Loading…
Loading…
Tender ID
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹24.9 LAWARDED | AWARDED |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
14 Oct 2025, 9:30 pmClosed
Directorate of Municipal Administration
Construction of Samudaya Bhavan at Unakal village GuruGovindnagar of Ward No. 38.
DMA/2025-26/BD/WORK_INDENT49591
DMA/2025-26/BD/WORK_INDENT49591
Open
Buildings
Electronic Documents, First(One Cover)
DMA City Corporation Hubballi-Dharawada
₹750
₹60,000
27 Sept 2025
27 Sept 2025
28 Sept 2025
Construction of Samudaya Bhavan at Unakal village GuruGovindnagar of Ward No. 38.
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges Above 3.50 m height. The granite/tr...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work. For Foundation concrete including cost of all materials. Vol-1, P No-Cor-3, I No-2
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work. For Columns concrete including cost of all materials. Vol-1, P No-Cor-3, I No-8
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work. For Columns concrete including cost of all materials. Vol-1, P No-Cor-3, I No-8
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work. For Plinth Beam concrete including cost of all materials. Vol-1, P No-Cor-3, I No-1a
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work. For Beams & lintels concrete including cost of all materials. Vol-1, P No-Cor-3, I No-12
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work. For Beams & lintels concrete including cost of all materials. Vol-1, P No-Cor-3, I No-12
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work. For Beams & lintels concrete including cost of all materials. Vol-1, P No-Cor-3, I No-12
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work. For Beams & lintels concrete including cost of all materials. Vol-1, P No-Cor-3, I No-12
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work. For Slab concrete including cost of all materials. Vol-1, P No-Cor-3, I No-13,14
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work. For Slab concrete including cost of all materials. Vol-1, P No-Cor-3, I No-13,14
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .