| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
11 Aug 2022, 2:00 pmClosed
Superintending Engineer KEDC Krishnagiri
Superintending Engineer KEDC, 110/33-11KV SS Krishnagiri Campus, Kattiganapally, Rayakotta Road, Krishnagiri 635002
Work Contract for Erection of HT, LT Lines and Distributions transformer of Ex 11 KV Gopanapally feeder at Nagaondapally 33/11 KVSS under Agriculture Feeder Segregation in Town/Hosur Sub division of Hosur Division of Krishnagiri Circle under
2022_EB_244705_1
KEDC/32/22/29.07.2022/Agri Feeder Seg Gopanahally
Open Tender
Electrical Works
Works
180 days
Krishnagiri
Should be TNEB Registered Contractor
2 documents required · 2 mandatory
₹0
₹11,000
Yes
17 Aug 2022
29 Jul 2022
12 Aug 2022
29 Jul 2022
11 Aug 2022
29 Jul 2022
29 Jul 2022 - 11 Aug 2022
Amount
Excavation of Pole Pits/Stay Set:
For pole above 8.0m length by using JCB/Manual
Excavation of Stay pit of 4.5' to 5' depth using JCB/Manual
Erection of Poles and Accessories
Erection of RCC, REC, PSC poles above 8.00m length by using JCB/Manual
Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding etc.
Fixing of line materials
Fixing of HT V Cross arms 3 1/2, 4 1/2 & 5 feet
Fixing of LT 3 Phase cross arm
Fixing of HT / LT TI Fitting
Fixing of HT Pin Insulators (11/22/33KV)
Fixing of Two Tapping cross arm per cut point upto 33KV line including fixing of Discs, insulators and Jumpering etc
Fixing of LT Shackle
Paving and Stringing of conductor
Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR
Releasing and reerection (resagging) of one run of all sizes of conductor
Erection of Structure
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., with 11KV AB switch using all types of poles of size 9.14m and above length.
Erection of Distribution Transformers:
Erection of 11KV Single pole structure including erection of DT complete without centre support
Transportation charges
Transportation of all types and sizes of poles and other associated material from road side to pole pit and vice versa upto 0.50KM
Transporting of all types of poles by bullock cart or other vehicle (for all size of poles including loading and unloading) for a lead upto 5KM
Transporting of conductors of all size from road side to pit locations upto 1 KM of conductor
Transporting of Distribution Transformer / Line materials from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry)
Loading/Unloading Charges
Loading/Unloading of DT upto 100KVA
Loading/Unloading of variouse size of REC, RCC,PSC Poles above 8.0m length
Loading of conductor
Unloading of conductor
Loading/Unloading of line material
Loading and unloading of 11KV Strain Disc
Loading unloading of LT Pin Insulator, Shackle, Guy Shackle, Metal parts, LT Pin etc.,
Dismandling of Line Materials
Dismandling of RCC, REC, PSC & Metal poles of all sizes including the closing of pit
Earthing
Earthing of poles with GI wires 4 or 6 SWG by coil earthing
Concreting Works
Concreting with 1:4:8 mix using 40mm jelly including curing (material +labour) sleeve concreting of poles
Workshop Charges
Manufacturing/Alteration of Clamps
Numbering of poles including cost of paint
Drilling of holes in the Structure materials Clamps etc,
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .