Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.4 LAccepted-Finance KUMBAKONAM | ₹52.4 L | L1 | Accepted-Finance Less than estimate |
| 2 | L2₹52.8 L+₹40,340.09 (0.77%)Rejected-Finance | ₹52.8 L+₹40,340.09 (0.77%) | L2 | Rejected-Finance More than L1 |
| Sl No | Description | Qty | Unit | V GNANAPRAKASAM | SIVAKUMAR V |
|---|---|---|---|---|---|
| 1.00 | Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 5,771 | M2 | 1,57,028.91 ₹1,57,028.91 Lowest | 1,67,359 ₹1,67,359 |
| 2.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20mm,0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm& below and with 53.20kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all marerials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40mm with mechanical paver tothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,tippertrucks,paver Finisher /9m paver finisher,Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 505 of MORTH Rev-5. | 265 | M3 | 30,04,040 ₹30,04,040 Lowest | 30,21,000 ₹30,21,000 |
| 3.00 | Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm 0.17 cum 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30/VG40 and plastic waste added 4.02kgs bitumen for premixing per 10sqm including cost and conveyance of all marerials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40mm with mechanical paver tothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,tippertrucks,paver Finisher /9m paver finisher,Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 174 | M3 | 20,74,950 ₹20,74,950 Lowest | 20,88,000 ₹20,88,000 |
Tender Value
₹63 L
EMD Value
₹63,000
Closing Date
20 May 2025, 3:00 pmClosed
Executive Officer, Aduthurai
No.01, Natarajapuram South Agraharam, Aduthurai
SFC - 2025-2026 -Improvement Of BT Road At Mela maruthuvakudi Suriyan Street, Namachivayapurampallar street, Amman kovil street, Ezhi Nagar in Aduthurai Town Panchayat.
2025_DTP_557168_1
302/2025/A1
Open Tender
Civil Works
Works
120 days
Aduthurai Town Panchayat
SFC - 2025-2026 -Improvement Of BT Road At Mela maruthuvakudi Suriyan Street, Namachivayapurampallar street, Amman kovil street, Ezhi Nagar in Aduthurai Town Panchayat.
3 documents required · 3 mandatory
₹0
₹63,000
Town Panchayat Office, Aduthuai
27 Apr 2026
13 May 2025
20 May 2025
13 May 2025
20 May 2025
13 May 2025
13 May 2025 - 20 May 2025
14 May 2025
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20mm,0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm& below and with 53.20kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all marerials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40mm with mechanical paver tothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,tippertrucks,paver Finisher /9m paver finisher,Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 505 of MORTH Rev-5.
Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm 0.17 cum 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30/VG40 and plastic waste added 4.02kgs bitumen for premixing per 10sqm including cost and conveyance of all marerials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40mm with mechanical paver tothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,tippertrucks,paver Finisher /9m paver finisher,Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_665487.xls
BOQ • 0.33 MB
BIDDOCUMENT.pdf
Tender Documents • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .