4Ksc Pipe
Earthwork excavation and deposition on bank with an initial lead and lift in all classes of soil except hard rock not requiring blasting etc,. Complete as per standard specifications.
Labour charges for laying of 32 mm 6 kg/cm2 Pvc pipe with specials with proper gradient and alignment including all cost etc,. Complete
90 mm 6 KSC Pipe
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers
Labour charges for GI pipe connection to the OHT, for inlet, outlet, overflow and scour arrangements including cutting and threading, earth work excavation & refilling.
Providing Hand rails over the Roof slab by using 32 mm GI Pipe with 40mm x 6mm MS Flat and fixied with 12mm dia Fastner Bolt 75mm long and as directed by TWAD Bd officers
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sarojini Constructions
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .