Tender Value
₹7.8 L
EMD Value
₹7,900
Closing Date
13 Feb 2026, 3:00 pmClosed
ZONAL OFFICER
ZONE-X
Providing Toilet Facility to the at CMS-Kamaraj Colony, Corporation Colony road in Div-132, U-31,Z-10
2026_CoC_655483_1
Z.O.X.C.No.E1/KKM/90/2026
Limited
Civil Works
Works
KODAMBAKKAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7,900
15 Oct 2026
11 Feb 2026
13 Feb 2026
11 Feb 2026
13 Feb 2026
11 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Installation of Vertical Bored cast in situ RCC pi...eparately ) Grade of Concrete: M25 300 mm dia pile | 18.5 | R/M | 1,564.54 | ₹28,943.99 |
| 2 | Earth work Open excavation by Mechanical Means for... the departmental officers. (Excluding Refilling) | 4.5 | CUM | 199.33 | ₹896.99 |
| 3 | Supplying and filling in foundation, basement, etc...tion and as directed by the departmental officers. | 2.15 | CUM | 391.95 | ₹842.69 |
| 4 | Cement Concrete 1:5:10 (One cement, Five crushed ...partmental officers - Mixing by mechanical means | 2.15 | CUM | 5,756.01 | ₹12,375.42 |
| 5 | Supplying, fabricating and placing in position Rib...nt and binding wire) Upto plinth / Basement level | 1,025 | KGS | 96.53 | ₹98,943.25 |
| 6 | Supplying and erecting steel centering including n...l be given after the concrete is laid). FOUNDATION | 14.15 | SQM | 756.34 | ₹10,702.21 |
| 7 | Supplying and erecting centering for plane surface...ng shall be given after the concrete is laid).BEAM | 12.85 | SQM | 1,178.29 | ₹15,141.03 |
| 8 | Supplying and erecting steel centering including n...shall be given after the concrete is laid). COLUMN | 26 | SQM | 669.67 | ₹17,411.42 |
| 9 | Supplying and erecting centering for plane surface...g shall be given after the concrete is laid). SLAB | 13.5 | SQM | 1,011.91 | ₹13,660.79 |
| 10 | Providing and laying in position, standardised con...the Department for the excess usage of materials). | 6.5 | CUM | 8,015.86 | ₹52,103.09 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_785957.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .