Loading…
Loading…
Tender Value
₹11.1 L
EMD Value
₹22,300
Closing Date
27 Aug 2026, 5:00 pm4d left
EXECUTIVE OFFICER
EXECUTIVE OFFICER NAGAR PANCHAYAT DOMCHANCH
Construction Of RCC Drain From Jugal Ram House to Jawahr Vishwakarma in ward no-9 under DNP.
2026_UDD_117528_1
UDD/DNP/02/2026-27 (2nd Call)
Open Tender
Civil Works
Percentage
90 days
KODERMA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹22,300
18 Aug 2026
18 Aug 2026
29 Aug 2026
18 Aug 2026
27 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 23.36 | M3 | 955.89 | ₹22,329.59 |
| 2 | Earthwork in excavation in foundation trenches in ordinary soil do ………E/I | 106.2 | M2 | 151.82 | ₹16,123.28 |
| 3 | Providing coarse clean sand in filling in foundation trenches or in plinth do……E/I | 8.85 | M3 | 589.51 | ₹5,217.16 |
| 4 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 116.17 | M2 | 330.34 | ₹38,375.6 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering and finishing: - All work up to plinth level (1:1.5:3) all complete as per building specification and direction of E/I. | 63.72 | M3 | 5,218 | ₹3,32,490.96 |
| 6 | Centering and shuttering including strutting ,proping of walls (any thickness) including attached pilaster butteresses plinth and string courses etc. | 371.75 | M2 | 372.72 | ₹1,38,558.66 |
| 7 | Centering and shuttering including strutting ,proping in foundation and footing etc. | 116.17 | M2 | 194.5 | ₹22,595.07 |
| 8 | Providing tor steel reinforcement in cover slab including c/b/b E/I. | 3.71 | MT | 82,096.54 | ₹3,04,578.16 |
| 9 | Add carriage of material
Brick | 3.78 | NOS | 1,579.6 | ₹5,970.89 |
| 10 | Sand | 36.18 | M3 | 395.8 | ₹14,320.04 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_158849.xls
BOQ • 0.31 MB
TENDER_DOCUMENTS.pdf
Tender Documents • 1.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].