Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.1 LAdmitted-Finance | -3.87% | ₹10.1 L | L1 | Admitted-Finance |
Tender Value
₹11 L
EMD Value
₹22,000
Closing Date
12 May 2026, 6:00 pmClosed
Commissioner
Municipal Council Balotra
Construction of Public Reading room near Shree Vishawakarma Samaj Samiti at Vishawakarma Colony Balotra
2026_DLB_555653_2
02/2026-27
Open Tender
Civil Works - Buildings
Percentage
Balotra
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
as per nit
₹22,000
Yes
27 May 2026
2 May 2026
13 May 2026
2 May 2026
12 May 2026
2 May 2026
2 May 2026 - 12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. includingdressing of sides and ramming of bottoms, including getting out theexcavated material, refilling after laying pipe/ foundation anddisposal of surplus excavated material at a lead upto 50m suitablesite as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt,clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 35.55 | cum | 229.5 | ₹8,159.41 |
| 2 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40mm nominal size). flooring pcc | 12.93 | cum | 4,575 | ₹59,160.47 |
| 3 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. | 33.4 | cum | 159 | ₹5,310.2 |
| 4 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting,propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. Step-1, step-2 | 9.44 | sqm | 236.5 | ₹2,233.51 |
| 5 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand), Ist Sort longitudinal, varanda foundation, Ist Sort lateral, 2nd sort longitudinal, varanda foundation, 2nd sort lateral, 3rd sort longitudinal, varanda foundation, 3rd sort lateral | 26.92 | cum | 4,860 | ₹1,30,839.46 |
| 6 | Centring and shuttering with plywood or steel sheet upto two storiesor height upto 7.5 metre above plinth level including strutting,propping etc. and removal of form for :Lintels, beams, plinth beams, girders, bressumers and cantilevers., plinth beam | 12.8 | sqm | 426 | ₹5,454.5 |
| 7 | Centring and shuttering with plywood or steel sheet upto two storiesor height upto 7.5 metre above plinth level including strutting,propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts., column | 28.29 | sqm | 375 | ₹10,608 |
| 8 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting,propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform, slab/ roof | 44.53 | sqm | 456 | ₹20,305.68 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size), footing step-1, step-2 | 2 | cum | 6,340 | ₹12,667.32 |
| 10 | Providing and laying damp-proof course with cement concrete grade M-15 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification . 50mm thick. | 7.57 | sqm | 445 | ₹3,367.32 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
Tendernotice_2.pdf
PDF • 0.37 MB
BOQ_989481.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .