Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.3 LAccepted-AOC | ₹49.3 L Quoted ₹52,900 | L1 | Accepted-AOC Agreement executed |
| 2 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr Quoted ₹69,600 | L1 | Accepted-AOC Agreement executed |
| 3 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr Quoted ₹57,998 | L1 | Accepted-AOC Agreement executed |
| 4 | L1₹2.0 CrAccepted-AOC | ₹2.0 Cr Quoted ₹55,752 | L1 | Accepted-AOC Agreement executed |
| 5 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr Quoted ₹58,000 | L1 | Accepted-AOC Agreement executed |
| Sl No | Description | Qty | Unit | CYRUS SOLAR ENERGY L19 | GAURAV HITECH COMPANY L26 | GenYself Solar Solutions Pvt. Ltd. L7 | M/S SOLAR INDUSTRIES L21 | APS POWER L25 | Urja Shakti L3 | Ranchi Design & Consultancy Services Pvt. Ltd. L23 | a v enterprises L4 | VAIBHAVI ENGINEERING L1 | VAISHNAVI ENGINEERING L8 | M/S GANGA ENTERPRISES L33 | PRAMOD KUMAR SAHU L28 | Switcher L16 | Mahamaya Enterprises L27 | MS KANCHANTOSH PRASAD CO. L13 | SAMRA SOLAR ENERGY PRIVATE LIMITED L15 | RITESH sHANKAR L31 | TULSYAN ENTERPRISES L6 | M/S JAI MATA DI & CO L2 | M/S NEXTGEN SOLUTIONS L9 | PREETI ENGINEERING L18 | RAVERA ENGINEERING L27 | EMPOWER CONSTRUCTION L32 | SHREE RAM ENTERPRISES L29 | HRIDHAAN ENGINEERING PRIVATE LIMITED L10 | SHREE COLLECTION L28 | SRIJA SALES L12 | SHIV SHAKTI ENTERPRISES L32 | JITENDRA KUMAR L34 | JIGYASU TRADERS L12 | Shri Narayani Powers L22 | MAHADEV ENTERPRISES L11 | SONSOLITE INFRA AND POWER SOLUTIONS PRIVATE LIMITED L20 | M/s MAA TECHNOLOGIES AND SERVICES L14 | SAMRIDDHI ENTERPRISES L12 | SUMIT KUMAR L30 | RAMDEO SINGH LAND CONSTRUCTION & DEVELOPER (OPC) PVT LTD L24 | M/S SHAH & SONS L5 | SONY SOLAR EQUIPMENTS L17 | CHETLAL SARITA INFRASTRUCTURE PRIVATE LIMITED L28 | SRI P.K.S. RIG. SERVICES PRIVATE LIMITED L28 | M/S ALLIANCE ENTERPRISES L36 | LAXMI ASSOCIATES L35 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Rate Contract for Selection of Agencies for Comprehensive Maintenance Contract & Operation (CMCO) of Grid Connected Rooftop Solar Power Plants for Five Years including replacement of PCUs and Batteries and other components as and where required basis at Various Districts in the State of Jharkhand. | ||||||||||||||||||||||||||||||||||||||||||||||
| 1.01 | 1 to 10 kWp (Without Battery System) | 1 | KW | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 1.02 | 10 Above to 30 kWp (Without Battery System) | 1 | KW | - | 42,500 ₹42,500 | - | - | - | - | 36,000 ₹36,000 | - | - | - | - | 30,000 ₹30,000 | - | - | - | - | - | - | - | - | - | - | 48,000 ₹48,000 | 45,500 ₹45,500 | - | 45,000 ₹45,000 | - | 48,000 ₹48,000 | 55,000 ₹55,000 | - | - | - | - | 69,500 ₹69,500 | - | - | 41,900 ₹41,900 | - | - | 45,000 ₹45,000 | 30,000 ₹30,000 | - | - |
| 1.03 | 30 Above to 50 kWp (Without Battery System) | 1 | KW | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 29,890 ₹29,890 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 60,000 ₹60,000 |
| 1.04 | 50 Above to 70kWp (Without Battery System) | 1 | KW | - | - | - | 34,000 ₹34,000 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 40,000 ₹40,000 | - | - | - | - | 44,383 ₹44,383 | - | - | - | - | - | - | - |
| 1.05 | 70 Above to 100Kwp (Without Battery System) | 1 | KW | 39,000 ₹39,000 | - | - | - | - | - | - | - | - | - | - | - | 32,000 ₹32,000 | 49,900 ₹49,900 | - | - | - | - | - | - | - | 49,900 ₹49,900 | - | - | - | - | - | - | - | - | - | - | 35,000 ₹35,000 | - | - | - | - | - | - | - | - | - | - |
| 1.06 | 100Kwp above (Without Battery System) | 1 | KW | - | - | - | - | 48,000 ₹48,000 | - | - | - | - | - | - | - | - | - | - | - | 55,000 ₹55,000 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 1.07 | 1 to 10 kWp (With Battery System) | 1 | KW | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 69,600 ₹69,600 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 85,000 ₹85,000 | - |
| 1.08 | 10 Above to 30 kWp (With Battery System) | 1 | KW | - | 65,500 ₹65,500 | - | - | - | - | 65,000 ₹65,000 | - | 52,900 ₹52,900 | - | - | 80,000 ₹80,000 | - | - | 65,875 ₹65,875 | - | - | - | - | 62,756 ₹62,756 | - | - | 68,000 ₹68,000 | 65,500 ₹65,500 | - | 65,000 ₹65,000 | - | 68,000 ₹68,000 | 68,000 ₹68,000 | - | - | - | - | - | - | - | 63,790 ₹63,790 | 58,623 ₹58,623 | 89,280 ₹89,280 | 65,000 ₹65,000 | 80,000 ₹80,000 | 84,000 ₹84,000 | - |
| 1.09 | 30 Above to 50 kWp (With Battery System) | 1 | KW | - | - | - | - | - | - | - | 57,998 ₹57,998 | - | - | 1,22,000 ₹1.2 L | - | - | - | - | - | - | - | - | - | 64,955 ₹64,955 | - | - | - | 62,900 ₹62,900 | - | 64,100 ₹64,100 | - | - | 64,100 ₹64,100 | - | 62,990 ₹62,990 | - | - | 64,100 ₹64,100 | - | - | - | - | - | - | - | 66,000 ₹66,000 |
Tender Value
Refer Docs
EMD Value
₹6 L
Closing Date
3 Jul 2024, 5:00 pmClosed
Director, JREDA
3rd Floor, SLDC Building, Kusai, Doranda, Ranchi- 834002 (Jharkhand)
Rate Contract for Selection of Agencies for CMCO of Grid Connected Rooftop Solar Power Plants for Five Years including replacement of PCUs and Batteries and other components as and where required basis at Various Districts in the State of Jharkhand.
2024_JREDA_86739_1
06/JREDA/GCRT/CMCO/24-25
Open Tender
Solar Power Plants
60 days
JHARKHAND
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,800
Yes
₹6 L
Yes
Conference Hall of JREDA
14 Dec 2024
19 Jun 2024
5 Jul 2024
19 Jun 2024
3 Jul 2024
22 Jun 2024
20 Jun 2024
Amount
1 to 10 kWp (Without Battery System)
10 Above to 30 kWp (Without Battery System)
30 Above to 50 kWp (Without Battery System)
50 Above to 70kWp (Without Battery System)
70 Above to 100Kwp (Without Battery System)
100Kwp above (Without Battery System)
1 to 10 kWp (With Battery System)
10 Above to 30 kWp (With Battery System)
30 Above to 50 kWp (With Battery System)
50 Above to 70kWp (With Battery System)
70 Above to 100Kwp (With Battery System)
100Kwp above (With Battery System)
M/S JAI MATA DI & CO
Urja Shakti
a v enterprises
M/S SHAH & SONS
TULSYAN ENTERPRISES
GenYself Solar Solutions Pvt. Ltd.
VAISHNAVI ENGINEERING
M/S NEXTGEN SOLUTIONS
HRIDHAAN ENGINEERING PRIVATE LIMITED
MAHADEV ENTERPRISES
SAMRIDDHI ENTERPRISES
JIGYASU TRADERS
SRIJA SALES
MS KANCHANTOSH PRASAD CO.
M/s MAA TECHNOLOGIES AND SERVICES
SAMRA SOLAR ENERGY PRIVATE LIMITED
Switcher
SONY SOLAR EQUIPMENTS
PREETI ENGINEERING
CYRUS SOLAR ENERGY
SONSOLITE INFRA AND POWER SOLUTIONS PRIVATE LIMITED
M/S SOLAR INDUSTRIES
Shri Narayani Powers
Ranchi Design & Consultancy Services Pvt. Ltd.
RAMDEO SINGH LAND CONSTRUCTION & DEVELOPER (OPC) PVT LTD
APS POWER
GAURAV HITECH COMPANY
Mahamaya Enterprises
RAVERA ENGINEERING
CHETLAL SARITA INFRASTRUCTURE PRIVATE LIMITED
SRI P.K.S. RIG. SERVICES PRIVATE LIMITED
PRAMOD KUMAR SAHU
SHREE COLLECTION
SHREE RAM ENTERPRISES
SUMIT KUMAR
RITESH sHANKAR
EMPOWER CONSTRUCTION
SHIV SHAKTI ENTERPRISES
M/S GANGA ENTERPRISES
JITENDRA KUMAR
LAXMI ASSOCIATES
M/S ALLIANCE ENTERPRISES
stage.html
html • 0.24 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid