Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹13.4 L+₹24,691.56 (1.87%)Rejected-AOC | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | S PUSHPALAKSHMI L2 | N PITCHAIPILLAY L1 |
|---|---|---|---|---|---|
| 1.001. CONSTRUCTION OF PUBLIC DISTRIBUTION SYSTEM AT KRISHNAPURAM HABITATION IN MUNNAVALKOTTAI PANCHAYAT | |||||
| 2.00 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete | 33.43 | Cum | 263 ₹8,792.09 | 245 ₹8,190.35 Lowest |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 9.27 | Cum | 2,445 ₹22,665.15 | 2,400 ₹22,248 Lowest |
| 4.00 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete | 9.61 | Cum | 6,258 ₹60,139.38 | 6,200 ₹59,582 Lowest |
| 5.00 | Filling the basement with U S Gravel including cost and conveyance of | 8.79 | Cum | 733 ₹6,443.07 | 700 ₹6,153 Lowest |
| 6.00 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A) Below Basement | 6.21 | Cum | 6,258 ₹38,862.18 | 6,000 ₹37,260 Lowest |
| 7.00 | . B) Above Basement | 17.04 | Cum | 6,350 ₹1,08,204 | 6,100 ₹1,03,944 Lowest |
| 8.00 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete I) Below Basement | 44.87 | Sqm | 547 ₹24,543.89 | 475 ₹21,313.25 Lowest |
| 9.00 | II) LINTELS, RCC SLABS, BEAMS, TEE or ELL BEAMS, | 111.71 | sqm | 1,000 ₹1,11,710 | 950 ₹1,06,124.5 Lowest |
| 10.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works | 2.02 | MT | 91,895 ₹1,85,627.9 | 90,000 ₹1,81,800 Lowest |
Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
18 Mar 2026, 3:00 pmClosed
BLOCK DEVELPOMENT OFFICER (B.PT)
BLOCK DEVELOPMENT OFFICE ,NEEDAMANGALAM
MLACDS 24- 25 Construction of PDS building at Krishnapuram in Munnavalkottai Panchayat
2026_RDTN_673854_1
3136/2024/A2
Open Tender
Civil Works
Item Rate
NEEDAMANGALAM
MLACDS 24- 25 Construction of PDS building at Krishnapuram in Munnavalkottai Panchayat
3 documents required · 3 mandatory
₹0
₹14,000
1 Sept 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. CONSTRUCTION OF PUBLIC DISTRIBUTION SYSTEM AT KRISHNAPURAM HABITATION IN MUNNAVALKOTTAI PANCHAYAT | - | - | - | - |
| 2 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete | 1 | Cum | - | - |
| 3 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 1 | Cum | - | - |
| 4 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete | 9.61 | Cum | - | - |
| 5 | Filling the basement with U S Gravel including cost and conveyance of | 8.79 | Cum | - | - |
| 6 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A) Below Basement | 6.21 | Cum | - | - |
| 7 | . B) Above Basement | 17.04 | Cum | - | - |
| 8 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete I) Below Basement | 44.87 | Sqm | - | - |
| 9 | II) LINTELS, RCC SLABS, BEAMS, TEE or ELL BEAMS, | 111.71 | sqm | - | - |
| 10 | Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works | - | MT | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
MunnaPrice.pdf
Tender Documents • 1.43 MB
MunnaTech.pdf
Additional Documents • 1.14 MB
BOQ_809966.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .