Loading…
Loading…
Tender Value
₹11.3 Cr
EMD Value
₹22.5 L
Closing Date
15 Sept 2026, 3:00 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
WORK HQ
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-C, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.(As per Railway Board letter no. 2022/CE-I/CT/GCC-2022/Policy, dated 14-07-2022)
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited : Three similar works costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works costing not less than the amount equal to 40% of advertised value of the tender, or One similar work costing not less than the amount equal to 60% of advertised value of the tender. [As per Annexure -B attached in tender document] (Full details para 10.1 in tender documents)
Defination of Similar Work :- Welding of rails with Mobile Flash Butt Welding Plant.
42 conditions · 9 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please submit your bank details i.e. Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, GST, PAN Number, Adhar Number, Mobile Number and e-mail address.
Please furnish list of personnel, organization available on hand and proposed to be engaged for the subject work. [As per Annexure -D attached in tender document]
Please furnish list of plant and Machinery available on hand own and proposed to be inducted own and hired to be given separately for the subject work.[As per Annexure - E attached in tender document]
Please furnish list of Works completed in last Seven years (Ending last day of month previous to the one in which tender is invited) giving Description of Work, Organization for whom executed, approximate value of contract at time of award, Date of award and Date of Completion. Date of actual Start, Actual Completion and Final value of Contract shall also be given. [As per Annexure F attached in tender document]
Please furnish list of Works on hand indicating Description of Work, Contract Value, Approximate value of balance work yet to be done and Date of award. [As per Annexure -G attached in tender document]
The tenderers shall submit a copy of certificate stating that all their statements/documents submitted along with bid are true and factual. Standard format of certificate to be submitted by the bidder is enclosed as Annexure-V(A). In case of other than Company/Proprietary firm, Annexure -V(A) shall also be submitted by the each member of a Partnership Firm/Joint Venture (JV)/Hindu Undivided Family (HUF/Limited Liability Partnership (LLP) etc, as the case may be. Non submission of above certificate by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested/digitally signed by which they/he are/is qualifying the Qualifying Criteria mentioned in the Tender Document. [As per Annexure-V(A) attached in tender document].
Upload Scanned receipt copy of payment of Bid Security through net banking or payment gateway or in case of submission of Bid Security in the form of Bank Guarantee. Full details para 5.0 of GCC-April 2022.
At the time of submission of bid, if you have any special Condition then upload in scanned pdf copy.
Tenderer has to submit latest partnership deed with an affidavit that above partnership deed is correct in all respect and is latest [As per Annexure-L attached in tender document].
The Bid Security deposited with the tender of successful tenderer will be retained as part of security deposit which will be 5 percent of the value of work awarded. The balance amount of security deposit will recovered on account bills of the work @ 6 percent till it reaches up to 5 percent of the value including Bid Security.
The Railway Reserve the right to accept in whole or in part or reject any tender or all tenders without assigning any reason for such action. Rate should not be quoted for part quantity.
For those conditions for which standard formats have been given in the uploaded document titled-Formats for uploading of various format. The information's should only be submitted in these standard formats.
Rates are inclusive of all taxes/royalty charges etc. legally leviable by State, Central Govt. or any other local authority.
Goods and Services Tax (GST) will be recovered as per extant instruction on the subject.
Performance Guarantee :-(a)The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty one) days, i.e. from 22nd day after the date of issue of LOA. Further, if the 60th day happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in re-tender for that work.
(b)The successful bidder shall submit the Performance Guarantee (PG) in any of the following forms, amounting to 5% of the original contract value: (i)A deposit of Cash; (ii) Irrevocable Bank Guarantee; (iii) Government Securities including State Loan Bonds at 5% below the market value; (iv) Pay Orders and Demand Drafts tendered by any Scheduled Commercial Bank of India; (v)Guarantee Bonds executed or Deposits Receipts tendered by any Scheduled Commercial Bank of India; (vi) Deposit in the Post Office Saving Bank; (vii) Deposit in the National Savings Certificates; (viii)Twelve years National Defence Certificates; (ix) Ten years Defence Deposits; (x)National Defence Bonds and (xi) Unit Trust Certificates at 5% below market value or at the face value whichever is less. Also, FDR in favour of FA & CAO, NER (free from any encumbrance) may be accepted.
The tenderer shall upload scanned copies of mandatory credentials such as experience, Payment Certificates and any other documents as applicable.
Offer submission period :- Fifteen days prior to opening of tender, during which tenderers can submit their offer.
(a)One qualified Graduate Engineer where the cost of the work to be executed is Rs.200 lakh and above. (b)One qualified Diploma Holder Engineer where the cost of the work to be executed is more then Rs.25 lakh, but less then Rs.200 lakh. Technical staff should be available at site whenever required by the Engineer-in- charge to take instructions. In case the contractor fails to employ the qualified Engineer, he shall be liable to pay amount of Rs.40000 and Rs.25000 for each month or part thereof for the default period for the provisions, as contained in para (a) and (b) above respectively. The decision of the Engineer-in-charge as to the period for which the required technical staff was not employed by the contractor and as to the reasonableness of the amount to be deducted on this account shall be final and binding on the contractor.
Bank Guarantees BGs to be submitted by suppliers/contractors should be sent directly to the concerned authorities by issuing Bank under registered Post A.D
(1) Price Variation Clause (PVC) shall be applicable only in tender having advertised value above Rs. 2 Crores. The conditions will be follow with up-to-date correction slips (As per Railway Board letter no. 2022/CE-I/CT/GCC-2022/Policy, dated 14-07-2022). (2) Price Variation Clause for Annual Maintenance Contract or Zonal Contract :- The price variation Clause of General Conditions of Contract shall not apply to a works contract which is either an Annual Maintenance Contract or a Zonal Contract as per Railway Boards letter No.2013/CE/I/CT/O/10-PVC-Pt.I DT. 27.01.2015. (3) Price Variation Clause shall be applicable accordingly attached document.
(a)(i)Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer.
For all details of General Condition, Please See uploaded Tender Document and GCC-April-2022.
Care in Submission of Tenders :
(a)(i)Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer.
(a)(ii)Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/ Integrated Goods and Services Tax Act, 2017(IGST)/ Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified by Central/State Govt. & as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
(a)(iii)The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the Contractor. The Contractor shall be responsible for deposition of applicable GST to the concerned authority.
(a)(iv)In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/ SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
(b)When work is tendered for by a firm or company, the tender shall be signed by the individual legally authorized to enter into commitments on their behalf.
(c)The Railway will not be bound by any power of attorney granted by the tenderer or by changes in the composition of the firm made subsequent to the execution of the contract. It may, however, recognize such power of attorney and changes after obtaining proper legal advice, the cost of which will be chargeable to the Contractor.
For all details of General Condition, Please See uploaded Tender Document and GCC-April-2022.
Flash Butt Weld at Kasganj-Bhojipura-Lalkuan section for TTR-87 Set and TRR(P)- 64.00 Km in Bhojipura-Lalkuan section in the jurisdiction of ADEN/LINE IZN under [sanction work of Kasganj-Bhojipura-Lalkuan and Bhojipura-Mailani TTR (FS+TWS+WCMSC) 119 set and Bhojipura-Lalkuan TRR(P)-64.00 Km.]
NER-IZN-2026-150~NER
NER-IZN-2026-150
Open
Works - General
12 Months
Gorakhpur, Uttar Pradesh
₹0
₹22.5 L
21 Aug 2026
21 Aug 2026
1 Sept 2026
3 items across 1 schedule · ₹11,26,64,342.84 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Flash butt welding of all type of 20 rail panels (60Kg or higher, new/in service) at site using contractor's own mobile flash butt welding plant & other equipment's,machineries, tools plants, accessories, consumables, materials, labour etc. complete as per following details- In case of welding by mobile flash butt welding plant in-situ or on Cess, the rate quoted should include earthwork in formation with contractor's own earth including dressing of slopes embankment, leading cut soils to a location/ locations as directed by the Engineer or authorized representatives for stabling and working of the mobile flash butt welding plant, making/cutting of existing/new rail panels flash butt welding under traffic block, cutting existing rails at the joints so as to remove heat affected zone/fish bolt holes under traffic block, Flash butt welding of rails including insertion closer rails with fittings for movement of trains after traffic block etc. complete in all respect. The rate quoted should also include strengthening of rails, matching rail ends, preparation of aligning, positioning, stripping rail joints, grinding and finishing of joints, USFD testing of flash butt weld/AT welded joints, segregating defective rails, post strengthening of joints, handling/leading of rails/rail panels, removing and refixing off fitting /fastening, necessary lifting, pulling, handling of rail panels, adjustment of welding gap as required, loosening, tightening, removal, re-fixing, fittings, fastenings, mobilization of flash butt welding plant with contractors own labour,machinery, tools, plants etc. with all lead, lift, descent, royalty, taxes etc. complete in respects per direction of Engineer or authorized representatives. The cut rails shall have to be returned to PWI depot by contractor at his own cost. The contractor at own cost has to establish equality control organization to ensure adequate control at stages . Unless otherwise superseded by stipulations of this contract, the welding process, all flash butt welding related activities and methodology will be governed by "Manual for flash butt welding of rails (April 2022)"with up to date correction slips issued Research Design and Standard Organization((RDSO) Ministry Of Railways Lucknow.- For 20 rail panels. | Each 1098.00 and a) of his for of of pre of all of all his the his all the the by | — | 87,775.82 | 9,63,77,850.36 |
| 2 | Flash butt welding of 60 Kg or higher, new/in service rails using road-cum-rail mobile and / stationary flash welding plants as per following details :- a) In caseof welding by mobile flash butt welding plant in-situ or on Cess, the rate quotedshould include earthwork in formation with contractors own earth including dressing slopes of embankment, leading cut soils to location/ locations as directed by the Engineer his authorized representative for stabling working of the mobile flash butt welding plant, making/cutting of new rails for flash butt welding, cutting of existing rails at the joints as to remove heat affected zone/fish bolt holes under traffic block, Flash welding of rails including insertion of closer rails with fittings movement of trains after traffic block complete in all respect. The rate quoted should also include pre strengthening of rails matching rail ends, preparation of aligning, positioning, stripping of rail joints, grinding and finishing joints, USFD testing of flash butt weld/AT welded joints, segregating defective rails, post strengthening of joints, handling/leading rails/rail panels, removing and refixing fitting/fastening, all necessary lifting, pulling, handling of rail panels, adjustment of welding gap as required, loosening, tightening, removal, re-fixing, of fittings, fastenings, mobilization flash butt welding plant with contractors own labour ,machinery, tools, plants etc. with lead, lift ,descent, royalty, taxes etc. complete in all respects per direction of Engineer or authorized representative. The cut rails shall have to be returned to PWI depot by contractor at his own cost. The contractor at own cost has to establish equality control organization to ensure adequate control at stages . Unless otherwise superseded by stipulations of this contract, the welding process, all flash butt welding related activities and methodology will be governed by "Manual for flash butt welding of rails (April 2022)"with up to date correction slips issued Research Design and Standard Organization((RDSO) Ministry Of Railways Lucknow.- For 13m to 39m rail panels. | Each 517.00 or of a or and so for etc. of of of of all his the his all the the by | — | 28,251.74 | 1,46,06,149.58 |
| 3 | Carrying out ultrasonic testing of FB welded joints executed by Mobile FB plantsat site using Phased Array Ultrasonic Testing (PAUT) all types of rails as pertesting procedures circulated vide RDSO letter No CT/USFD/Phased array weldtester dated 27.06.2023 and RDSO letter No. CT/USFD/Phased array general dated 22.10.2024 from approved vender of RDSO as per latest instructions as specified and directed. The rates are inclusive of Rail surface preparation for PAUT testing, contractor's men, materials & machines complete unless other wise specified and directed. | Numbers 1615.00 by on and | — | 1,040.46 | 16,80,342.9 |
| Schedule total | ₹11,26,64,342.84 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SCCforFlashButtWelding_1.pdf
ATTACHMENT
SpecialconditionforPowerofAttorney.pdf
ATTACHMENT
TrackConditionnew.pdf
ATTACHMENT
GCC2022LatestcorrectionslipupdateduptoACS11.pdf
ATTACHMENT
Instructionstotendererwithspecialconditions.pdf
ATTACHMENT
HQJPO_Digginginthevicinityofcable_20.05.24.pdf
ATTACHMENT
RevisedTechnicalEligibilityCriteriaofPAUTweldtesterandPAUTSRT.pdf
ATTACHMENT
ProcedureordertechnicaleligibilitycriteriafortestingofFlashButtRDSOLetter27.06.23.pdf
ATTACHMENT
FBWManual-Reprint2022-IncorporateduptoCS4.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].