| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.3 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹20.5 L+₹21,077.61 (1.04%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹20.9 L
EMD Value
₹21,000
Closing Date
22 Jul 2020, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT -SFC MI Tanks and Ponds 2019-20- Thally Block -6 Works- Package No TN-04-KRI-150
2020_RDTN_171119_1
Roc_No_5732_2020_R4_15_06_20
Open Tender
Civil Works - Water Works
Item Rate
180 days
krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹21,000
DRDA Krishnagiri
27 Jul 2020
13 Jul 2020
22 Jul 2020
13 Jul 2020
22 Jul 2020
13 Jul 2020
13 Jul 2020
Amount
1.Renovation of Byregoundan Kuttai @ Seerthimmanetti H/O Anniyalam - Rs.2.66 Lakhs
Clearing Scrub Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Boundry Stone
Provision of Name Board
2. Renovation of Velaiayan / Kullegoundan Kuttai @ Kurubarapalli H/O Ballapalli - Rs. 5.18 Lakhs
Clearing Scrub Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earth work deploying earth moving machinery fordesilting of channel and forming bund on eiethr side and depositingthe earth on banksincluding jungle etc., Complete . PWD SOR 2020-21, Sl No. 88(2), Page-29.
Weir Estimate
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Centering below GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Centering above GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Boundry Stone
Provision of Name Board
3.Renovation of Savulu Kuttai @ Marudhanapalli H/O Marudhanapalli - Rs. 5.80 Lakhs
Clearing Scrub Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earth work deploying earth moving machinery fordesilting of channel and forming bund on eiethr side and depositingthe earth on banksincluding jungle etc., Complete . PWD SOR 2020-21, Sl No. 88(2), Page-29.
Weir Estimate
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Centering below GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Centering above GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Boundry Stone
Provision of Name Board
4.Renovation of Marudhanapalli Kuttai @ Annasagaram H/O Marudhanapalli - Rs. 2.30 Lakhs
Clearing Scrub Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earth work deploying earth moving machinery fordesilting of channel and forming bund on eiethr side and depositingthe earth on banksincluding jungle etc., Complete . PWD SOR 2020-21, Sl No. 88(2), Page-29.
Boundry Stone
Provision of Name Board
5.Renovation of Marudhanapalli Vigneshwaran Kuttai @ Annasagaram H/O Marudhanapalli - Rs. 2.44 Lakhs
Clearing Scrub Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earth work deploying earth moving machinery fordesilting of channel and forming bund on eiethr side and depositingthe earth on banksincluding jungle etc., Complete . PWD SOR 2020-21, Sl No. 88(2), Page-29.
Boundry Stone
Provision of Name Board
6.Renovation of Ramayan Kuttai @ Gopalaiyan Thottai H/O Marudhanapalli - Rs. 2.50 Lakhs
Clearing Scrub Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earth work deploying earth moving machinery fordesilting of channel and forming bund on eiethr side and depositingthe earth on banksincluding jungle etc., Complete . PWD SOR 2020-21, Sl No. 88(2), Page-29.
Boundry Stone
Provision of Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
T.JAYAPRAKASH
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .