Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC RUDRANAGAR P S SAGAR 24 PARGANAS SOUTH | ₹24.7 L Quoted ₹25.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹26.2 LRejected-Finance 1 6 FAKIR CHAKRABORTY LANE | ₹26.2 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹26.7 LRejected-Finance 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | ₹26.7 L | L3 | Rejected-Finance Higher than L1 |
| 4 | L4₹27.0 LRejected-Finance 1 71 SREEMANTA DEY LANE KOLKATA 700012 W B | KOLKATA | KOLKATA | WEST BENGAL | 700012 | ₹27.0 L | L4 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | ORIENTAL ENGINEERING CO. L4 | H.K.DAS AND CO. L2 | B T PROJECTS PRIVATE LIMITED L3 | NITESH MANAGEMENT L1 |
|---|---|---|---|---|---|---|---|
| 1.00All Quoted Rates are inclusive of GST @ 18% + CESS @ 1% | |||||||
| 2.00Temporary arrangement for illumination ,PA system & water supply for Bus Buffer Zone at Mandirtala Sports Ground in Connection with Ganga Sagar Mela -2026 | |||||||
| 3.00 | Carrying of submersible pump set, column pipe, valves, chlorine machine and specials from Ganga Sagar Store to work site for installation at Buffer zone tube well and back after mela period as per direction of EIC. | 1 | Units | 4,800 ₹4,800 | 4,700 ₹4,700 | 4,750 ₹4,750 | 4,602 ₹4,602 |
| 4.00 | Installation the above submersible set with column pipe by supplying necessary materials and tools on hire basis and skilled labour complete as per direction of EIC (pump sets column pipes etc to be supplied by department) | 1 | Units | 3,700 ₹3,700 | 3,600 ₹3,600 | 3,650 ₹3,650 | 3,481 ₹3,481 |
| 5.00 | Temporary installation of positive/ swellore make chlorine dosing pump motor set with all accessories to its existing base and withdrawing the same and storage to the departmental store after Mela as per direction of the EIC | 1 | No | 3,000 ₹3,000 | 2,900 ₹2,900 | 2,950 ₹2,950 | 2,808 ₹2,808 |
| 6.00 | Running maintenance of the chlorine machine during mela period for proper dosing of chlorine solution including minor repairing of the pump and motor with supply of all necessary materials for the entire work from 08-01-2026 to 16-01-2026 | 9 | Days | 340 ₹3,060 | 330 ₹2,970 | 335 ₹3,015 | 316 ₹2,844 |
| 7.00 | Running submersible pump sets at tube well by supplying skilled operating staff as per direction From 08-01-2026 to 16-01-2026 =9 Days x 10 Hrs. | 90 | Hrs | 94 ₹8,460 | 90 ₹8,100 | 93 ₹8,370 | 85 ₹7,650 |
| 8.00 | Withdrawing of submersible pump motor set after mela period from the tube well by supplying necessary Tools on hire basis and skilled labour as per direction of EIC. | 1 | Units | 2,030 ₹2,030 | 2,020 ₹2,020 | 2,025 ₹2,025 | 1,982 ₹1,982 |
| 9.00 | Guarding arrangement of the whole installation of the above item for the entire period round the clock. | 1 | Units | 2,800 ₹2,800 | 2,700 ₹2,700 | 2,750 ₹2,750 | 2,619 ₹2,619 |
| 10.00 | Erection of steel tubular pole inside ground (overall length 11 meter) on hire basis by excavation of earth of any kind of soil 2.5 mtr. Depth below ground level with proper piling at different places at sea beach with all protection to avoid accidents as per IE rules & as per direction of EIC complete (each pole should be properly earthed) on or before 07.01.2026 | 30 | Nos | 1,460 ₹43,800 | 1,450 ₹43,500 | 1,455 ₹43,650 | 1,420 ₹42,600 |
Tender Value
Refer Docs
EMD Value
₹52,500
Closing Date
13 Nov 2025, 9:00 amClosed
Executive Engineer ,SMD , PHED
Chetla , Kolkata-700027
Temporary Temporary arrangement for illumination PA system and water supply including Making temporary gate with decorative illumination arrangement for Bus Buffer Zone at Mandirtala Sports Ground Pakhirala near Vivekananda High School Ground PA S
2025_PHED_921918_3
WBPHE/EE/SMD/NIeT-33 of 2025-26
Open Tender
MISC ELECTRICAL WORKS
60 days
Kachuberia, Sagar, South 24 Pgs
Please refer Tender documents.
6 documents required · 6 mandatory
₹52,500
25 Mar 2026
24 Oct 2025
15 Nov 2025
24 Oct 2025
13 Nov 2025
24 Oct 2025
Amount
Temporary arrangement for illumination ,PA system & water supply for Bus Buffer Zone at Mandirtala Sports Ground in Connection with Ganga Sagar Mela -2026
Carrying of submersible pump set, column pipe, valves, chlorine machine and specials from Ganga Sagar Store to work site for installation at Buffer zone tube well and back after mela period as per direction of EIC.
Installation the above submersible set with column pipe by supplying necessary materials and tools on hire basis and skilled labour complete as per direction of EIC (pump sets column pipes etc to be supplied by department)
Temporary installation of positive/ swellore make chlorine dosing pump motor set with all accessories to its existing base and withdrawing the same and storage to the departmental store after Mela as per direction of the EIC
Running maintenance of the chlorine machine during mela period for proper dosing of chlorine solution including minor repairing of the pump and motor with supply of all necessary materials for the entire work from 08-01-2026 to 16-01-2026
Running submersible pump sets at tube well by supplying skilled operating staff as per direction From 08-01-2026 to 16-01-2026 =9 Days x 10 Hrs.
Withdrawing of submersible pump motor set after mela period from the tube well by supplying necessary Tools on hire basis and skilled labour as per direction of EIC.
Guarding arrangement of the whole installation of the above item for the entire period round the clock.
Erection of steel tubular pole inside ground (overall length 11 meter) on hire basis by excavation of earth of any kind of soil 2.5 mtr. Depth below ground level with proper piling at different places at sea beach with all protection to avoid accidents as per IE rules & as per direction of EIC complete (each pole should be properly earthed) on or before 07.01.2026
Providing on hire basis of LT panel board comprising with 100A -1 No as incoming &63A - No as outgoing main switches incl 160A Bus bar ,Indicator & measuring instrument etc, incl earthling arrangement & dismantling after the function.
Providing on hire basis 4way power MCB DB with required nos of 30/A way MCB as out going & 1 No 63A TPN isolator as incomer etc incl , earthling arrangement & dismantling after the function.
Providing on hire basis 8Way SP MCB DB with required nos of 16A/Way MCB as out Going & 1 No 40A DP Isolator as incomer etc incl , earthling arrangement & Dismantling after the function.
Providing on hire basis drawing of main wiring by drawing 1.1KV grade 3 ½ Core 50sq mm PVC/A al Cable through wall /floor /pavement /catenary system & Dismantling after the function.
Providing on hire basis drawing of main wiring by 1.1KV grade 3 ½ core 25 sq mm PVC/A AL cable through wall /floor/ pavement /catenary /system & dismantling after the function
Providing on hire basis drawing of 1.1 KV grade 2x7/0.36 single core PVC insulated & unsheathed copper wire & dismantling after the function.
Providing on hire basis drawing of 1.1 KV grade 2x3/0.36 single core PVC insulated & unsheathed copper wire & dismantling after the function.
Providing on hire basis 2x22 /0.3 (1.5sq mm ) + 1x22/0.3 (1.5 sq mm ) as ECC ( for separate plug & fluorescent light fittings )
Drawing of 150 watt LED street light fixture in different place of road,on hire basis from 07.01.2026 to16.01.2026 10 days x 40 fittings per day)
Supply on hire bases 4.88 M long 100 mm.. Dia. (AV). Bamboo post and erecting the same at different places in pilgrim shed as per IE rules and direction of EIC (AV distance from post to post is 20 M.)
Drawing tube light points from different feeder line to different places on salbollah/Bamboo post inside and outside Mela ground and link road of pilgrim shed as per direction of EIC with supply on hire basis 40 watt. Tube light complete set etc. with inter connection and controlling switch complete (Damaged materials will have to be replaced by the agency at their own cost) from 08.01.2026 to 16.01.2026 = 9 days x 40 pts.
Supply & fitting fixing of 2 PIN 5 amps on hire basis from 08-01-2026 to 16-01-2026
Making earthing arrangement on hire basis by supplying 5/8'' dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole.
Guarding arrangement for the whole installation of the above items for the entire period round the clock with effect from 08-01-2026 to 16-01-2026 (1 personal / shift x 3 shift per location)
PA SYSTEM Providing on hire basics microphone with stand & necessary cable for connection & dismantling after the function. from 08-01-2026 to 16-01-2026
Providing on hire basics 300W Amplifier set complete & dismantling after the function. from 08-01-2026 to 16-01-2026
Providing on hire basics Horn & Dismantling after the function & dismantling after the function. from 08-01-2026 to 16-01-2026
Providing on hire basics cordless Microphones & Dismantling after the Function from 08-01-2026 to 16-01-2026
Providing on hire basics drawing of twin core cable for connection of speaker & dismantling after the function. from 08-01-2026 to 16-01-2026
Providing on hire basics staff for entire PA system as & when required round the clock. from 08-01-2026 to 16-01-2026
Temporary arrangement for illumination ,PA system & water supply for Bus Buffer Zone at Pakhirala (Vivekananda High School Ground) in Connection with Ganga Sagar Mela -2026
Carrying of submersible pump set, column pipe, valves, chlorine machine and specials from Ganga Sagar Store to work site for installation at Buffer zone tube well and back after mela period as per direction of EIC.
Installation the above submersible set with column pipe by supplying necessary materials and tools on hire basis and skilled labour complete as per direction of EIC (pump sets column pipes etc to be supplied by department)
Temporary installation of positive/ swellore make chlorine dosing pump motor set with all accessories to its existing base and withdrawing the same and storage to the departmental store after Mela as per direction of the EIC
Running maintenance of the chlorine machine during mela period for proper dosing of chlorine solution including minor repairing of the pump and motor with supply of all necessary materials for the entire work from 10-01-2026 to 16-01-2026
Running submersible pump sets at tube well by supplying skilled operating staff as per direction From 10-01-2026 to 16-01-2026 = 7 Days x 10 Hrs.
Withdrawing of submersible pump motor set after mela period from the tube well by supplying necessary Tools on hire basis and skilled labour as per direction of EIC.
Guarding arrangement of the whole installation of the above item for the entire period round the clock.
Erection of steel tubular pole inside ground (overall length 11 meter) on hire basis by excavation of earth of any kind of soil 2.5 mtr. Depth below ground level with proper piling at different places at sea beach with all protection to avoid accidents as per IE rules & as per direction of EIC complete (each pole should be properly earthed) on or before 07.01.2026
Providing on hire basis of LT panel board comprising with 100A -1 No as incoming &63A - No as outgoing main switches incl 160A Bus bar ,Indicator & measuring instrument etc, incl earthling arrangement & dismantling after the function.
Providing on hire basis 4way power MCB DB with required nos of 30/A way MCB as out going & 1 No 63A TPN isolator as incomer etc incl , earthling arrangement & dismantling after the function.
Providing on hire basis 8Way SP MCB DB with required nos of 16A/Way MCB as out Going & 1 No 40A DP Isolator as incomer etc incl , earthling arrangement & Dismantling after the function.
Providing on hire basis drawing of main wiring by drawing 1.1KV grade 3 ½ Core 50sq mm PVC/A al Cable through wall /floor /pavement /catenary system & Dismantling after the function.
Providing on hire basis drawing of main wiring by 1.1KV grade 3 ½ core 25 sq mm PVC/A AL cable through wall /floor/ pavement /catenary /system & dismantling after the function
Providing on hire basis drawing of 1.1 KV grade 2x7/0.36 single core PVC insulated & unsheathed copper wire & dismantling after the function.
Providing on hire basis drawing of 1.1 KV grade 2x3/0.36 single core PVC insulated & unsheathed copper wire & dismantling after the function.
Providing on hire basis 2x22 /0.3 (1.5sq mm ) + 1x22/0.3 (1.5 sq mm ) as ECC ( for separate plug & fluorescent light fittings )
Drawing of 150 watt LED street light fixture in different place of road,on hire basis from 07.01.2026 to16.01.2026 (10 days x 55 fittings per day)
Supply on hire bases 4.88 M long 100 mm.. Dia. (AV). Bamboo post and erecting the same at different places in pilgrim shed as per IE rules and direction of EIC (AV distance from post to post is 20 M.)
Drawing tube light points from different feeder line to different places on salbollah/Bamboo post inside and outside Mela ground and link road of pilgrim shed as per direction of EIC with supply on hire basis 40 watt. Tube light complete set etc. with inter connection and controlling switch complete (Damaged materials will have to be replaced by the agency at their own cost) from 08.01.2026 to 16.01.2026 = 9 days x 50 pts.
Supply & fitting fixing of 2 PIN 5 amps on hire basis from 08-01-2026 to 16-01-2026
Making earthing arrangement on hire basis by supplying 5/8'' dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole.
Guarding arrangement for the whole installation of the above items for the entire period round the clock with effect from 08-01-2026 to 16-01-2026 ( 1 personal /shift x 3 shift per location)
PA SYSTEM Providing on hire basics microphone with stand & necessary cable for connection & dismantling after the function. from 10-01-2026 to 16-01-2026
Providing on hire basics 300W Amplifier set complete & dismantling after the function. from 10-01-2026 to 16-01-2026
Providing on hire basics Horn & Dismantling after the function & dismantling after the function. from 10-01-2026 to 16-01-2026
Providing on hire basics cordless Microphones & Dismantling after the Function from 10-01-2026 to 16-01-2026
Providing on hire basics drawing of twin core cable for connection of speaker & dismantling after the function. from 10-01-2026 to 16-01-2026
Providing on hire basis staff for entire PA system as & when required round the clock. from 10-01-2026 to 16-01-2026
Making temporary gate with decorative illumination arrangement at Pakhirala and Mandirtala Bus Buffer Zone in connection with Ganga Sagar Mela 2026
Hire and labour charges for temporary gate structure as per desighn and direction of EIC. with salbollah / bamboo post of approved size and runner, cross support, vertical support and covering with different coloured cloth and dismantling the same after completion of the mela.
Making temporary decorative lighting arrangement of gate structure on hire basis by fitting fixing at site decorative boards on salbollah / bamboo gate structures including decorative design LED lighting power with different colour LED lights. The board should have in built power circuit board for operating in 230 volt 50Hz AC supply with controller etc and dismantling after completion of mela. [4 Nos. x 1 side]
Temporary arrangement for PA system at Kachuberia and Watch towers( No. 1,4,5 ,6 ,8,9 & 11) in Connection with Ganga Sagar Mela -2026
Providing on hire basics microphone with stand & necessary cable for connection & dismantling after the function. from 06-01-2026 to 16-01-2026
Providing on hire basics 300W Amplifier set complete & dismantling after the function. from 06-01-2026 to 16-01-2026
Providing on hire basics Horn & Dismantling after the function & dismantling after the function. from 06-01-2026 to 16-01-2026
Providing on hire basics cordless Microphones & Dismantling after the Function from 06-01-2026 to 16-01-2026
Providing on hire basics drawing of twin core cable for connection of speaker & dismantling after the function. from 06-01-2026 to 16-01-2026
Providing on hire basis staff for entire PA system as & when required round the clock from 06-01-2026 to 16-01-2026 ( 1 No. x 3shift x 11 days )
H.K.DAS AND CO. (BID ID -7201731)
B T PROJECTS PRIVATE LIMITED (BID ID -7216333)
ORIENTAL ENGINEERING CO. (BID ID -7197485)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_2182425.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid