Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-Finance | L1 | Accepted-Finance FIRST LOWEST TENDERER FOR L1 | |
| 2 | L2₹1.3 Cr+₹11,254.25 (0.09%)Rejected-Finance | L2 | Rejected-Finance SECOND LOWEST TENDERER FOR L2 | |
| 3 | L3₹1.3 Cr+₹2.8 L (2.21%)Rejected-Finance NO 30 CO OPERATIVE COLONY 8TH CROSS STREET MEDICAL COLLEGE ROAD THANJAVUR 613 007 | THANJAVUR | THANJAVUR | TAMIL NADU | 613007 | L3 | Rejected-Finance THIRD LOWEST TENDERER FOR L3 | |
| 4 | L4₹1.3 Cr+₹5.9 L (4.69%)Rejected-Finance | L4 | Rejected-Finance FOURTH LOWEST TENDERER FOR L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-INCORRECT UDIN IN ATO AND NETWORTH CERTIFICATES. |
| Sl No | Description | Qty | Unit | Shri Maruthi Constructions L4 | GM CONSTRUCTIONS AND INFRA PRIVATE LIMITED L3 | GS ASSOCIATES L1 | B SARAVANAKUMAR L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 707.35 | m3 | 190 ₹1,34,396.5 Lowest | 260 ₹1,83,911 | 230 ₹1,62,690.5 | 250 ₹1,76,837.5 |
| 2.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 17.18 | m3 | 200 ₹3,436 | 120 ₹2,061.6 | 110 ₹1,889.8 Lowest | 110 ₹1,889.8 Lowest |
| 3.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 46.19 | m3 | 40 ₹1,847.6 Lowest | 140 ₹6,466.6 | 130 ₹6,004.7 | 150 ₹6,928.5 |
| 4.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 68.8 | m3 | 1,700 ₹1,16,960 Lowest | 2,000 ₹1,37,600 | 1,700 ₹1,16,960 Lowest | 2,100 ₹1,44,480 |
| 5.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 192.35 | m3 | 300 ₹57,705 Lowest | 600 ₹1,15,410 | 600 ₹1,15,410 | 600 ₹1,15,410 |
| 6.00 | Supplying and filling in foundation, basement, etc with Sand Gravel mix in ratio of 1:3 in layers of not more than 15cm thick thoroughly mixed, well watered, rammed with surface vibrator and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 88.85 | m3 | 1,700 ₹1,51,045 | 1,050 ₹93,292.5 Lowest | 1,400 ₹1,24,390 | 1,100 ₹97,735 |
| 7.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification - by Machanical means | 42.68 | m3 | 4,800 ₹2,04,864 Lowest | 5,500 ₹2,34,740 | 5,200 ₹2,21,936 | 5,400 ₹2,30,472 |
| 8.00Brick work in following Cement Mortar using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing,etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. CM 1:5 | |||||||
| 8.01 | Foundation and Basement | 110.75 | m3 | 6,200 ₹6,86,650 Lowest | 7,400 ₹8,19,550 | 6,250 ₹6,92,187.5 | 7,300 ₹8,08,475 |
| 9.00Brick work in following Cement Mortar using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing,etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. CM 1:6 | |||||||
Tender Value
₹1.5 Cr
EMD Value
₹83,900
Closing Date
19 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of the Superintending Engineer, PWD., Building Construction and Maintenance Circle, Thanjavur-1
Construction of Modern Kitchen Building for Government Raja Mirasudhar Hospital at Thanjavur in Thanjavur District
2026_PWD_720931_1
17-2-2026-2027
Open Tender
Civil Works - Buildings
Lump-sum
150 days
Thanjavur
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹83,900
23 Nov 2026
5 Nov 2026
20 Nov 2026
5 Nov 2026
19 Nov 2026
5 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 707.35 | m3 | - | - |
| 2 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 17.18 | m3 | - | - |
| 3 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 46.19 | m3 | - | - |
| 4 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 68.8 | m3 | - | - |
| 5 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 192.35 | m3 | - | - |
| 6 | Supplying and filling in foundation, basement, etc with Sand Gravel mix in ratio of 1:3 in layers of not more than 15cm thick thoroughly mixed, well watered, rammed with surface vibrator and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 88.85 | m3 | - | - |
| 7 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification - by Machanical means | 42.68 | m3 | - | - |
| 8Brick work in following Cement Mortar using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing,etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. CM 1:5 | |||||
| 8.01 | Foundation and Basement | 110.75 | m3 | - | - |
| 9Brick work in following Cement Mortar using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing,etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. CM 1:6 | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
MODERNKITHCENATRMHCON.pdf
Tender Documents • 3.02 MB
BOQ_865712.xls
BOQ • 0.44 MB
CorrigendumNo17.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .